3165 search results for intersection

RSigningPavementMarkingsand Lighting

and find the intersection point. See Sheet 3. largest area should be analyzed to determine, and - In the Column (Post) and Foundation Table, the value intersection value is "4" (4" OD). column labeled "11 FT". For the example the intersection of the row labeled "16 SF" and the - To determine

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/ser/rsigningpavementmarkingsand-lighting.pdf?sfvrsn=38f6b6fb_5

RSigningPavementMarkingsand Lighting

and find the intersection point. See Sheet 3. largest area should be analyzed to determine the Column, and - In the Column (Post) and Foundation Table, the value intersection value is "4" (4" OD). column labeled "11 FT". For the example the intersection of the row labeled "16 SF" and the - To determine

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/ser/rsigningpavementmarkingsand-lighting.pdf?sfvrsn=e098d5_6

43020425201-PLANS-01-ROADWAY (1)

SIDEWALK PROFILES 71 INTERSECTION DETAIL 72-95 DRAINAGE STRUCTURES 96-97 DRAINAGE DETAILS, , THESE CONTRACT PLANS MATCH THE FORMAT DESCRIBED IN USED IN AN EMERGENCY WHERE THE INTERSECTION OF GULF, AND MAINTENANCE, INTERSECTION ED 1095.000 1095.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 1095.000 1095.000 0102-115- TYPE III BARRICADE ED 12558.000 12558.000 0104- 10- 3, . pavement & pavement widening east of the Hunters Point Way intersection to provide adequate sight

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26122/43020425201-plans-01-roadway-(1).pdf?sfvrsn=7fc3e525_1

44787815201-ESTIMATES-QUANTITIES

Signalization and Maintenance, Intersection ED E 4 200 800 800 ALL Midblock crossing, Main St, Bridge St, and N Lee St. 0102 107 1 Temporary Traffic Detection and Maintenance, Intersection ED E 4 200 800 870, 1120+01.80 1120+04.83 RT 8648 0632 7 1 Signal Cable, New Or Reconstructed Intersection, Furnish

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-estimates-quantities06a0e214-0d36-4699-8b5e-14214bf3ead1.pdf?sfvrsn=f2a479bb_1

mappingguidelines

: a. At begin and end survey flags. b. At non-curve tangent intersection. c. All Section, Quarter, AT THE POINT OF INTERSECTION WITH THE BASELINE OF SURVEY, UNLESS OTHERWISE NOTED. 6. ATTENTION IS DIRECTED, (P) = PLAT P.B. = PLAT BOOK P.C. = POINT OF CURVATURE P.I. = POINT OF INTERSECTION PK = PARKER

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/districts/d4/mappingguidelines.pdf?sfvrsn=5fb3b6e9_1

436676-1 Draft UAP_ Longboat Key PD

’ north of the N. Shore Rd. and SR 789 intersection. 2. Comcast has underground facilities, of the Firehouse Court and SR 789 intersection that runs west crossing SR 789 to Firehouse Court. 2, the west side of SR 789 to east side at the N. Shore Rd. intersection that then continues north

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26113/436676-1-draft-uap_-longboat-key-pd.pdf?sfvrsn=cba4f715_1

RSigningPavementMarkingsandLighting

Tables and find the intersection point. See Sheet 3. largest area should be analyzed to determine, and - In the Column (Post) and Foundation Table, the value intersection value is "4" (4" OD). column labeled "11 FT". For the example the intersection of the row labeled "16 SF" and the - To determine

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/ser/rsigningpavementmarkingsandlighting.pdf?sfvrsn=af0777da_1

StandardPlansFY2022-23eBooke

Mail Manual ----------------- I ----------------- Approx. Approximate DPI Ditch Point Intersection ID, for Manholes and Inlets 102-604Two-Lane, Two-Way, Intersection Work 425-010Structure Bottoms - Type J and P, Closures 425-023Curb Inlet - Type 8 102-615Multilane Roadway, Intersection Work 425-024Curb Inlet Top, Distance at Intersections [*Content moved to the FDM] 471 460-471 Traffic Railing - (Thrie-Beam, 102-604 Two-Lane, Two-Way, Work in Intersection Renamed: Two-Lane, Two-Way, Intersection Work 481

