5764 search results for Standard Specifications

1050101.origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, o posed revision involve Design Standard Index changes? Yes No Roadway Design staff contacted (name, , P.E., State Specifications Engineer SUBJECT: Proposed S p e cification: 1050101 Contractor, of the applicable Specifications. ARTICLE 105-2 is deleted and the following 105-2 Additional Requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/1050101.origind.pdf?sfvrsn=e68d8869_0

19-09-Johnson-Stormwater

•WATERSS Success Stories •Developmental Standard Plans •Standard RAI Responses 4 • ERP Program •Covers, •FDOT Specifications and O&M Program centered around NPDES Program Regulatory Awareness 2021, ) Temporary Erosion and Sediment Control 6 •Comprehensive approach via standard form •Applicable, Efficiency •Retention Efficiency x Soil Media’s Nutrient Sequestration •Standard Plans 440-001, •Standard roadway front slope •Retention BMP •Detention with Filtration BMP (underdrain) 19 20

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-09-johnson-stormwater.pdf?sfvrsn=9f867509_1

7130000.origind

need to be changed? Tapes were originally classified as standard and high performance based on their retroreflectivity and service life. The standard classification was dropped in 2012, leaving only, , what is the estimated change in costs? With who have you discussed these changes? Specifications, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130, Scheer, P.E., State Specifications Engineer SUBJECT: Proposed Specification: 7130000 Permanent Tape

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/7130000.origind.pdf?sfvrsn=f6504650_0

7150300-122impl

shop drawings and working drawings with descriptive specifications and engineering data, panel, transformer, in-line fuse holders, surge protective devices, non-standard light poles, with the Standard Plans. 715-8.3 Placing Backfill for Cable: For installation of the cable, place, in accordance with the Standard Plans. Obtain precast foundations from a plant that is currently, in the Standard Plans or authorized by the Engineer, splices shall be made with split bolt connectors

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/7150300-122impl.pdf?sfvrsn=774bf69e_2

1200503-724origind

Publications: Publication Yes No Office Staff Contacted Standard Plans Index Traffic Engineering Manual, of the following types of specifications (Hover over type to go to site.): Special Provisions Developmental Specifications List Specifications Affected: (ex. SP3270301, Dev330TL, Dev334TL etc, publications in this Section been verified for accuracy? Contact the State Specifications Office, ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/1200503-724origind.pdf?sfvrsn=30cb7f12_1

6330201-724origind

) Revisions: Telephone: Email: Publication Yes No Office Staff Contacted Standard Plans Index, types of specifications (Hover over type to go to site.): Special Provisions Developmental Specifications List Specifications Affected: (ex. SP3270301, Dev330TL, Dev334TL etc.) Maintenance Specs, publications in this Section been verified for accuracy? Contact the State Specifications Office, MaryElizabeth.Parker@dot.state.fl.us 1 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/6330201-724origind.pdf?sfvrsn=7c523a3c_1

fdot-bee76-977-01-rpt

, material characterization, and structural analysis to develop design specifications for #11 GFRP, FRP bars. The AASHTO LRFD Bridge Design Guide Specifications for GFRP-Reinforced Concrete [1] allow, footings, developing material acceptance and design specifications for #11 glass FRP bars, costs and extending service life. It will result in material acceptance criteria, design specifications, 2.4. Design Guides and Material Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bee76-977-01-rpt.pdf?sfvrsn=f1d2d0e4_3

E3XX1NonTechSpecs

. . ................................................................................................... 15 A-28 FDOT Standard Specifications for Road and Bridge, standard Specifications for Road and Bridge Construction. LAWS and REGULATIONS: Any and all applicable, Standard Specifications for Road and Bridge Construction and are included in the contract documents, Specifications (Revised 10-12-2023) Page 1 of 59 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ON BEHALF, * * * * * * * * * * * * * * * * NON-TECHNICAL SPECIFICATIONS - FOR - CONSTRUCTION CONTRACTS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3xx1/e3xx1nontechspecs.pdf?sfvrsn=e8260fda_1

