4223 search results for drainage

District One Letting and Project Information

North and South E1W97 Polk Drainage Improvements April 17, 2025, Collier Pavement Only Resurface E1X76 Hendry Drainage Improvements E1X99 Lee Halfway Creek Bridge Deck

https://www.fdot.gov/contracts/district-offices/d1/lettings/dist-letting-project-info.shtm

2026 Cycle -TA Set-Aside Program Resource Guide

facilities. 9. Drainage improvements related to poor maintenance or to upgrades to inadequate systems, ), additional components such as drainage, lighting, etc. ➢ Cost Reimbursement Agreement - i.e

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/nwflroads/2026-cycle--ta-set-aside-program-resource-guide.pdf?sfvrsn=3f0503bb_1

2025 District One Letting and Project Information

Polk Drainage Improvements April 17, 2025 Important Letting, E1X76 Hendry Drainage Improvements E1X99 Lee Halfway Creek Bridge Deck Maintenance and Repair

https://www.fdot.gov/contracts/district-offices/d1/lettings/2025/2025-district-one-letting-and-project-information

Indian-River

BETWEEN THE BIKE LANES AND TRAVEL LANES. PROJECT WILL ALSO INCLUDE ADA ENHANCEMENTS, DRAINAGE UPGRADES, Drainage and/or Pond Siting Report In Progress 5 12/1/2025 12/5/2025 -10 RM Conduct and Certify

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/utilities/docs/d4/indian-river.pdf?sfvrsn=1dfa8d90_4

2025 District Seven Letting and Project Information

Market Place Proposal ID County Major Work Type Addendum E7U69-R0 Districtwide Drainage Repair - Drainage Improvements Experience Required December 10, 2025 Important

https://www.fdot.gov/contracts/district-offices/d7/lettings/2025/2025-district-seven-letting-and-project-information

2025 District Six Letting and Project Information

Drainage Inspection & Cleaning Prequalification is not required. Z6176-R0 Miami-Dade Pre-Event, E6P94-R0 Miami-Dade Drainage Cleaning Prequalification is not required E6Q07-R0 Miami-Dade Bid

https://www.fdot.gov/contracts/district-offices/d6/lettings/2025/2025-district-six-letting-and-project-information

E3W23Addendum005

2022) Pond Siting Report Technical Memorandum Drainage Design Documentation (April 2022) Drainage Models (Dupont Drainage Models.zip) Location Hydraulics Technical Memorandum (July 2019) Bay, , storm drainage systems, intelligent transportation systems, signing and pavement marking, the connection to be fully tied in with asphalt or concrete at commercial grades. Drainage The Design-Build Firm will design and construct a drainage system to convey runoff from the project. The Design-Build

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum005.pdf?sfvrsn=e8e1704f_1

E3W23Addendum006

Memorandum Drainage Design Documentation (April 2022) Drainage Models (Dupont Drainage Models.zip, construction, storm drainage systems, intelligent transportation systems, signing and pavement marking, the connection to be fully tied in with asphalt or concrete at commercial grades. Drainage The Design-Build Firm will design and construct a drainage system to convey runoff from the project. The Design, Firm will develop a drainage system to convey and treat runoff from the project. This requirement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum006.pdf?sfvrsn=5e056a6f_1

E3W23Addendum007

) Typical Section Package (Approved October 2022) Pond Siting Report Technical Memorandum Drainage Design Documentation (April 2022) Drainage Models (Dupont Drainage Models.zip) Location Hydraulics, facility construction, storm drainage systems, intelligent transportation systems, signing, require the connection to be fully tied in with asphalt or concrete at commercial grades. Drainage The Design-Build Firm will design and construct a drainage system to convey runoff from the project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum007.pdf?sfvrsn=f13446f_1

