4427 search results for fla

E6P28BidTabs

114,000.00 0105 E536 6425 GUARDRAIL END TREATMENT-FLARED APPROACH TERMINAL, REPLACE, MASH 20.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2024/apr25/e6p28bidtabs.pdf?sfvrsn=29c3060d_1

2025FDM124QC

to check that the BIM adheres to design criteria, is void of design flaws, and complies, delivery. Many design flaws are identified in the review of the plans, however, reviews within

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm124qc.pdf?sfvrsn=84b8208_1

2026FDM124QC

to design criteria, is void of design flaws, and complies with Department requirements. These reviews are conducted by the discipline QC Reviewers prior to each phase delivery. Many design flaws

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm124qc.pdf?sfvrsn=96269315_2

2026FDM124QC

to design criteria, is void of design flaws, and complies with Department requirements. These reviews are conducted by the discipline QC Reviewers prior to each phase delivery. Many design flaws

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm124qc.pdf?sfvrsn=5fcd6a15_2

03_Geometric_Design_Redlines

......................................................... 3–83 Ta b le 3-30 Design Lengths of Speed Change Lanes Flat Grades - 2 Percent or Less, design criteria for specific design elements such as flatter curves and longer sight distances

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/03_geometric_design_redlines.pdf?sfvrsn=60e6275c_6

03_Geometric_Design_Rulemaking

–83 Ta b le 3-30 Design Lengths of Speed Change Lanes Flat Grades - 2 Percent or Less, such as flatter curves and longer sight distances should be used where practical, particularly on high

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/03_geometric_design_rulemaking.pdf?sfvrsn=8f471f57_1

641-020FHWAApprovedPkg

is based on level ground (flatter than 1:5). Increase to 60% of Ultimate before transfer. of Ultimate, and reinforcing. 1. Diameter of 12-sided poles are measured flat to flat. (See Note 2) (in/ft) Taper

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2025/641-020fhwaapprovedpkg.pdf?sfvrsn=29f99266_1

SR-714-Grade-Separation-ReportA 2001

None FATAL FLAWS None COST ANALYSIS The approximate construction cost for the intersection, right turn movements. FATAL FLAWS None COST ANALYSIS The approximate construction cost, FLAWS None COST ANALYSIS The approximate construction cost for the intersection improvement only, movement onto US-1. This eliminates the left turn movement onto US-1 from this lane. FATAL FLAWS 1, . This allows vehicles exiting from Scotty’s, United Way, and FPL to return to US-1. FATAL FLAWS 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/montereyrd-fec-study-documents/sr-714-grade-separation-reporta-2001.pdf?sfvrsn=8915b604_1

700-020IntReviewPkg

. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may, Connection Details). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged, Specification 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/700-020intreviewpkg.pdf?sfvrsn=20341f5c_1

700-020IntReviewPkg

and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may be Reinforcing bars, ). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D, 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/700-020intreviewpkg7e60f248-23cf-4237-9342-57b2cb2600a6.pdf?sfvrsn=9515ce69_1

700-020IndReviewPkg

and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may be Reinforcing bars, ). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D, 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/700-020indreviewpkg.pdf?sfvrsn=c64790ef_1

700-020FHWAReviewPkg

and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may be Reinforcing bars, ). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D, 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/700-020fhwareviewpkg.pdf?sfvrsn=578125a3_1

700-020FHWAApproved

and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may be Reinforcing bars, ). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D, 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/700-020fhwaapproved.pdf?sfvrsn=38d43c6e_1

6490500-122FHWA

on one flat with a corresponding reference mark on the 6490500 All Jobs anchor nut and base plate, fastener assembly consisting of a machine screw (No. 8, 5/8 inch long), nut and two flat washers (1/4 inch inside diameter) and lock washer. Tightly clamp the screen layers between the flat washers, the reference position of each snug-tight nut on one flat with a corresponding reference mark, inch long), nut and two flat washers (1/4 inch inside diameter) and lock washer. Tightly clamp

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/6490500-122fhwa.pdf?sfvrsn=7dcd09d3_2

9160201-122FHWA

for PG 76-22 (ARB)) Flash Point, AASHTO T 48-18 Cleveland Open Cup Minimum 450ºF Rotational, Minimum 99.0% (Not applicable for PG 76-22 (ARB)) Flash Point, AASHTO T 48-18 Cleveland Open Cup

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/9160201-122fhwa.pdf?sfvrsn=fc838476_2
20 of 4427 results