1087 search results for UNIT COST PER PAY ITEM

2024june-thu01-independentprojectcosts-notes

of the IPC process the project cost includes contingencies and percentage- based pricing for many items, for these items by establishing assumptions for production, resources, and crew sizes for each item of work, pricing, transportation costs, etc. Then they’ll roll all those costs up into the item cost. If there are different areas with different assumptions and cost, each area item cost will all go into determining the overall item cost for the project. 12 Independent Project Cost COST 80% of project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024june-thu01-independentprojectcosts-notes.pdf?sfvrsn=cfbf7f65_1

DB-Boilerplate 1-19

and the respective unit price change. c. The correct revised total per item. d. The revised total bid amount, Specialty Engineers will not be authorized to perform redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item, as a guaranty that the Contractor shall fulfill the terms of the Contract and pay all legal debts, . For items of the permanent work declared by the State Construction Office to be ”major” or “structural

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/design-build/db-boilerplate-1-19ea044dd864064d2a96a0149c529dc7ec.pdf?sfvrsn=35d06d7a_7

0090103LS-2.impl

to acceptable tolerances at no additional cost to the Department; acceptance at no pay; or, acceptance, . Table 9-1 Item Description Unit Unit Prices 9-2.2.2AsphaltDesignThickness/SpreadRate:Theaverage spread, at reduced pay or corrected at no cost to the Department. Final disposition of the finished roadway, will then be applied using the unit prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit Prices, adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item Description Unit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/0090103ls-2.impl.pdf?sfvrsn=a30efd95_0

7-18-DB-Boilerplate

and the respective unit price change. c. The correct revised total per item. d. The revised total bid amount, Specialty Engineers will not be authorized to perform redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item, as a guaranty that the Contractor shall fulfill the terms of the Contract and pay all legal debts, . For items of the permanent work declared by the State Construction Office to be ”major” or “structural

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/design-build/7-18-db-boilerplate.pdf?sfvrsn=96d4e0a1_3

1-18-DB-Boilerplate

or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item on the critical path having the least amount of total float, in these Specifications. Funds for this agreement are drawn against the Initial Contingency Pay Item, ; the estimate of the various quantities (if applicable); the pay items of work to be performed, ID. b. The correct bid item number for which the price is being changed and the respective unit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/design-build/1-18-db-boilerplate.pdf?sfvrsn=2508cb9_1

7-17-DB-Boilerplate-2-27-17

or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item on the critical path having the least amount of total float, in these Specifications. Funds for this agreement are drawn against the Initial Contingency Pay Item, ; the estimate of the various quantities (if applicable); the pay items of work to be performed, ID. b. The correct bid item number for which the price is being changed and the respective unit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/design-build/7-17-db-boilerplate-2-27-17.pdf?sfvrsn=5ac8273b_1

Rural 08

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 5.00 $669,410.22 101-1, Manager: Cost-Per-Mile Model Version 21 Project Grand Total $15,613,376.17 Description: October, DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 21 Project Grand Total, Project Manager: Cost-Per-Mile Model Version 21 Project Grand Total $15,613,376.17 Description

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-08.pdf?sfvrsn=6eefe5f5_1

Rural 22

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $551,140.34 101-1, $380.00 $21,280.00 Project Manager: Cost-Per-Mile Model Version 21 Project Grand Total, . Page 1 of 3 District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version, County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 21 Project Grand Total

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-22.pdf?sfvrsn=bb0f0c8d_1

Rural 23

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $456,407.76 101-1, , ROUND, 48"S/CD 56.00 LF $420.00 $23,520.00 Project Manager: Cost-Per-Mile Model Version 19 Project, DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $5,577,759.20, District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 19 Project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-23.pdf?sfvrsn=f8527f29_1

Rural 21

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $430,890.21 101-1, , 54"S/CD 200.00 LF $550.00 $110,000.00 Project Manager: Cost-Per-Mile Model Version 19 Project, ' Paved Shoulders Page 1 of 3 District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per, District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 19

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-21.pdf?sfvrsn=a042b2e_1

Rural 26

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $495,304.06 101-1, , ROUND, 42"S/CD 56.00 LF $380.00 $21,280.00 Project Manager: Cost-Per-Mile Model Version 19, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $6,053,110.88 Description, Unknowns Page 2 of 3 District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-26.pdf?sfvrsn=83effc06_1