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2023/standardplansfy2022-23ebooke.pdf?sfvrsn=7c04dff0_3

Draft Tentative Work Program FY2025-FY2029

: INTERSECTION IMPROVEMENT Phase Fund Code 2025 2026 2027 2028 2029 Right of Way SU $286,693, FROM 3RD AVE TO SR 84 INTERSECTION/MOBILITY IMPROVEMENTS PD&E Type of Work: PD&E/EMO STUDY Phase, COUNTY Highways 444321-2 - SR 45 (US 41) AT BONITA BEACH ROAD Type of Work: INTERSECTION, 448699-1 $404,000 $1,287,805 448706-1 - MCGREGOR BLVD AT IONA DR INTERSECTION Type of Work: ADD

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d1_documents/draft-tentative-work-program-fy2025-fy2029.pdf?sfvrsn=524ea7f9_1

44592625201-PLANS-02-SIGNINGMARKING

NO. SR 789 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION INTERSECTION TO WEST OF SUNSET DR. / GOLDEN GATE POINT INTERSECTION WIDENING AND RECONSTRUCTION OF SR 789 EAST OF BIRD KEY DR. https

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25117/44592625201-plans-02-signingmarking.pdf?sfvrsn=33a22502_1

TP-05-10-24BSN

16,396.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 6,772.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 6,772.000 0102-115- TYPE III

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/may10/tp-05-10-24bsn.pdf?sfvrsn=62c684c9_1

45403215201-ESTIMATES-QUANTITIES

Remarks 0611 2 1 ITSFM Location Documentation - Intersection EA 1 1 SR 684 00+00.00 00+00.00 LT/RT, Or Reconstructed Intersection, Furnish & Install PI 1 1 SR684 126+13.05 126+13.05 LT 3237 0632 7 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/45403215201-estimates-quantities.pdf?sfvrsn=3c789c8e_1

TP-11-08-24BSN

- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-115- TYPE III BARRICADE ED 9,097.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/nov08/tp-11-08-24bsn.pdf?sfvrsn=82bfd70f_1

TP-12-19-24BSN

SIGN, TEMPORARY ED 11,649.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/dec19/tp-12-19-24bsn.pdf?sfvrsn=ab934fcf_1

TP-01-17-25BSN

11,649.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 4,044.000 0102-115- TYPE III BARRICADE ED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jan17/tp-01-17-25bsn.pdf?sfvrsn=944cdf11_1

safety

emphasis areas were selected for the 2012 SHSP – aggressive driving, intersection crashes, vulnerable, of the department around eight major emphasis areas: aggressive driving, intersection crashes, vulnerable road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/trends/tc-report/safety_66cd7271-f040-440c-b470-3d3a8b707e14.pdf?sfvrsn=4e999925_0

44653515201-PLANS-01-ROADWAY

= POINT OF TANGENCY = POINT ON TANGENT = POINT OF INTERSECTION = POINT COMPOUND CURVE = POINT, OF INTERSECTION = POINT COMPOUND CURVE = POINT OF CURVATURE = POINT = PROFESSIONAL ASSOCIATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/44653515201-plans-01-roadway.pdf?sfvrsn=10d18004_1

D6-03-27-2025BSN

POLE EA 1.000 0641- 2- 15 PRESTRESSED CONCRETE POLE, F&I, TYPE P-V EA 1.000 0670- 4- 1 INTERSECTION, 0641- 2- 15 PRESTRESSED CONCRETE POLE, F&I, TYPE P-V EA 1.000 0670- 4- 1 INTERSECTION CONTROL BEACON

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/mar27/d6-03-27-2025bsn.pdf?sfvrsn=74f3386a_1

D5-08-05-25BSN

0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 750.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 750.000 0104- 18- INLET PROTECTION SYSTEM EA 79.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/aug05/d5-08-05-25bsn.pdf?sfvrsn=e2b36d43_1
20 of 3165 results