26620 - Scoping report

....................................................................................... 19 3.1.8 Existing Drainage, ................................................................. 44 3.2.4 Drainage Design Criteria, ......................................................................................... 50 3.4.2 Potential Drainage Impacts, 3-3 Drainage Basins established under existing permit 13-0138-P ............................ 23 Table 3-4 Drainage Basins established under existing permit 06-06776-P .......................... 27

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/26620/26620---scoping-report8344fe0c-428e-4a3a-851d-26b8e805a8ce.pdf?sfvrsn=25f04f43_1

E3W23Addendum004

Memorandum Drainage Design Documentation (April 2022) Drainage Models (Dupont Drainage Models.zip, construction, storm drainage systems, intelligent transportation systems, signing and pavement, or concrete at commercial grades. Drainage The Design-Build Firm will design and construct a drainage, will be provided at a later date. The Design-Build Firm will develop a drainage system to convey and treat, ) will not be allowed. Within the project limits, the Design-Build Firm shall replace the existing drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum004.pdf?sfvrsn=e3521d92_1

PublicHearing_DISTRICTWIDE_Summary

- DISTRICTWIDE DRAINAGE DESIGN AND PLANS REVIEW CONSULTANT Type of Work: PRELIMINARY ENGINEERING Phase, DRAINAGE DESIGN AND PLANS REVIEW CONSULTANT Type of Work: PRELIMINARY ENGINEERING Phase Funding Source, DRAINAGE & TECH CONSULTANT SERVICES Type of Work: DRAINAGE IMPROVEMENTS Phase Funding Source 2025, 428345-5 $150,000 $150,000 428345-6 - DISTRICTWIDE NPDES PUSHBUTTON DRAINAGE & TECH CONSULTANT SERVICES Type of Work: DRAINAGE IMPROVEMENTS Phase Funding Source 2025 2026 2027 2028 2029 Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d6_documents/publichearing_districtwide_summary.pdf?sfvrsn=3e8adbe9_1

451270 Technical Scope_Final

13.100-MP 13.300 3. Proposed projects within the same limits (such as safety, sidewalk or drainage, – CATV; Duke – Electric; Highlands – Traffic Signals; Sun n lakes – Drainage, Sewer, Water; TECO – Gas, section keyholes are likely not feasible due to the right of way constraints and the drainage, the bridges as-is without the traffic barrier. Drainage Scope Items: The existing drainage consists, investigation, some additional analysis, and a construction fix. There are no other apparent drainage issues

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25122/451270-technical-scope_final.pdf?sfvrsn=70ae3319_1

PublicHearing_DISTRICTWIDE_Summary (1)

- DISTRICTWIDE DRAINAGE DESIGN AND PLANS REVIEW CONSULTANT Type of Work: PRELIMINARY ENGINEERING, Total for Project 411433-3 $155,000 $155,000 $155,000 411433-4 - DISTRICTWIDE DRAINAGE DESIGN, $4,458,015 428345-5 - DISTRICTWIDE NPDES PUSHBUTTON DRAINAGE & TECH CONSULTANT SERVICES Type of Work: DRAINAGE IMPROVEMENTS Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract, DISTRICTWIDE Maintenance 428345-6 - DISTRICTWIDE NPDES PUSHBUTTON DRAINAGE & TECH CONSULTANT SERVICES

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/2024-work-program-hearing/publichearing_districtwide_summary-(1).pdf?sfvrsn=52b652b1_1

D5-05-06-25BSN

under this Contract consists of drainage system restoration, including ditch cleaning, inlet and side drain repair & replacement, and installation of new drainage culverts & inlets. Experience, in the performance of Drainage Repair, or the Project Superintendent must have at least three (3) years of like, with the Department in "Drainage" will suffice to meet the above requirements. Call Order: 006

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/may06/d5-05-06-25bsn.pdf?sfvrsn=9a826b70_1

