4266 search results for REPORT NUMBER
fdot-bed34-977-01-rpt
, III Hossain Shahriar University of West Florida FINAL REPORT May 2024 ii Disclaimer, and not necessarily those of the Florida Department of Transportation. iii Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle Connected Vehicle Security Metrics and Threat Intelligence 5. Report Date May 2024 6. Performing, Organization Report No. 9. Performing Organization Name and Address University of West Florida
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed34-977-01-rpt.pdf?sfvrsn=b2d40632_1Part 2 Chapter 3 Training_10.23.2024
and Environment Study COA - Class of Action PER - Preliminary Engineering Report • Refer, and evaluated. The PM must review the Programming Screen Summary Report for projects that were, Alternative. The actual number of alternatives evaluated depends on a variety of factors. Project, and Environmental Linkages (PEL) for scope and number of alternatives to be considered during the PD&E Study, & Need Ability to meet Purpose and Need Social & Economic Environment Number of parcels (business
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/part-2-chapter-3-training_10-23-2024.pdf?sfvrsn=16ea7e76_3SS5550000
and horizontal) with a minimum distance between points of 100 feet. Provide a sufficient number, Requirements. 555-6.1 Boring Path Report: Furnish a Bore Path Report to the Engineer within seven days of the completion of each bore path. Include the following in the report: (a) Location of project and financial project number including the Permit Number when assigned (b) Name of person, plans station number or reference to a permanent structure within the project right of way) (d
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss5550000.pdf?sfvrsn=7516fadc_0section3.4-51815
number will be assigned to the material by the PEO. 3.4.6.4.1 Field Evaluation for Asphalt, personnel. (B) Updatedlist of materials being supplied at each supply location with their APL number, of shipments. The outline shall include a statement that the transport vehicle inspection report, at the supply location for at least 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, and sample date is clearly labeled on the containers. Store
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/materials-manual/section3-4-51815.pdf?sfvrsn=1f2461d9_1Section3.4-100915
evaluation (if applicable) proves satisfactory, an APL number will be assigned to the material by the PEO, supplied at each supply location with their APL number. (C) Currentlistoftestsandqualifications, include a statement that the transport vehicle inspection report, signed by the responsible inspector, days from the date of sampling. Ensure that the tank number, Supplier’s LOT/Batch number, material, an Inspection Report through the Department’s database notificationand send it to the Supplier. Any
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/materials-manual/section3-4-100915.pdf?sfvrsn=24109b63_1650-000-002_ETDM_Manual_Ch6-Effective-2024-1231
Report (SDR) provides results on a number of economic, demographic, and social variables from the four, , the project’s ETDM Coordinator publishes a summary report, which is available to the public, SDR or gathered by a FDOT or MPO/TPO CLC. The EST GIS Analysis Report also provides additional, Geographic Data Library. The standard EST GIS Analysis Report identifies natural, physical, social and cultural resources in the area according to the EST GIS database. The Sociocultural Data Report
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/etdm/2024-etdm-manual/650-000-002_etdm_manual_ch6-effective-2024-1231.pdf?sfvrsn=94cbe75f_1Final-MPOAC-Staff-Minutes-10_28_21
. PUBLIC COMMENTS No public comments were made. 4. EXECUTIVE DIRECTOR’S REPORT • UPWP REPORT Item 4A, UPWP Report, was deferred to the MPOAC budget discussion under item 6B. • LEGISLATIVE UPDATE, bills have been submitted to date, but Mr. Kramer noted that this number is changing quickly. Previously, the number of bills typically exceeds 1000. The bills of interest to the MPOAC membership, Metropolitan Planning Administrator, presented the FDOT Agency Report and reviewed recent FDOT
