3761 search results for REPORT NUMBER

Initial Phase Checklist

for document(s) provided with submittal, or document progress made on report(s) preparation): Include FM Number and Project Name on Report Cover. ☐ Cultural Resource Assessment Survey (CRAS) Report ☐ Wildlife Study Report or Natural Resource Evaluation (NRE) ☐ Wetland Survey Report or NRE (can, Asbestos Report/Lead Based Paint Report ☐ Level I and II Contamination Assessment Report Project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d4lap/projectmanagementanddistrictresources/initial-phase-checklist_fec7d4fd-bddd-4193-aa6d-16cff31eb891.pdf?sfvrsn=b2eb99d6_2

Secondary Crash Report

Secondary Crash Report,  SunGuide® Report Information Last Updated: 2022/08/15 Version: 1.0 1. Report Name: Secondary Crash Report 2. Purpose of the Report: To provide a list of correlated lane blocking events in which a crash (secondary event is bound to crash event type) ensues a primary event. 3. Report Sections: The sections in the report provide a summary of the report generation with the associated, for the report Provides the date the Secondary Crash Report was generated, associated district

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/reports/secondary-crash-report.pdf?sfvrsn=bb872f9d_1

fdotconnect-cadd-software-disclaimer

report in OBM 2024 (v24.00.00.263) & OBM 2024 Update 1 (v24.00.01.053) where some elements are reported multiple times in the RAW report. There is a work-around to this issue that is covered by this white paper: obm2024-rawreportduplicateremovalworkflow.pdf CERTIFIED VERSION NUMBERS

https://www.fdot.gov/cadd/downloads/software/fdotconnect-cadd-software-disclaimer

EYW

Archives Historical AirportInspection Reports Select a report... Inspection Report 01-17-2025 Inspection Report 02-02-2024 Inspection Report 02-17-2023 Inspection Report 01-14-2022 Inspection Report 07-01-2021 Inspection Report 01-17-2020 Inspection Report 03-01-2019 Inspection Report 03-09-2018 Updated Inspection Report 03-09-2018 Inspection Report 04-12-2017 Inspection Report 03-29-2016 Inspection Record 03-10-2015 Inspection Record 04-16-2014 Inspection

https://www.fdot.gov/aviation/airportslist/EYW

170019_2021-03-29_INSPECTION REPORT REGULAR NBI

170019_2021-03-29_INSPECTION REPORT REGULAR NBI,  BRIDGE INSPECTION REPORT PREPARED FOR: FLORIDA DEPARTMENT OF TRANSPORTATION BRIDGE OWNER: FLORIDA DEPARTMENT OF TRANSPORTATION DBi INSPECTED BY: KCA BRIDGE NO. 170019 CONTENTS OF REPORT INSPECTION DATE: 03/29/2021 BrM Report U/W Inspection Report CIDR * Fracture Critical Data Scour, ) *This section is not included in this report. US-41 (SR-45) over Hudson Bayou 0.5 Mile South of US-301, : LOCATION: 1 Reinforced Concrete - 04 Tee Beam 0.5MI S OF US-301 This report contains information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26105/170019_2021-03-29_inspection-report-regular-nbi.pdf?sfvrsn=d7d0acb3_1

1020509.FHWA

Highway Research Program Report 350 (NCHRP 350) or the Manual for Assessing Safety Hardware 2009, and Category III devices for inclusion on the QAPL shall include the FHWA WZ numbered acceptance letter, for proper application, field assembly and installation. Ensure that the QPL or APL number is permanently, control devices must meet the requirements of National Cooperative Highway Research Program Report, on the APL shall include the FHWA WZ numbered acceptance letter with attachments and vendor drawings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/1020509.fhwa.pdf?sfvrsn=22c9d445_0

2025 EQ Report Examples

2025 EQ Report Examples, Design Manual BOE Estimated Quantities Report Examples 11/1/2024 2 | (Back to top) Report Formatting: Each page of the Estimated Quantities Report will contain a Summary Table with pay item and quantity information, the date and time, and a page number. Estimated Quantities Report Examples, /description and “continued” at the top of each page. The Summary Report Builder will add 3 blank rows to the end of each Summary Table when generating the EQ Report - On occasion the blank rows