2025-PublicHearing_DISTRICTWIDE_Summary

$300,000 $300,000 $100,000 411433-3 - DISTRICTWIDE DRAINAGE DESIGN AND PLANS REVIEW CONSULTANT Type, DRAINAGE DESIGN AND PLANS REVIEW CONSULTANT Type of Work: PRELIMINARY ENGINEERING Phase Funding, $100,000 451079-3 - DRAINAGE IMPROVEMENT DISTRICTWIDE Type of Work: DRAINAGE IMPROVEMENTS Phase Funding, for Project 451079-3 $640,000 451079-4 - DRAINAGE IMPROVEMENT DISTRICTWIDE Type of Work: DRAINAGE, $640,000 Total for Project 451079-4 $640,000 451079-5 - DRAINAGE IMPROVEMENT DISTRICTWIDE Type of Work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d6-work-program-docs/2025-publichearing_districtwide_summary.pdf?sfvrsn=2fcb4726_1

44728715201-PLANS-01-ROADWAY

CROSS SECTIONS 42 - 78 29 - 41 DRAINAGE STRUCTURES 14 - 28 ROADWAY PLAN 13 GENERAL NOTES 8 - 12 PROJECT CONTROL 7 MODEL MANAGEMENT 6 TYPICAL SECTION 3 - 5 DRAINAGE MAP 2 SIGNATURE SHEET 1 KEY, E F O R P A D I R O L F DRAINAGE STRUCTURES 29 - 41 DRAINAGE MAP 3 - 5 SIGNATURE SHEET, IS IN THE PLANS FOR DOCUMENTATION AND TO ASSIST CONSTRUCTION PERSONNEL WITH DRAINAGE CONCERNS, . ENGINEER OF RECORD M A T C H L I N E S T A . 6 4 4 + 9 9 . 3 3 DRAINAGE MAP

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44728715201-plans-01-roadwayfed4c499-02bf-4dfc-bd72-b723d4cada10.pdf?sfvrsn=c2167945_1

2021FDM210ArterialsCollectors

. This will require detailing of the transition(s) in the roadway plans. Coordination between the Roadway, Drainage, of correcting pavement cross slope. Coordinate with the District Drainage Engineer to determine whether, and Collectors https://www.fdot.gov/roadway/Drainage/ManualsandHandbooks.shtm 210.2.5 Roadway, sufficient depth to provide positive drainage of the adjacent sub-grades. Typically, this requires a median, capacity to ensure good drainage. See FDM 260.5 for information on bridge medians. 17 January 1, 2021

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2021/2021fdm210arterialscollectors.pdf?sfvrsn=74f8a505_3

BDV31-932-10-Task5_MPO_Resiliency_Final_Report

. While not always called resiliency strategies, drainage improvements and stormwater maintenance, , regulatory standards, adopting standardized climate projections, resiliency funding, drainage/ stormwater

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/resilience/bdv31-932-10-task5_mpo_resiliency_final_report.pdf?sfvrsn=7dad8b41_1

43018535201-PLANS-01-ROADWAY_PLANS

CROSS SECTION PATTERN LINES 337 - 338 DRAINAGE SUMMARY TABLES 320 - 336 DRAINAGE STRUCTURES 258 - 319 DRAINAGE PROFILES 209 - 257 DRAINAGE DETAILS 199 - 208 POND SOIL SURVEY 192 - 198 POND DETAILS, - 170 RAMP TERMINAL DETAILS 158 - 162 ROADWAY PROFILES 124 - 157 DRAINAGE PLANS 87 - 123, SECTIONS 16 - 27 INTERCHANGE DRAINAGE MAP 15 DRAINAGE MAP 3 - 14 SIGNATURE SHEET 2 NOTES, KEY SHEET 1 EROSION CONTROL PLANS 469 - 504 STORMWATER POLLUTION PREVENTION PLAN 466 - 468 DRAINAGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad-25105/43018535201-plans-01-roadway_plans.pdf?sfvrsn=60ff68a0_1
20 of 4223 results