7241 search results for Pavement

Jan 2022 to FY 2025-2026 - Roadway Cheat Sheet

Roadway Cheat Sheet – Jan 2022 through FY 2025-26 Specifications The following are some common Asphalt Pavement/Roadway Inspection Specifications. Always double check your project’s contract documents for correct & complete contract requirements. QC VT Tack Spread Rate * 2/day 1/day QC VT Mix Spread Rate * 1/200 tons 1/day/lift *Use min. 5 trucks, max. 10 trucks to determine spread rate QC VT Mix Temperature * First 5 trucks, then 1 per 5 trucks** 2/day

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/asphalt/pdffiles/jan-2022-to-fy-2025-2026---roadway-cheat-sheet.docx?sfvrsn=d307969b_1

711-001-IndustryReviewResponse2

 Industry Review Comments and Responses FDOT – Standard Plans 1 Index 711-001 Pavement Markings ORIGINATION Date: 9/17/24 Name: Shae Gibbs Phone: 414-4314 Email: shae.gibbs@dot.state.fl.us, : Joseph Moslemian Date: 9/19/2024 COMMENT: For the managed lane pavement marking diagram, " Gap 13 4 711-001 PAVEMENT MARKINGS 11/01/24 Shoulder Gutter Or Median Shoulder Gutter Or Unpaved PLACEMENT OF LONGITUDINAL PAVEMENT MARKINGS D R A F T

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/711-001-industryreviewresponse2.pdf?sfvrsn=bf3de34e_1

Statewide DRB Members

Pavement Structures Scott Cushing Michael Bienvenu Antonio Garcia Jon Chellgren Richard Lehman Frank

https://www.fdot.gov/construction/constadm/drb/statewidedrb.shtm

SPI-700-102

SHS . Refer to FDM 230 for criteria on signing and pavement marking. Plan Content Requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-700-102.pdf?sfvrsn=d1aed7a3_1

SummaryOfChanges2025FPDM

 2025 FDOT Flexible Pavement Design Manual Summary of the Revisions: • Chapter 4 o updated majority of chapter per Roadway Design Bulletin 24-03, Friction Course Policy o Section 4.4, final bullet added a reference to the GTR for additional details on where to omit FC-5 near toll facilities; this was for clarification purposes only • Chapter 5 o Table 5.4 & Table 5.6 added a new Optional Base Material (Calcarenite); this was also added to the Standard Specifications o Section

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/pm/publications/summaryofchanges2025fpdm.pdf?sfvrsn=afea635e_1

E59C2Addenda001

 Florida Department of Transportation RON DESANTIS GOVERNOR 719 South Woodland Boulevard DeLand, FL 32720-6834 JARED W. PERDUE, P.E. SECRETARY Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov January 3, 2025 ADDENDUM NO. 1 To: PROSPECTIVE BIDDERS AND PLAN HOLDERS FINANCIAL PROJECT NUMBER: 444100-1-72-17 CONTRACT NUMBER: E59C2 COUNTY(IES): Lake DESCRIPTION: Pavement Markings LETTING DATE CHANGE The letting date for this proposal has been moved to February 4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/feb4/e59c2addenda001.pdf?sfvrsn=69ce3525_1

E3X72

1.000 Section 0003 Signing 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 78.000 0711- 14-160, 2.000 0918-712-100 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, WHITE, SOLID 6" GM 1.167 0918-712-110 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, YELLOW, SOLID 6" GM 0.584 0918-712-120 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, WHITE, 10-30 SKIP 6" GM 0.584 Page 7 Bid Solicitation Notice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/feb13/e3x72.pdf?sfvrsn=d42504c3_1

E21J3

pavement markers (RPM's), Maintenance of Traffic (MOT), and Mobilization on various roadways in Madison

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/feb19/e21j3.pdf?sfvrsn=63b97dfd_1

E59C2Addenda002

 Florida Department of Transportation RON DESANTIS GOVERNOR 719 South Woodland Boulevard DeLand, FL 32720-6834 JARED W. PERDUE, P.E. SECRETARY Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov January 21, 2025 ADDENDUM NO. 2 To: PROSPECTIVE BIDDERS AND PLAN HOLDERS FINANCIAL PROJECT NUMBER: 444100-1-72-17 CONTRACT NUMBER: E59C2 COUNTY(IES): Lake DESCRIPTION: Pavement Markings SPECIFICATIONS PACKAGE REVISION Pages 36, 37, and 248 of the Specifications Package

