3255 search results for intersection

Draft Tentative Work Program FY2025-FY2029

: INTERSECTION IMPROVEMENT Phase Fund Code 2025 2026 2027 2028 2029 Right of Way SU $286,693, FROM 3RD AVE TO SR 84 INTERSECTION/MOBILITY IMPROVEMENTS PD&E Type of Work: PD&E/EMO STUDY Phase, COUNTY Highways 444321-2 - SR 45 (US 41) AT BONITA BEACH ROAD Type of Work: INTERSECTION, 448699-1 $404,000 $1,287,805 448706-1 - MCGREGOR BLVD AT IONA DR INTERSECTION Type of Work: ADD

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d1_documents/draft-tentative-work-program-fy2025-fy2029.pdf?sfvrsn=524ea7f9_1

44592625201-PLANS-02-SIGNINGMARKING

NO. SR 789 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION INTERSECTION TO WEST OF SUNSET DR. / GOLDEN GATE POINT INTERSECTION WIDENING AND RECONSTRUCTION OF SR 789 EAST OF BIRD KEY DR. https

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25117/44592625201-plans-02-signingmarking.pdf?sfvrsn=33a22502_1

TP-05-10-24BSN

16,396.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 6,772.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 6,772.000 0102-115- TYPE III

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/may10/tp-05-10-24bsn.pdf?sfvrsn=62c684c9_1

45403215201-ESTIMATES-QUANTITIES

Remarks 0611 2 1 ITSFM Location Documentation - Intersection EA 1 1 SR 684 00+00.00 00+00.00 LT/RT, Or Reconstructed Intersection, Furnish & Install PI 1 1 SR684 126+13.05 126+13.05 LT 3237 0632 7 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/45403215201-estimates-quantities.pdf?sfvrsn=3c789c8e_1

TP-11-08-24BSN

- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-115- TYPE III BARRICADE ED 9,097.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/nov08/tp-11-08-24bsn.pdf?sfvrsn=82bfd70f_1

TP-12-19-24BSN

SIGN, TEMPORARY ED 11,649.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/dec19/tp-12-19-24bsn.pdf?sfvrsn=ab934fcf_1

TP-01-17-25BSN

11,649.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-115- TYPE III BARRICADE ED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jan17/tp-01-17-25bsn.pdf?sfvrsn=944cdf11_1

safety

emphasis areas were selected for the 2012 SHSP – aggressive driving, intersection crashes, vulnerable, of the department around eight major emphasis areas: aggressive driving, intersection crashes, vulnerable road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/trends/tc-report/safety_66cd7271-f040-440c-b470-3d3a8b707e14.pdf?sfvrsn=4e999925_0

44653515201-PLANS-01-ROADWAY

= POINT OF TANGENCY = POINT ON TANGENT = POINT OF INTERSECTION = POINT COMPOUND CURVE = POINT, OF INTERSECTION = POINT COMPOUND CURVE = POINT OF CURVATURE = POINT = PROFESSIONAL ASSOCIATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/44653515201-plans-01-roadway.pdf?sfvrsn=10d18004_1

D6-03-27-2025BSN

POLE EA 1.000 0641- 2- 15 PRESTRESSED CONCRETE POLE, F&I, TYPE P-V EA 1.000 0670- 4- 1 INTERSECTION, 0641- 2- 15 PRESTRESSED CONCRETE POLE, F&I, TYPE P-V EA 1.000 0670- 4- 1 INTERSECTION CONTROL BEACON

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/mar27/d6-03-27-2025bsn.pdf?sfvrsn=74f3386a_1

D5-08-05-25BSN

0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 750.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 750.000 0104- 18- INLET PROTECTION SYSTEM EA 79.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/aug05/d5-08-05-25bsn.pdf?sfvrsn=e2b36d43_1

PublicHearing_ORANGE COUNTY_Summary_2027_2031

444980-2 $18,007,581 445696-1 - SR 438 INTERSECTION IMPROVEMENTS AT KINGSLAND AVE Type of Work: SAFETY, ) AT JETPORT DR Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_orange-county_summary_2027_2031.pdf?sfvrsn=2874c3ea_1

TP-02-19-26BSN

SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 287.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 287.000 0102-115- TYPE III BARRICADE ED 64.000 0102-150- 1 PORTABLE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/feb19/tp-02-19-26bsn.pdf?sfvrsn=16af223c_1

446296_I-75_DDI_Drainage_Report_PHIIR_JUL2024

that represent the four quadrants of the intersection: Basin 1, Basin 2, Basin 3, and Basin 4. All four, from the in-field areas of the intersection. The southern two quadrants (Basin 1 and 2) of the intersection outfall to the south; and the northern two quadrants (Basin 3 and 4) outfall to the north, ponds to the northeast of the I-75 and Daniel’s Parkway intersection outfall to the I-75 northeast, quadrant of the intersection. This basin includes the area that directly outfalls to the in-field

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25118/446296_i-75_ddi_drainage_report_phiir_jul2024.pdf?sfvrsn=9a06db12_1

FDOT_FLFAC_Sept5

• Flyovers at major intersections • Full-service truck shops • Incentives for a switch to alternative

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/multimodal/flfac/fdot_flfac_sept5.pdf?sfvrsn=46281def_3
20 of 3255 results
Top