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2021/final-mpoac-staff-minutes-10_28_21.pdf?sfvrsn=a2a63968_120231211_CTD_Business_Meeting_Pkg
the meeting (Microsoft Teams) Conference Call-In Number: 1-850-739-5589 Conference Code: 395 566 126# Item, VII. Approval of 2023 Annual Performance Report David Darm, Executive Director VIII. Innovative, . Legislative Budget Request for FY24-25 David Darm X. Executive Director Report David Darm XI, carried unanimously. Annual Operating Report (AOR) Study Commissioner Knight and Casey Perkins provided, was provided to Executive Director David Darm. Thomas Howell Ferguson presented the final report
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2023meetings/20231211_ctd_business_meeting_pkg.pdf?sfvrsn=4ba34f4e_19290101-724origind
. The laboratory must authorize the CCRL to send a copy of the final inspection report and proficiency, Report: A certification from the SCM Pproducer showing that the SCM meets the requirements of this Section. The test report must include, at a minimum, the following information: a. The tType of SCM. b. The production period. c. Chemical and physical analysis of the SCM. d. The silo numbers, of industrial or municipal waste in incinerators. The SCM Producer shall report: 1. If the material is fly ash
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9290101-724origind.pdf?sfvrsn=e32e376b_1451734 Technical Scope_Final No LRE 20250129
93/I-75 from SR 777 to SR 681 TECHNICAL SCOPE State Road Number: SR 93 (I-75) Section Number: 17075-000, No.: 451734-1 Work Mix: 0012 (Resurfacing) 1. Existing R/W Map Project Numbers: N/A 2. Old Construction Project Numbers: 406314-1_RRR_AddLanes_ MP 20.151_MP 29.519_FY10 3. Proposed projects within the same, houses or buildings adjacent to the project? No 13. Number of Existing Utilities: 11 Utilities, : The 2025 FDOT Design Manual (FDM) was used to develop this scope report as well as the Florida
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26128/451734-technical-scope_final-no-lre-20250129.pdf?sfvrsn=f39f113c_1449188_TechnicalScope_Final
: I-75 from SR 681 to S of SR 780 TECHNICAL SCOPE State Road Number: SR 93 / I-75 Section Number, Work Mix: 0012 (Resurfacing) 1. Existing R/W Map Project Numbers: N/A 2. Old Construction Project Numbers: 420240 (2009) 3. Proposed projects within the same limits (such as safety, sidewalk, houses or buildings adjacent to the project? No 13. Number of Existing Utilities: 12 Utilities, : The 2023 FDOT Design Manual was used to develop this scope report as well as the Florida Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26145/449188_technicalscope_final.pdf?sfvrsn=ebafde6c_1FY 14-15 Rapid Incident Scene Clearance (RISC) Annual Report - Final
FY 14-15 Rapid Incident Scene Clearance (RISC) Annual Report - Final, Fiscal Year 2014/2015 September 2015 Rapid Incident Scene Clearance (RISC) Annual Report, Clearance Annual Report Fiscal Year 2014/2015 i Table of Contents Introduction, Shawn.Kinney@dot.state.fl.us. Rapid Incident Scene Clearance Annual Report Fiscal Year 2014/2015 1, on limited-access facilities. Table 1 shows the number of RISC vendors, roadway segments, and miles of program coverage by District: Rapid Incident Scene Clearance Annual Report Fiscal Year 2014/2015
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/archive/risc-reports/fy-14-15-rapid-incident-scene-clearance-(risc)-annual-report---final.pdf?sfvrsn=a5179549_1454941 Technical Scope
Pannell, PE RE: SR 544 from SR 600 (US 92) to W of 8th St NW (US 17) TECHNICAL SCOPE State Road Number: SR 544 Section Number: 16140000 County: Polk County Project Limits: SR 544 from SR 600 (US 92, . Existing R/W Map Project Numbers: 614-104 (1951); 80 feet minimum 16140-2501 (1962); varies 16140-2503 (1968); 114 feet minimum 16140-2508 (1985); varies 2. Old Construction Project Numbers, ); Truck % = 10.0 12. Are there any old houses or buildings adjacent to the project? No 13. Number
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/454941-technical-scope.pdf?sfvrsn=668aed8f_1444634-1_SR72_PER-Draft
