3165 search results for intersection
D4 Public Hearing Report 2025 - Broward
for Project 444404-1 $1,454,763 444977-2 - SR-820/ PINES BLVD AT 196TH AVE Type of Work: INTERSECTION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2025---broward.pdf?sfvrsn=79e63609_3Chapter9
of the roadway footprint at intersections and interchanges may be uncertain still simply because the geometry
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagedesignguide/chapter9.pdf?sfvrsn=c244a11_74500000.origind
reinforcement covers an area of four intersections of transverse and longitudinal bars. Ensure, , other than stirrup bars in beam ends, ast a minimum, atof every other intersection. Either tie
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/4500000.origind.pdf?sfvrsn=919064ed_04500000.impl
of welded wire reinforcement covers an area of four intersections of transverse and longitudinal, in beam ends, at a minimum of every other intersection. Either tie or lace spirals in piling at all
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/implemented/4500000.impl.pdf?sfvrsn=652c13ac_0SS4500000
of 4 intersections of transverse and longitudinal bars. Ensure the transverse wires of each piece, bars in beam ends, as a minimum, at every other intersection. Either tie or lace spiral wire
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4500000d6887b086ab44d6d9f958a35d885e6da.pdf?sfvrsn=43eac8f2_0SS4500000
reinforcement covers an area of four intersections of transverse and longitudinal bars. Ensure, , as a minimum, at every other intersection. Either tie or lace spiral wire in piling at all four corners
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss4500000.pdf?sfvrsn=54391946_09950201ind
have a NEMA 4X rating. Pushbutton housings for intersections must be black. SUBARTICLE 995-9.7
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/9950201ind.pdf?sfvrsn=f8d9fb4c_12023 BOE Manual
Man-hour 2 1 MI Mile 0.001 MO Month 3 1 NM Net Mile 3, 4 0.001 PI Per Intersection 1 1
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2023-boe-manual.pdf?sfvrsn=3244e10b_144592625201-PLANS-03-SIGNALIZATION
SARASOTA - BRADENTON 75 95 FT PIERCE FT MYERS WEST PALM BEACH INTERSECTION TO WEST OF SUNSET DR. / GOLDEN GATE POINT INTERSECTION WIDENING AND RECONSTRUCTION OF SR 789 EAST OF BIRD KEY DR, INTERSECTION 7 632-7-1 611-2-1 649-21-10 1 EA 632-7-6 30" X 30" R10-15a VEHICLES TURNING STOP
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25117/44592625201-plans-03-signalization.pdf?sfvrsn=16ac1908_144965615201-PLANS-01-ROADWAY
OF THE INTERSECTION, AND MATCH THE BEGIN AND PROVIDED. THE LIMITS OF THE MILLING AND RESURFACING WERE CHOSEN BASED ON THE LOCATION OF THE EXISTING VEHICLE DETECTION AND SIGNAL FEATURES AT THE INTERSECTION OF US 441 AND 28TH STREET. FUNCTIONAL MILLING AND RESURFACING IS BEING THIS PROJECT IS AN INTERSECTION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25132/44965615201-plans-01-roadway.pdf?sfvrsn=66fdb30f_1oom_20240716_2023-Maintenance-Contract-Cost-Summary-by-Pay-Item
$15.00 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 73.000 $16,124.97 $220.89, INTERSECTION, FURNISH & INSTALL PI 2.000 $13,053.15 $6,526.58 0632 7 2 SIGNAL CABLE- REPAIR/REPLACE/OTHER, FURNISH & INSTALL LF 483.000 $3,187.80 $6.60 0632 7 6 SIGNAL CABLE, REMOVE- INTERSECTION PI
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/cont/oom_20240716_2023-maintenance-contract-cost-summary-by-pay-item.pdf?sfvrsn=f1bf184_1RSigningPavementMarkingsand Lighting
Tables and find the intersection point. See Sheet 3. largest area should be analyzed to determine, and - In the Column (Post) and Foundation Table, the value intersection value is "4" (4" OD). column labeled "11 FT". For the example the intersection of the row labeled "16 SF" and the - To determine
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/ser/rsigningpavementmarkingsand-lighting.pdf?sfvrsn=6361cd10_5FDOTCADDStandardFilenamesTable-20200811
-ORD-Seed2D.dgn] fdotmaster.dwt EMO EMO Design Files INTDEM* Intersection-Interchange Details planrd, -ORD-Seed2D.dgn] fdotmaster.dwt ITS Intelligent Transportation Systems Design Files INTDIT* Intersection, ] fdotmaster.dwt 17 ROADWAY Roadway Design Files INTDRD* Intersection-Interchange Details planrd
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/publications/caddmanualfdm/fdotstandardfilenames/fdotcaddstandardfilenamestable-20200811.pdf?sfvrsn=be1fcd87_31RSigningPavementMarkingandLighting
and find the intersection point. See Sheet 3. largest area should be analyzed to determine, and - In the Column (Post) and Foundation Table, the value intersection value is "4" (4" OD). column labeled "11 FT". For the example the intersection of the row labeled "16 SF" and the - To determine
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2023/ser/rsigningpavementmarkingandlighting.pdf?sfvrsn=866f473f_3D3-04-10-25BSN
0003 Signalization 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 780.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 780.000 0630- 2- 11 CONDUIT, - NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 3.000 0635- 2- 11 PULL & SPLICE BOX, F&I
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/apr10/d3-04-10-25bsn.pdf?sfvrsn=b5091733_16760000.origind
1000 milliseconds, the unit shall trigger as if a conflict had occurred, causing the intersection, : Place the intersection into Flashing Operation. After meeting requirements for Flashing Operations, , the controller assembly shall immediately place the intersection on flash. Emergency flash may
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/internal/6760000.origind.pdf?sfvrsn=51900d4b_06760000-723FHWA
the intersection to transfer immediately into a flashing mode, and "stop-time" to be applied, labeled according to the following functions: (a) UCF – This toggle switch shall: Place the intersection, assembly shall immediately place the intersection on flash. Emergency flash may be initiated
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/6760000-723fhwa.pdf?sfvrsn=f8d48799_16760000-723FHWA2
the intersection to transfer immediately into a flashing mode, and "stop-time" to be applied, the intersection into Flashing Operation. After meeting requirements for Flashing Operations, all power, assembly shall immediately place the intersection on flash. Emergency flash may be initiated
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/6760000-723fhwa2.pdf?sfvrsn=83af2764_1