SPI-460-470

 Standard Plans Instructions Topic No. 625-010-003 Index 460-470 Series Traffic Railing - (Thrie, Criteria NCHRP Report 350, Test Level 4; AASHTO LRFD Bridge Design Specifications, 6th Edition, is the lead standard for the Traffic Railing (Thrie-Beam Retrofit) standard series which includes Indexes 460-470 through 460-476. Use this standard with Indexes 536-002, 460-471, 460-472, 460-473, with parallel, perpendicular, angled or flared end bent wing walls. Each Standard includes several schemes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-460-470.pdf?sfvrsn=fb47049e_1

SPI-460-470

 Standard Plans Instructions Topic No. 625-010-003 Index 460-470 Series Traffic Railing - (Thrie, Criteria NCHRP Report 350, Test Level 4; AASHTO LRFD Bridge Design Specifications, 6th Edition, is the lead standard for the Traffic Railing (Thrie-Beam Retrofit) standard series which includes Indexes 460-470 through 460-476. Use this standard with Indexes 536-002, 460-471, 460-472, 460-473, with parallel, perpendicular, angled or flared end bent wing walls. Each Standard includes several schemes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-460-470.pdf?sfvrsn=f2b066bf_1

SPI-460-470

 Standard Plans Instructions Topic No. 625-010-003 Index 460-470 Series Traffic Railing - (Thrie, Criteria NCHRP Report 350, Test Level 4; AASHTO LRFD Bridge Design Specifications, 6th Edition, is the lead standard for the Traffic Railing (Thrie-Beam Retrofit) standard series which includes Indexes 460-470 through 460-476. Use this standard with Indexes 536-002, 460-471, 460-472, 460-473, with parallel, perpendicular, angled or flared end bent wing walls. Each Standard includes several schemes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-460-470.pdf?sfvrsn=445ea6e0_1

9620100int

 Origination Form Specifications Name: Adrian Steele Standard Specification Section: 962 Email, , Internal and Industry Review) What is the schedule for implementation? The Standard Specifications eBook, the changes affect other types of specifications? Neither List Specifications Affected: Other Affected Documents/Offices Contacted Yes/No Other Standard Plans No Florida Design Manual No Structures, hyperlink located on the Specifications landing page: https://www.fdot.gov/programmanagement/Specs.shtm

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/9620100int.pdf?sfvrsn=9eaaa6f4_1

9620100ind

 Origination Form Specifications Name: Adrian Steele Standard Specification Section: 962 Email, , Internal and Industry Review) What is the schedule for implementation? The Standard Specifications eBook, the changes affect other types of specifications? Neither List Specifications Affected: Other Affected Documents/Offices Contacted Yes/No Other Standard Plans No Florida Design Manual No Structures, hyperlink located on the Specifications landing page: https://www.fdot.gov/programmanagement/Specs.shtm

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/9620100ind.pdf?sfvrsn=fad2d90e_1

SPM7150100-721

as follows: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm7150100-721.pdf?sfvrsn=7ab6a5b6_4

SP7150100

outlined for submittal of shop drawings in the Standard Specifications is waived to expedite, will comply with Section 100 of the Standard Specifications unless otherwise amended by these specifications, Standard Specifications for Road and Bridge Construction and is consistent with the existing lighting, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications, to mean

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp7150100.docx?sfvrsn=e1f7b9ab_2

SP7150100-i16467

as follows: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp7150100-i16467.pdf?sfvrsn=1cb17a68_3

SP7150100

as follows: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/maintenance/sp7150100.pdf?sfvrsn=ef65deb1_3

SP7150100

: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/sp71501003178e724226a4e54a84570e69731bc99.pdf?sfvrsn=d5ae272d_3

SP7150100

: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing lighting, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/maintenance/finalized/sp7150100ebbfd8c6-1198-4a30-8f85-a5bd6c19be15.pdf?sfvrsn=3ab39691_2

SP7150100

: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/maintenance/finalized/sp7150100.pdf?sfvrsn=c43711ef_1
20 of 5764 results