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2025-eq-report-examples.pdf?sfvrsn=3f6e852c_1

CADDManual2025-RecordOfChanges

 CADD Manual In reference to the FDOT Design Manual (FDM) For FDOT Connect and FDOT C3D TOPIC NUMBER: 625-050-001 January 20242025 PRODUCTION SUPPORT CADD OFFICE TALLAHASSEE, FLORIDA http, .........................................................................7-12 Sheets Numbering, 7.9.2.1 Structural Sheet Numbers, ) ..................................................................................................................... 8-6 Estimated Quantities Report PDF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/publications/caddmanualconnect-c3d/caddmanual2025-recordofchanges.pdf?sfvrsn=53087c1e_1

SPI-521-600

(SDG) ; NCHRP Report 663 , Design of Roadside Barrier Systems Placed on MSE Retaining Walls, ). See report "Field Test of a "GBA" Safety Barrier Erected on a Reinforced Earth Wall", May, 1982, the traffic/pedestrian railing Index numbers. Commentary: Standard bridge traffic railings, when, a reference to the associated traffic railing Index number, but instead, reference the Standard Plans, number Item Description Unit Measure 521-6-AB Concrete Parapet LF 521-8-11 Concrete Barrier /Noise

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-521-600.pdf?sfvrsn=8ffb6e7a_1

Florida Highway Data

and above. These data include administrative items (road number & name, functional classification, , number of lanes, type of shoulder, etc.), and operational items (traffic data, we supply an annual report based on Florida's part of the Highway Performance, transportation data. A new DVD is published in June each year. Interchange Report (PDF, 1.18 MB) - Interchange numbers and milepost locations for Interstates and most expressways. Maps - Variety of ready

https://www.fdot.gov/statistics/hwydata/default.shtm

SPI-521-600

(SDG); NCHRP Report 663, Design of Roadside Barrier Systems Placed on MSE Retaining Walls, report "Field Test of a "GBA" Safety Barrier Erected on a Reinforced Earth Wall", May, 1982, the traffic/pedestrian railing Index numbers. Commentary: Standard bridge traffic railings, when, a reference to the associated traffic railing Index number, but instead, reference the Standard Plans, : For consistency, Conduit and EJB’s are no longer included in the cost of the Traffic Railing. Item number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-521-600.pdf?sfvrsn=bafa3cd0_1

PCR Frequently Asked Questions2025

expenditures from the general project number to the associated project specific numbers. After, number and if they are the same, the entire project numbers must match. 8. To project Id not in current, /comptroller/pcr.htm) with any additional questions. 4. Can I use any Contract Number? No, the Contract Number should be a valid Contract Number provided by FDOT under which the work was performed. The contract number used must match the submitted Consultant Invoice Transmittal system (CITS) invoice. 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/comptroller/pcr-frequently-asked-questions2025.pdf?sfvrsn=dced7a4f_1

PNS

AirportInspection Reports Select a report... Inspection Report 03-14-2025 Inspection Report 03-08-2024 Inspection Report 03-31-2023 Inspection Report 03-24-2022 Inspection Report 03-30-2021 Inspection Report 09-29-2020 Inspection Report 03-08-2019 Inspection Report 03-22-2018 Inspection Report 03-24-2017 Inspection Report 04-19-2016 Inspection Record 04-17-2015 Inspection Record, 07-20-2012 Inspection Record 07-22-2011 Inspection Record 05-05-2010 Inspection Report 06-19-2009

https://www.fdot.gov/aviation/airportslist/pns

2024 EQ Report Examples

2024 EQ Report Examples, Estimated Quantities Report Examples 11/1/2023 2 | ( Back to top) Report Formatting: Each page of the Estimated Quantities Report will contain a Summary Table with pay item and quantity information, the date and time, and a page number. Estimated Quantities Report Examples 11/1/2023 3 | ( Back, and “continued” at the top of each page. The Summary Report Builder will add 3 blank rows to the end of each Summary Table when generating the EQ Report.- On occasion the blank rows will fall at a page

