13206 search results for DESIGN

Staff-Directors-Final-Packet-01-27-22-final

Area (TMA) designation in Fall 2022 and states revisit the statewide PL distribution formula before, , after October 1, 2022, or within 4 years of new urban area boundary designation • If identified, new MPOs designated by Governor in Spring/Summer 2023. • New TMAs must adopt a congestion management, is not anticipated that new MPOs will be designated. • FUTURE MEETING LOCATION AND HYBRID MEETING, to be designated and fund a pilot for the smart ecosystem concept through a smart coalitions partnership. 17

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/staff-directors-final-packet-01-27-22-final.pdf?sfvrsn=5a393a38_1

4501403int

Design Manual No Structures Manual No Basis of Estimates Manual No Approved Product List, Manager or designee. In the case of elements repaired due to major defects, notify the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/4501403int.pdf?sfvrsn=f522b58_1

4501403ind

Design Manual No Structures Manual No Basis of Estimates Manual No Approved Product List, Manager or designee. In the case of elements repaired due to major defects, notify the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/4501403ind.pdf?sfvrsn=7bb1fb2a_1

3340000.FHWA

mix design criteria to the Engineer. For Traffic Level B through E mix designs, include, or reject the mix as designed. Do not use more than three mix designs per nominal maximum aggregate, on the design traffic level of the project, expressed in 18,000 pound Equivalent Single Axle Loads (ESAL’s, the aggregate fractions to meet the grading and physical properties of the mix design. Aggregates from various sources may be combined. 334-3.2 Mix Design: 334-3.2.1 General: Design the asphalt mixture

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/3340000.fhwa.pdf?sfvrsn=a1af6039_0

F6012ScopeOfWorkNonTechSpecs

or designee. Proposed Contractor work schedules (and any subsequent proposed schedule change requests, or designee. 3.3.2. While it is expected that the majority of this work will occur during regular day hours, Six 3.7. Department Project Manager: The Department's authorized representative (or designee, to the attention of the Department Project Manager, or designee when necessary. 3.15.3. For maintaining, Designated as “Re-Use Existing UTP Camera Cables” as shown on CCTV System Drawing CCTV-3. 5.1.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/fco/f6012/f6012scopeofworknontechspecs.pdf?sfvrsn=87cbfc71_1

6460000-722FHWA

Supplemental Specification. This change was proposed by Rick Jenkins from the Roadway Design Office, diameter must be in accordance with the base manufacturer recommendations. The base design must, Documents call for painted aluminum poles, pedestals, and posts, the Contractor shall designate a responsible party to accept responsibility. The responsible party designated by the Contractor must, year warranty period. Failure to timely designate the responsible party will result

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/6460000-722fhwa.pdf?sfvrsn=792b5e8e_2

5-SIS-and-SunTrailOCT2017

criteria in the near future >> Differentiate Strategic Growth from designated SIS through funding, to meet SIS minimum size criteria and thresholds within three years of designation Determined, >> Support improved first- and last-mile connectivity >> Consider sunsetting designation of standalone, and Environment Study (PD&E)  Preliminary Engineering/Design (PE)  Acquisition of Right-of-Way

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/5-sis-and-suntrailoct2017.pdf?sfvrsn=d5f8d3b_1

SPM0050107-724-i19168

is available at or reasonably near the worksite on a 24-hour basis, seven days a week. Designate, the phone numbers and names of personnel designated to be contacted in cases of emergencies. SUBARTICLE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0050107-724-i19168.pdf?sfvrsn=ae0dbd15_1

SPM0050107-725-i19848

is available at or reasonably near the worksite on a 24-hour basis, seven days a week. Designate, the phone numbers and names of personnel designated to be contacted in cases of emergencies. SUBARTICLE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0050107-725-i19848.pdf?sfvrsn=117b7ec5_1

SPM0050107-723-i18545

. Designate this person as the point of contact for emergencies and in cases that require immediate action, , provide the phone numbers and names of personnel designated to be contacted in cases of emergencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0050107-723-i18545.pdf?sfvrsn=a20c75d3_2

SPM0050107-122

is available at or reasonably near the worksite on a 24-hour basis, seven days a week. Designate, the phone numbers and names of personnel designated to be contacted in cases of emergencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm0050107-122.pdf?sfvrsn=b03327c2_2

SPM0050107-722-i17918

is available at or reasonably near the worksite on a 24-hour basis, seven days a week. Designate, the phone numbers and names of personnel designated to be contacted in cases of emergencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm0050107-722-i17918.pdf?sfvrsn=6e300a5c_2

SPM0050107-721

, and who is available at or reasonably near the worksite on a 24-hour basis, seven days a week. Designate, , provide the phone numbers and names of personnel designated to be contacted in cases of emergencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm0050107-721.pdf?sfvrsn=a0e8ba82_4

SP0050107impl

on a 24- hour basis, seven days a week. Designate this person as the point of contact for emergencies, that might arise. At the pre-work conference, provide the phone numbers and names of personnel designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/implemented/sp0050107impl.pdf?sfvrsn=8e61172f_2

SP0050107.D02clean

is available at or reasonably near the worksite on a 24 hour basis, seven days a week. Designate this person, numbers and names of personnel designated to be contacted in cases of emergencies. SUBARTICLE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/implemented/sp0050107.d02clean.pdf?sfvrsn=8a5db3ff_0

SP0050101

at or reasonably near the worksite on a 24 hour basis, seven days a week. Designate this person, and names of personnel designated to be contacted in cases of emergencies. SUBARTICLE 5-10.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/implemented/sp0050101.pdf?sfvrsn=74b1d57e_1

9430000.impl

be done at the manufacturing plant and witnessed by the Engineer or designated representative. 943-2, 3.Nomarkings will be required on the outside of the pipe to designate the center line of the top

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/9430000.impl.pdf?sfvrsn=db027698_0

9430000.impl

at the manufacturing plant and witnessed by the Engineer or designated representative. 943-2 Round, on the outside of the pipe to designate the center line of the top of the pipe. (d) Lifting lugs shall

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/9430000.impl.pdf?sfvrsn=b551f68_0

SP0050107-i16305

on a 24-hour basis, seven days a week. Designate this person as the point of contact for emergencies, that might arise. At the pre-work conference, provide the phone numbers and names of personnel designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp0050107-i16305.pdf?sfvrsn=85456fce_3

SP0050107

near the worksite on a 24-hour basis, seven days a week. Designate this person as the point, of personnel designated to be contacted in cases of emergencies. SUBARTICLE 5-10.2 is expanded

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/sp0050107.pdf?sfvrsn=61f716fb_3
20 of 13206 results