3755 search results for REPORT NUMBER

F4006NonTechSpecs

DEPARTMENT OF TRANSPORTATION Financial Project Number: 444761-5-52-01 Project Name: FDOT DISTRICT IV MAIN, attached to the front of an awarded contract which identifies the bidder, financial project number, calendar days, contract number, total contract sum, date of execution, etc. BIDDER: An individual, : The date the Owner opens the bid proposals. CONTRACT TIME: The number of calendar days allowed, of completion is stipulated in lieu of a number calendar days, the contract shall be completed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/fcp/f4006/f4006nontechspecs.pdf?sfvrsn=976126b0_2

E4X61Appendix001

(TSM&O) Device Maintenance Contract, District Four Financial Project Number(s): 406795-7-72-01 and various Proposal/Contract Number: E4X61 Intelligent Transportation Systems (ITS) Maintenance, it is an Emergency repair. The Contractor shall prepare and submit a diagnostic report to the Department’s Project Manager. The report shall include a damage assessment, cost estimates, details about the incident (date, time, cause of damage).  Obtain the police report if applicable

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4x61/e4x61appendix001.pdf?sfvrsn=b2e9e9f6_1

16140000 - MP 0.345 - Intersection Safety Study - FINAL_10-27-2020

and Derby Avenue within the five-year time period. Crash Report Number 85621543: A sideswipe collision, of Vehicle 1 was under DUI (drug under influence). Crash Report Number 85895260: A left-turn, for the intersection. 2.0 EXISTING CONDITIONS This section of the report describes the existing, in Table 1, and collision diagrams and collision summary sheets are included in Appendix C of this report, for this study intersection was calculated based on the number of crashes per million entering

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/16140000---mp-0-345---intersection-safety-study---final_10-27-2020.pdf?sfvrsn=9b4fb9bf_1

Florida TIM Responder - June 2022

Road Ranger operators killed in struck by vehicle incidents. Examining crash report statistics from, RESPONDER V3 / ISSUE 2 • 2022 TIM RESPONDER V3 / ISSUE 2 • 2022 Incidents by the Numbers Road, incident responders have received training in the state of Florida (as of April 11, 2022). That number, in EV implementation, first responders are also handling the challenges of the increased number of EV, characteristics such as the number of lanes and sightline issues » Improved interoperability

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/newletters/florida-tim-responder---june-2022.pdf?sfvrsn=9e2ec795_1

43359245801-PLANS-05-LIGHTING

LICENSE NUMBER 61661 SCALAR CONSULTING GROUP INC. PLANTATION, FLORIDA 33324 LIGHTING PLANS SHEETS, JULIO C. DELGADO, P.E. 8751 W. BROWARD BOULEVARD, SUITE 307 P.E. LICENSE NUMBER 61661 SCALAR, OF QUANTITIES NO. ITEM PAY DESCRIPTION UNIT SHEET NUMBERS SHEET THIS TOTAL L-10 L-11 L-12 L-13 L-14, LICENSE NUMBER 61661 SCALAR CONSULTING GROUP INC. PLANTATION, FLORIDA 33324 L-4 TABULATION OF QUANTITIES TABULATION OF QUANTITIES NO. ITEM PAY DESCRIPTION UNIT SHEET NUMBERS SHEET

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25111/43359245801-plans-05-lighting.pdf?sfvrsn=6bd67836_1

SP4550000DB-122

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/design-build/sp4550000db-122.pdf?sfvrsn=951c94e4_2

SP4550000DB-721

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/sp4550000db-721.pdf?sfvrsn=cb06bab9_2

SP4550000DB

construction operations. Submit a written report by the divers to the Engineer indicating the results, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, of the conduct and the results of the test. 455-2.8 Required Reports: Submit a static load test report, pile/shaft construction. Include in the report of the load test the following information: 1, . In addition, submit a report showing an analysis of the results of axial load and lateral load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/design-build/sp4550000db3974934a4ac24aa1a96883779ad54def.docx?sfvrsn=f0b6d904_2

SP4550000DB-722AddChng impl

report by the divers to the Engineer indicating the results of their underwater inspection before, to measure the distribution of the load. Ensure that the type, number, and location of the strain, : Submit a static load test report signed and sealed by the Specialty Engineer to the Engineer for review, , prior to beginning production pile/shaft construction. Include in the report of the load test, calibration certifications. In addition, submit a report showing an analysis of the results of axial

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/sp4550000db-722addchng-impl.pdf?sfvrsn=e9fcba72_2

SP4550000DB-722-AddChng origind

a written report by the divers to the Engineer indicating the results of their underwater inspection, , number, and location of the strain gauges are as shown in the Plans or as directed, of the test. 455-2.8 Required Reports: Submit a static load test report signed and sealed, . Include in the report of the load test the following information: 1. A tabulation of the time, together with instrument calibration certifications. In addition, submit a report showing an analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/sp4550000db-722-addchng-origind.pdf?sfvrsn=8656b756_2

SP4550000DB-722origind

the Contractor to proceed with subsequent construction operations. Submit a written report by the divers, that the type, number, and location of the strain gauges are as shown in the Plans or as directed, and the results of the test. 455-2.8 Required Reports: Submit a static load test report signed and sealed, construction. Include in the report of the load test the following information: 1. A tabulation, together with instrument calibration certifications. In addition, submit a report showing an analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/sp4550000db-722origind.pdf?sfvrsn=368c4ff0_2

