3009 search results for intersection

Z5092

, F&I, TYPE P-V EA 10.000 0670- 4- 1 INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY, FURNISH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/jun03/z5092.pdf?sfvrsn=c8387f90_1

451734 Technical Scope_Final No LRE 20250129

) southbound over an unnamed ditch 4.408 miles north of the intersection of SR 777 and SR 93 (I-75, carrying SR 93 (I-75) northbound over an unnamed ditch 4.494 miles north of the intersection of SR, of the intersection of SR 681 and SR 93 (I-75). The box culvert carries three (3) 12’-0” wide travel, (I-75) southbound over an unnamed ditch 1.632 miles south of the intersection of SR 681 and SR 93 (I-75

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26128/451734-technical-scope_final-no-lre-20250129.pdf?sfvrsn=f39f113c_1

521-630

details of the intersection of the retaining 9. Finish Sidewalks in accordance with Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/521-630.pdf?sfvrsn=7cd1b9b1_1

649-010

Intersection not Shown Clamps for Cables at 3 1 649-010 STEEL STRAIN POLE 11/01/23 STRAIN POLE ASSEMBLY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/649-010.pdf?sfvrsn=527772f9_1

PublicHearing_ORANGE COUNTY_Summary

for Project 444315-2 $3,579,900 445696-1 - SR 438 INTERSECTION IMPROVEMENTS AT KINGSLAND AVE Type, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Federal, INTERSECTION IMPROVEMENTS Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM Phase Funding Source 2026 2027, COUNTY Turnpike 453760-1 - TSM&O BEACHLINE (SR 528) AT JETPORT DR Type of Work: INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_orange-county_summary0fb85bb3-ccca-488b-9f39-025fcf8ad257.pdf?sfvrsn=d93e95bb_2

D5-12-02-25BSN

, INTERSECTION ED 100.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/dec02/d5-12-02-25bsn.pdf?sfvrsn=8ff808d1_1

441700-1_Cove Road PD&E_Final_Location Hydraulics Memo

. Signalized intersections within the project limits are located at Kanner Highway, Atlantic Ridge, . Intersection improvements within the project limits will also be evaluated to accommodate anticipated future, intersections within the project limits are located at Kanner Highway, Atlantic Ridge, Legacy Cove Circle, . Intersection improvements within the project limits will also be evaluated to accommodate anticipated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1_cove-road-pd-e_final_location-hydraulics-memo.pdf?sfvrsn=e57f43e8_1

E1W47Addendum002

. and Cattlemen Rd. intersections with strain poles. The signal at Paramount Dr. shall accommodate a future, . Additional signal heads, and pedestrian signals will be established at the existing intersection of Fruitville Road and Lakewood Ranch Blvd. The following items are required at the signalized intersections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum002.pdf?sfvrsn=bd70d108_1

E1W47Addendum003

at Paramount Dr. and Cattlemen Rd. intersections with strain poles. The signal at Paramount Dr. shall, intersection of Fruitville Road and Lakewood Ranch Blvd. The following items are required at the signalized intersections of Paramount Dr, Cattlemen Rd, I-75 SB Ramps, and I-75 NB Ramps:  Multiple

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum003.pdf?sfvrsn=d5100908_1

E1W47RFP

at Paramount Dr. and Cattlemen Rd. intersections with strain poles. The signal at Paramount Dr, at the existing intersection of Fruitville Road and Lakewood Ranch Blvd. The following items are required at the signalized intersections of Paramount Dr, Cattlemen Rd, I-75 SB Ramps, and I-75 NB Ramps

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47rfp.pdf?sfvrsn=fd0af1fb_9

E1W47Addendum010

. intersections with strain poles. The signal at Paramount Dr. shall accommodate a future expansion, heads, and pedestrian signals will be established at the existing intersection of Fruitville Road and Lakewood Ranch Blvd. The following items are required at the signalized intersections of Paramount

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum010.pdf?sfvrsn=fbed3cdb_1
20 of 3009 results