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2024-eq-report-examples.pdf?sfvrsn=c44995ab_1

RoadwayTemplate

FORECASTING REPORT (check workmix) 25 139 20-Aug-25 23-Sep-25 G.HYNES 153010 PERFORM PAVEMENT SURVEY, PH I STRUCTURE GEOTECH REPORT 45 50 20-Jan-26 23-Mar-26 G.CAMPOSAG 228010 RECEIVE SUNSHINE 811 DESIGN TICKET 1 54 27-Jan-26 27-Jan-26 132010 PREPARE PH I ROADWAY SOIL SURVEY / REPORT 25 80 10-Feb-26, A.WALKER 274010 PREPARE BRIDGE HYDRAULICS REPORT 25 10 14-Apr-26 18-May-26 109010 PREPARE POND SITING REPORT 40 20 14-Apr-26 08-Jun-26 297020 SCHEDULE PH I (30%) ESTIMATE REVIEW WORKSHOP 1 39 14-Apr-26

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d3/toolbox/roadwaytemplate.pdf?sfvrsn=90365de2_9

Requesting Public Crash Records & Data in Florida

for statewide crash data collection and dissemination. The numbers they report are the official numbers. Crash reports that reveal the personal information concerning the parties involved in the crash, 119.07(1), F.S. for a period of 60 days after the date the report is filed. (Section 316.066 (2)(a), F.S.) Crash Report Form: For a copy of your crash report form, contact FLHSMV, data from the crash report forms filed with the FLHSMV, and further processes the crash records

https://www.fdot.gov/Safety/safetyengineering/crash-data.shtm

9290100-722FHWA

a copy of the final inspection report and proficiency sample results to the State Materials Office, Production Facility Listing will be maintained by the SMO. 3. Test Report: A certification from the SCM producer showing that the SCM meets the requirements of this Section. The test report must include, and physical analysis of the SCM. d. The silo numbers where the SCM is stored. e. The specific, of inspection. The laboratory must authorize the CCRL to send a copy of the final inspection report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/9290100-722fhwa.pdf?sfvrsn=90fcacb2_2

1050101.FHWA

numbers, email address, primary contact at the plant, responsible person in charge, facility number provided by the Department, owner information including parent company, vendor number, designed, of materials. Report test results at completion of the test and meet the requirements, the Training Identification Numbers (TINs) or any other information which will be traceable, and plant or mine numbers when applicable. 105-4.6.2.2 Certification: Describe Submit methods of verifying

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/1050101.fhwa.pdf?sfvrsn=2443231a_0

0010300-122FHWA

Office of Design to add the definition of Estimated Quantities Report (EQR) and provide clarification, as “Notice to Contractors,” or “Notice to Bidders.” Article. The numbered prime subdivision, Quantities Report, Standard Plans, Addenda, or other information mailed or otherwise transmitted, . The date that the Department opened the bid proposals. Contract Time. The number of calendar days, Estimated Quantities Report. The Estimated Quantities Report contains pay item and quantity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/0010300-122fhwa.pdf?sfvrsn=d8b0da41_2

2024-2025_CTCAORReportingInstructions

Source - One Way This portion of the report further identifies the number of trips purchased by each,  Page 1 of 23 Revised 04/01/2025 INSTRUCTIONS FOR COMPLETION OF THE ANNUAL OPERAT I NG REPORT, Coordinator (CTC) must submit an Annual Operating Report (AOR). The Commission for the Transportation, . This report is due to the CTD by September 15 th of each year. CTCs must submit electronic extension, in this report to substantiate the need to seek additional funds. All information submitted is subject

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/aoraprdocs/2024-2025_ctcaorreportinginstructions.pdf?sfvrsn=eaa8e688_1
20 of 3761 results