SP4550000DB-122impl

authorizing the Contractor to proceed with subsequent construction operations. Submit a written report, to measure the distribution of the load. Ensure that the type, number, and location of the strain gauges, a static load test report signed and sealed by the Specialty Engineer to the Engineer for review, , prior to beginning production pile/shaft construction. Include in the report of the load test, calibration certifications. In addition, submit a report showing an analysis of the results of axial load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/sp4550000db-122impl.pdf?sfvrsn=8f7e0257_2

SP4550000DB-122origind

to proceed with subsequent construction operations. Submit a written report by the divers to the Engineer, . Ensure that the type, number, and location of the strain gauges are as shown in the Plans or as directed, and the results of the test. 455-2.8 Required Reports: Submit a static load test report signed, construction. Include in the report of the load test the following information: 1. A tabulation, together with instrument calibration certifications. In addition, submit a report showing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/sp4550000db-122origind.pdf?sfvrsn=81d86f2c_2

fm5-541

markings, etc.). 4. REPORT Use Form Number 700-050-70, Traffic Marking Certification, to record, . 3.2.6. Permanent Tape Measure the thickness of each batch number, prior to application, using, . Report the average of the six measurements. 6.1.4. For Profiled Thermoplastic, also take thickness, Avenue Gainesville, Florida 32609 August 7, 2023 FM 5-541 9 7. REPORT 7.1. For Pavement Marking, using APL field evaluation data: Report all field evaluation data (thickness, retroreflectivity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/fstm/methods/fm5-541.pdf?sfvrsn=49b251be_8

Peer Exchange Final Report (8-3-21)

Peer Exchange Final Report (8-3-21),  1 Florida and Louisiana 2021 Peer Exchange Final Report FLORIDA - LOUISIANA PEER EXCHANGE, to learn more in this specialized topic. This report highlights the key observations, and to report on any lessons learned. Appendix B contains a copy of all presentations. Jill Stark – Turner, of ease of obtaining them. Dr. Das noted that they did ask for a number of no- cost extensions, to organizational systems. The increased number of employees transitioning to telework had

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/docs/peer-exchange-final-report-(8-3-21).pdf?sfvrsn=a3aafd4f_1

9650200-723FHWA

Requirements Documentation Requirements Certified Test Report Shows that product meets Moment, Display’s the manufacturer’s name or logo and the model number. Product Photo Displays the significant, of 10,000 foot-pounds, without breaking, cracking or rupturing in any manner. Certified Test Report, Requirements Documentation Requirements Certified Test Report Shows that product meets Moment Capacity, the manufacturer’s name or logo and the model number. Product Photo Displays the significant

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9650200-723fhwa.pdf?sfvrsn=22aaf68b_1

IA Project Review

the Financial Project Number (FPN) and select the entry from the returned list. You will be navigated, the finding under the ERS tab. b. Final Commercial Inspection Report – does not apply to ERS. c. Final Construction Compliance Report – does not apply to ERS. d. Final Quantity of Reinforcing Steel on the Contract – does not apply to ERS. e. Final Sign Inspection Report – does not apply to ERS. f, ) (Finding number(s)) M. Promoting a Finding to MAR MAR stands for Materials Acceptance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/mac/training/ers/ia-project-review.pdf?sfvrsn=17798420_2

FY2026 Concept Paper Instructions - 12.20.24 (Final)

document number for the concept paper can be located at the top of the page. This document can also, be repeated until the desired number of concept papers have been created. Please save your entries often, that the project is in (e.g., Year 1, Year 2, or Year 3) and the previous year’s project number, . The Quick Stats Report allows users to filter by date range, geographic area, and/or by law enforcement agency. After filters have been applied, a report will be generated with counts on total

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/fy2026-concept-paper-instructions---12-20-24-(final).pdf?sfvrsn=492a430d_1

Assignment Log 6.17.25

to the number of firms being added, this was broken into 2 amendments. In DocuSign as of 12/4/24, on the report card due to federal funds and not encumbered in time CA886 SA 9 R. Arocho Atkins North, 07/02/24 08/06/24 08/22/24 August 08/22/24 08/22/24 RA 08/29/24 $191,959 09/26/24 09/30/24 August Report, $328,138 09/10/24 09/10/24 September Report Card Item 446207-1 A 13 R. Lycans Scalar Consulting, 08/21/24 08/27/24 09/18/24 $49,676 09/25/24 09/25/24 September Report Card Item CAT36 CA 1 E. Bell WGI

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/amendment-assignment-log---updated-daily/assignment-log-6-17-25.pdf?sfvrsn=aec1c34_1

Assignment Log 6.30.25

for firms needing to be added was requested. Cabrina took this over in Aug. Due to the number of firms being, ; this will be a miss on the report card due to federal funds and not encumbered in time CA886 SA 9 R, 08/22/24 08/22/24 RA 08/29/24 $191,959 09/26/24 09/30/24 August Report Card Item CAR41 A 3 C, 09/10/24 September Report Card Item 446207-1 A 13 R. Lycans Scalar Consulting Group, Inc. S. Andrews, 09/18/24 $49,676 09/25/24 09/25/24 September Report Card Item CAT36 CA 1 E. Bell WGI, Inc. Medium

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/amendment-assignment-log---updated-daily/assignment-log-6-30-25.pdf?sfvrsn=ea29f145_1
20 of 3755 results