3255 search results for intersection
D6-10-30-25BSN
0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 200.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 200.000 0102-115- TYPE III BARRICADE ED 500.000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/oct30/d6-10-30-25bsn.pdf?sfvrsn=cec85299_1Leon County Summary G1 27-31
INTERSECTION Type of Work: RIGHT OF WAY - FUTURE CAPACITY Phase Funding Source 2027 2028 2029 2030 2031, . OF L.L. WALLACE RD TO S. OF SR 61 INTERSECTION Type of Work: ADD LANES & RECONSTRUCT Phase Funding
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d3_documents/leon-county-summary-g1-27-31.pdf?sfvrsn=59fd5911_1Collier County Draft Tentative WP FY27-31
: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction Federal, $18,960,632 453415-1 - US 41 FROM 3RD AVE TO SR 84 INTERSECTION/MOBILITY IMPROVEMENTS PD&E Type
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/collier-county-draft-tentative-wp-fy27-31.pdf?sfvrsn=2125da39_1TP-12-19-25BSN
, TEMPORARY ED 12,512.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 3,250.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 3,250.000 0102-115
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/dec19/tp-12-19-25bsn.pdf?sfvrsn=546f4e73_1Standard Plans-FY 2025-26 CADD (DGN-CEL)
in intersection 604 102-606 DGN Two-Lane Roadway, Lane Closure Using Temporary Traffic, 613 102-615 DGN Multilane Roadway, Intersection Work 615 102-620 DGN
https://www.fdot.gov/design/standardplans/2026/standard-plans-fy-2025-26-cadd-(dgn-cel)E8W33
AND MAINTENANCE, INTERSECTION ED 3,368.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 3,368.000 0102-115- TYPE III BARRICADE ED 98,266.000 0102-120- TEMPORARY
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/e8w33.pdf?sfvrsn=e071062d_1E8V59
MESSAGE SIGN, TEMPORARY ED 4,662.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 2,874.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 2,874.000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/e8v59.pdf?sfvrsn=fab8a73a_1E6P79BidTabs
15,000.00 0040 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 200.000 ED 15.00000, AND MAINTENANCE, INTERSECTION 200.000 ED 15.00000 3,000.00 100.00000 20,000.00 50.00000 10,000.00 0050
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2025/oct30/e6p79bidtabs.pdf?sfvrsn=f0e93d19_144787815201-Geotech Report_Mast Arms
for the proposed mast arm signal structures proposed at the intersection of SR 8080 and Martin Luther, and Martin Luther King Jr Blvd. intersection in Hendry County, Florida. The approximate location
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-geotech-report_mast-arms819fd6b5-f1c7-4d35-90b0-0b8fa4821dfe.pdf?sfvrsn=2d79167a_1Standard Plans - FY 2026-27 CADD (DGN - CEL)
in intersection 604 102-606 DGN Two-Lane Roadway, Lane Closure Using Temporary Traffic, 613 102-615 DGN Multilane Roadway, Intersection Work 615 102-620 DGN
https://www.fdot.gov/design/standardplans/current/dgnsTrends & Conditions – Sources
Intersection Lighting Retrofit FDOT State Safety Office, Pedestrian Intersection Lighting Retrofit
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/trends---conditions-folder/trends-conditions-sources.pdf?sfvrsn=8c8d7976_13E8V59
MESSAGE SIGN, TEMPORARY ED 4,662.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 2,874.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 2,874.000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan27/e8v594fcdddbc5b0b42a5801728589a216f3b.pdf?sfvrsn=3cc69f22_1E8W48BidTabs
, INTERSECTION 3,250.000 ED 12.53500 40,738.75 2.00000 6,500.00 16.00000 52,000.00 0240 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 3,250.000 ED 12.53500 40,738.75 2.00000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/dec19/e8w48bidtabs.pdf?sfvrsn=7f9e34f1_1Standard Plans-FY 2025-26
-Lane, Two-Way, Intersection Work 604 102-606 Two-Lane Roadway, Lane Closure Using Temporary, Multilane Roadway, Intersection Work 615 102-620 Multilane Roadway, Temporary Diversion 620 102-625
https://www.fdot.gov/design/standardplans/2026/standard-plans-fy-2025-26FMPP January 2026 Meeting Summary 2026-01-29
are mitigated. • Case Study Examples o Widening/intersection control upgrade project ▪ A project to address congestion and delays included roadway widening and intersection control up grades
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/resources/fmpp-january-2026-meeting-summary-2026-01-29.pdf?sfvrsn=79e53d9b_1Standard Plans - FY 2026-27
, Intersection Work 604 102-606 Two-Lane Roadway, Lane Closure Using Temporary Traffic Signals 606, , Intersection Work 615 102-620 Multilane Roadway, Temporary Diversion 620 102-625 Temporary
https://www.fdot.gov/design/standardplans/current/27Part2_073124_clean
broadly, such as “the intersection at SR-XX.” However, termini that may not be considered logical, - lane and multilane), urban streets and intersections (roundabout, signalized and unsignalized, , interchange, and intersection projects. • FDOT Project Traffic Forecasting Procedure, Topic, intersection turning movements and calculating Equivalent Single Axle Load (ESAL) forecasts. • FHWA
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/part2_073124_clean.pdf?sfvrsn=85d67cba_3