4070 search results for fla

District 5 WP Public Hearings

projects within Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter, and Volusia

https://www.fdot.gov/topics/fdot-work-program/district-5-wp-public-hearings

Memorial Markers Applications

CO-MEMMARK395@dot.state.fl.us 1 (888) 638-0250 Flagler CO-MEMMARK591@dot.state.fl.us 1 (800) 780-7102 Franklin

https://www.fdot.gov/maintenance/divisions.shtm/roadway/memorialmarkers.shtm/memorial-markers-applications

20241211_452560-1_SR-985_87072

 05/13/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO003 PAVEMENT EVALUATION CORING AND CONDITION DATA INPUT DATA REPORT MANDIST FINPROJ TYPSECT MESSAGE 06 452560-1-52-01 01 THE CONTROL CARD IS CORRECT 05/13/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO103 PAVEMENT EVALUATION CORING AND CONDITION DATA FIN PROJ: 452560-1-52-01 NAME: NW 107 AVE CORED BY: BLASCOM TYP SECT: 01 FROM: N OF FLAGLER ST DATE: 2024-12-11 TO: N

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d6/87/20241211_452560-1_sr-985_87072.pdf?sfvrsn=55a1ac77_2

US Routes

: Shanshan Yang, (305) 794-0731 USBR: Stephanie Moss, (386) 943-5734 Counties: Brevard, Flagler, Lake

https://www.fdot.gov/statistics/designations/us-routes

RLavin Resume

.  Widening HEFT to 10 Lanes with 4 interior Managed Lanes.  Widen bridges over SW 8th St and Flagler St

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/rlavin-resume.pdf?sfvrsn=81f66f99_1

Design Standards Revisions 2015

/A N/A N/A 11862 1-7 of 7 Roadside Flashing Beacon Assembly N/A N/A N/A 13417 1 of 1 Mounting Exit

https://www.fdot.gov/roadway/ds/15/rev.shtm

20_Drainage_Redlines

. Where not practical or possible in flat terrain, include design features to limit soils from, be maintained in very flat terrain by use of a rolling profile. 20.5.7 Spread Standards The spread, in both, . If other modifications, such as landscaping or providing flat slopes, can eliminate the potential hazard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/20_drainage_redlines.pdf?sfvrsn=6d57b5b6_7

6820000.FHWA

tight, with fixed panels for access to the lamp, power supply, and projection engine. 682-2.2.65 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer, requirements. Flat Panel Display Rear Projection Video Display Type Direct View LCD DLP or LCD, system flaw or failure occurs. 682-3 Warranty. 682-3.1 General: Ensure that CCTV cameras

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/6820000.fhwa.pdf?sfvrsn=2dfc2250_0

6820000.FHWA2

, power supply, and projection engine. 682-2.2.65 Flat Panel Display: Furnish and install a flat, : Use only display devices meeting the following minimum requirements. Flat Panel Display Rear, to require a restart of the observation period if a major system flaw or failure occurs. 682-3

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/6820000.fhwa2.pdf?sfvrsn=985d988b_0

6820000.comm2

, with fixed panels for access to the lamp, power supply, and projection engine. 682-2.2.65 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer, requirements. Flat Panel Display Rear Projection Video Display Type Direct View LCD DLP or LCD Size, system flaw or failure occurs. 682-3 Warranty. 682-3.1 General: Ensure that CCTV cameras and video

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6820000.comm2.pdf?sfvrsn=ca1c1df_0

6820000.resp2

, with fixed panels for access to the lamp, power supply, and projection engine. 682-2.2.65 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer, requirements. Flat Panel Display Rear Projection Video Display Type Direct View LCD DLP or LCD Size, system flaw or failure occurs. 682-3 Warranty. 682-3.1 General: Ensure that CCTV cameras and video

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6820000.resp2.pdf?sfvrsn=e8032499_0

6820000.FHWA

to the lamp, power supply, and projection engine. 7682-2.2.6 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer graphics information. Ensure, the following minimum requirements. Flat Panel Display Rear Projection Video Display Type Direct View, . The Engineer has the option to require a restart of the observation period if a major system flaw

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/6820000.fhwa.pdf?sfvrsn=41c1b681_0

Archive

Mounted Pedestrian Detector and Signals N/C Response Approved 654-001 Rectangular Rapid Flashing, Flashing Beacon Assembly Response Package Response Package Approved 659-010 Span Wire Mounted Sign Details, 430-020 Flared End Section N/C N/C Approved 430-030 Straight Concrete Endwalls Single and Multiple, " to 72" Pipe N/C Response Package Approved 430-020 Flared End Section N/C N/C Approved 430-021 Cross, and Sidewalk Curb Ramps N/C N/C Approved 522-003 Concrete Flared Driveways (NEW) N/C Response Package

https://www.fdot.gov/design/standardplans/irr/arcive.shtm

2024-2025 2nd Quarter SRES Report

. Despite declining fuel costs, binder prices remained flat over the same period. Industry surveys, geopolitical instability (36%). CONCRETE Concrete bids were flat this quarter, averaging $1,403 per, from $3.78 per gallon in 2024 to $3.66 per gallon 2025. Prices are forecast to be flat in 2026, three months. • Florida asphalt binder prices remained flat this quarter, falling 1% compared, Production Index was flat in November 2024 month- over-month and increased 1.1% year-over-year

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/sres/quarterly/2024-2025-2nd-quarter-sres-report.pdf?sfvrsn=b94057ab_1
20 of 4070 results