2341000.origind

revision involve Pay Item changes? Yes No Estimates staff contacted (name): Will the proposed, the specification verbiage and to be consistent with other pay items that get bituminous, in these calculations is set at 6.25%. Payment will be made under: Item No. 285- 7- Optional Base - per square, will include the cost of the liquid asphalt binder or the asphalt recycling agent and the tack coat application as directed in 300-8. For the calculation of unit price adjustments of bituminous material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/2341000.origind.pdf?sfvrsn=d81737e7_0

6650000-723origind

Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual, . The Contract unit price for pedestrian detectors, will be paid per each, and will include, for poles, pedestals, and posts will be made under their respective pay item numbers. 665-6 Basis, and equipment during the warranty period at no cost to the Department or the maintaining agency. 665-4, . Payment will be made under: Item No. 665- 1- Pedestrian Detector - each

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/6650000-723origind.pdf?sfvrsn=27421136_1

FY2024-25eBookFINALcomp-REVISED3-4-24

. Estimated Quantities Report. The Estimated Quantities Report contains pay item and quantity information, Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any calendar day, , and as approved by the Federal Highway Administration. This item has been digitally signed and sealed, )............................................. 1093 METAL MATERIALS AND FABRICATION DETAILS FOR METAL ITEMS 960 Post-Tensioning, Structural Steel and Miscellaneous Metal Items (Other than Aluminum)......... 1109 965 General

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp-revised3-4-24.pdf?sfvrsn=16ab03d_1

FY2024-25eBookFINALcomp(signed and sealed)R2

to perform redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item on the critical path having the least amount, pay item and quantity information for the project. When the Plans do not adequately describe, Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any calendar day on which, Administration. This item has been digitally signed and sealed by Daniel Strickland on the date adjacent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp(signed-and-sealed)r2.pdf?sfvrsn=c411cd67_1

FY2024-25eBookFINALcomp-REVISED1-24-24

of the work. Estimated Quantities Report. The Estimated Quantities Report contains pay item and quantity, the Initial Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any, ); the pay items of work to be performed (if applicable); the Contract Time; the amount of Proposal, , and as approved by the Federal Highway Administration. This item has been digitally signed and sealed, )............................................. 1093 METAL MATERIALS AND FABRICATION DETAILS FOR METAL ITEMS 960 Post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp-revised1-24-24.pdf?sfvrsn=15b17f9c_1

FY2024-25eBookFINALcomp(signed and sealed)R

will not be authorized to perform redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item on the critical path having the least, Report contains pay item and quantity information for the project. When the Plans do not adequately, the Initial Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any calendar day, Administration. This item has been digitally signed and sealed by Daniel Strickland on the date adjacent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp(signed-and-sealed)r.pdf?sfvrsn=e4025026_1

FY2024-25eBookFINALcomp

of the work. Estimated Quantities Report. The Estimated Quantities Report contains pay item and quantity, the Initial Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any, ); the pay items of work to be performed (if applicable); the Contract Time; the amount of Proposal, , and as approved by the Federal Highway Administration. This item has been digitally signed and sealed, )............................................. 1093 METAL MATERIALS AND FABRICATION DETAILS FOR METAL ITEMS 960 Post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp.pdf?sfvrsn=62b840b6_1

FY2024-25eBookFINALcomp(signed and sealed)

will not be authorized to perform redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the Plans. Controlling Work Items. The activity or work item on the critical path having the least, Report contains pay item and quantity information for the project. When the Plans do not adequately, the Initial Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any calendar day, Administration. This item has been digitally signed and sealed by Daniel Strickland on the date adjacent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/fy2024-25ebookfinalcomp(signed-and-sealed).pdf?sfvrsn=1ff18897_1

SP4550512

items or payment methods. The cost of all additional work not listed above necessary to ensure, under: Item No. 455- 2- TreatedTimber Piling - per foot. Item No. 455- 14- ConcreteSheetPiling, No. 455-120- PointProtection-each. Item No. 455-133- SteelSheetPiling-per square foot. Item No. 455-137- Dynamic Load Tests - each. Item No. 455-143- TestPiles(Prestressed Concrete) - per foot. Item No. 455-144- TestPiles(Steel) - per foot. Item No. 455-145- TestPiles(ConcreteCylinder)-perfoot

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/january-2008/workbook/sp4550512.pdf?sfvrsn=c7004bbb_0
20 of 1087 results