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/feb4/e59c2addenda002.pdf?sfvrsn=217fc866_1

E59C2Addenda003

 Florida Department of Transportation RON DESANTIS GOVERNOR 719 South Woodland Boulevard DeLand, FL 32720-6834 JARED W. PERDUE, P.E. SECRETARY Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov January 27, 2025 ADDENDUM NO. 3 To: PROSPECTIVE BIDDERS AND PLAN HOLDERS FINANCIAL PROJECT NUMBER: 444100-1-72-17 CONTRACT NUMBER: E59C2 COUNTY(IES): Lake DESCRIPTION: Pavement Markings PAY ITEM REVISION The quantity for Pay Item 711-17-1 has been revised. AMENDMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/feb4/e59c2addenda003.pdf?sfvrsn=eff9e332_1

E21J3Addenda001

roadways, replacement of all thermoplastic striping, reflective pavement markers (RPM's), Maintenance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/feb19/e21j3-r0addenda001.pdf?sfvrsn=63868126_3

E4X81-R0

-reflective pavement markers on State roadways in Martin, St. Lucie, and Indian River Counties, Quantities Call Order: 003 Proposal: E4X81-R0 ALT Item Description Unit Quantity Section 0001 PAVEMENT, THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN SF 3,000.000 0713-103-101 PERMANENT TAPE, WHITE, GM 2.000 0713-107- PREFORMED/PERMANENT TAPE, REMOVE SF 100.000 E706- 1- 42 REFLECTIVE PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/mar07/e4x81-r0.pdf?sfvrsn=93e39ecc_1

E1X88-R0

REWORKING UTILITY STRIPS SY 4,000.000 E577- 71- BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/apr17/e1x88-r0.pdf?sfvrsn=699ac13c_1

E1X87-R0

- BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT LF 3,000.000 Page 8 Bid Solicitation Notice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/apr17/e1x87-r0.pdf?sfvrsn=79752151_1

SPM9711100HS-122

and yellow pavement markings shall attain an initial retroreflectance of not less than 300 mcd/lx, pavement markings at the end of the one year service life shall not be less than 150 mcd/lx·m2, from the pavement. The thermoplastic material line loss must not exceed 5.0% at the end of the one, of moisture shall be visible on the pavement surface as determined in accordance with the binder

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm9711100hs-122.pdf?sfvrsn=a99408a1_2

SPM9711100HS-721

and yellow pavement markings shall attain an initial retroreflectance of not less than 300 mcd/lx, pavement markings at the end of the one year service life shall not be less than 150 mcd/lx·m2, from the pavement. The thermoplastic material line loss must not exceed 5.0% at the end of the one, of moisture shall be visible on the pavement surface as determined in accordance with the binder

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm9711100hs-721.pdf?sfvrsn=e6ddbe41_2

SP9711100HS

two minutes. 971-11.4.2 Retroreflectivity: The white and yellow pavement markings shall attain, , respectively. The retroreflectance of the white and yellow pavement markings at the end of the one year, percent of thermoplastic material completely removed from the pavement. The thermoplastic material, at a minimum thickness as identified in the plans. No signs of moisture shall be visible on the pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp9711100hs.docx?sfvrsn=7cf70ae4_2

SP9711100HSredline

pavement markings shall attain an initial retroreflectance of not less than 300 mcd/lx·m2 and not less than 250 mcd/lx·m2, respectively. The retroreflectance of the white and yellow pavement markings, the pavement. The thermoplastic material line loss must not exceed 5.0% at the end of the one year service, shall be visible on the pavement surface as determined in accordance with the binder manufacturer’s

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/review-package/sp9711100hsredline.pdf?sfvrsn=4733e6ec_0

sp9711100hsredline

. 971-1011.4.2 Retroreflectivity: The white and yellow pavement markings shall attain an initial, . The retroreflectance of the white and yellow pavement markings at the end of the one year service life, of thermoplastic material completely removed from the pavement. The thermoplastic material line loss, thickness as identified in the plans. No signs of moisture shall be visible on the pavement surface

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/maintenance/review-package/sp9711100hsredline.pdf?sfvrsn=4b45a3ae_1
20 of 7241 results