Engineering Report Page 2 PROFESSIONAL ENGINEER CERTIFICATION PRELIMINARY ENGINEERING REPORT Project: SR 72 (Clark Road) PD&E Study ETDM Number: 14441 Financial Project ID: 444634-1-22-01 Federal Aid Project Number: N/A This preliminary engineering report contains engineering information, DRAFT PRELIMINARY ENGINEERING REPORT Florida Department of Transportation District One SR 72, Management Number: 444634-1 ETDM Number: 14441 Date: June 2, 2025 The environmental review
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72_per-draft.pdf?sfvrsn=44a9f920_1SS9900000
number shall be affixed on the equipment. 990-3.2 Portable Arrow Board: 990-3.2.1 Arrow Board Matrix, to meet the legibility distance is listed as follows: Type Minimum Size Minimum Number of Elements, regulatory sign with interchangeable numbers showing the posted speed limit above the message display. (b, Traffic Counter: The unit shall be fitted with a device, which counts the number of vehicles passing, of the number of vehicles passing the radar speed display unit. (2) Digital readout of the number
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss9900000.pdf?sfvrsn=3ce57adf_0cost
Expenditures vs. Number of Parcels Acquired . . . . . . . . . . . . . . . . . . . . 9 F i g u r e 1, . This report is part of a series of reports on transportation funding. The Transportation Resources, and investments. The purpose of this report, Transportation Costs, is to compile and report on trends in various, revenues than to changes in costs. This report focuses on typical costs incurred by FDOT and some, transportation users as well as transportation providers, this report does not include detailed statistics
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/trends/tc-report/cost_0c6ba6fb-c3fa-4259-b358-3b2a897ae027.pdf?sfvrsn=7672cd64_0Governing-Board-meeting-packet-July-2019
2018/2019 Budget July 1, 2018 to June 30, 2019 Item Number 4B Executive Director’s Report MPOAC, . Public Comments (non-agenda items) 4. Executive Director’s Report A. UPWP Report B. MPOAC Weekend, or by email to brigitte.messina@mpoac.org. Item Number 1 Call to Order & Pledge of Allegiance, for the Pledge of Allegiance. REQUESTED ACTION: None ATTACHMENT: None Item Number 2 Approval, . PUBLIC COMMENTS No public comments were made. EXECUTIVE DIRECTOR’S REPORT A. UPWP REPORT Mr
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2019/governing-board-meeting-packet-july-2019.pdf?sfvrsn=a008b1fe_1Section8.3-082818_7-19WB
whenever possible, the number of corrected or defective products must be kept to a minimum, gathered for 6 months for each product group includes the following: (1) Total number of products produced; (2) Number of major defects, by defect type, in the products produced; (3) Total number, , which is computed by dividing the value in (3) above (total number of major defects) by the value in (1) above (total number of products produced). For example: if 100 products are produced
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section8-3-082818_7-19wb.pdf?sfvrsn=1f2798c7_1Section8.3-082818_7-19WB
whenever possible, the number of corrected or defective products must be kept to a minimum, gathered for 6 months for each product group includes the following: (1) Total number of products produced; (2) Number of major defects, by defect type, in the products produced; (3) Total number, , which is computed by dividing the value in (3) above (total number of major defects) by the value in (1) above (total number of products produced). For example: if 100 products are produced
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section8-3-082818_7-19wb.pdf?sfvrsn=d0cccf40_12022-mitigation-payment-handbook_combined
Contributions on how to pay mitigation contribution fees. If the actual number of gopher tortoises relocated is less than the number included in the permit application, the applicant is entitled, project number on the plan that may have Environmental Mitigation Payment Processing Handbook May 2022 8, , subject to quarterly adjustment. The Contract/Encumbrance Numbers are listed below: Contract/Encumbrance Numbers: NWWMD Northwest Florida Water Management District SFWMD South Florida Water
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/2022-mitigation-payment-handbook_combined_f5237c05-4864-476a-a494-095996755a55.pdf?sfvrsn=e7e0dea3_2