3165 search results for intersection
SLU Methodology Presentation_10.30.24
be placed at the intersection of the ROW and the trail/path (if present) and every 50 ft. along, • Trails • Linear fashion along trail • Intersection of the ROW & Trail (if present) & every 50 ft, shall be placed at the intersection of the ROW and the trail (if present) and every 50 ft. along
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/slu-methodology-presentation_10-30-24.pdf?sfvrsn=b9647139_12025-26-Update Training
W16-1P sign to match MUTCD. 2)Index 102-615 – Multilane Roadway, Intersection Wo rk • Sheet 4: Added, or Drawings Index 102-615 Multilane Roadway, Intersection Work Sheet 4: MUTCD Update • Added new, Sheet or Drawings Index 102-615 Multilane Roadway, Intersection Work Sheet 4: MUTCD Update
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/training/2025-26-update-training.pdf?sfvrsn=4fdabdc7_1SummaryChanges-SurveyingMappingHandbook
of Intersection POC – Point on Curve POT – Point on Tangent PPC – Project Primary Control SURVEYING, period. Mean High Water Line (MHWL) – The intersection of the tidal plane of mean high water, ) – The intersection of the plane of ordinary high water with the shore in areas without tidal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/geospatial/documentsandpubs/summarychanges-surveyingmappinghandbook.pdf?sfvrsn=3ebc91d9_1E6P82
OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 2.000 0632- 7- 2 SIGNAL CABLE- REPAIR/REPLACE/OTHER, FURNISH & INSTALL LF 2,000.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI 3.000 0632- 7- 7 SIGNAL CABLE, REMOVE- OUTSIDE OF INTERSECTION LF 1,000.000 0635- 2- 11 PULL & SPLICE BOX, F&I, 13
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/nov20/e6p82.pdf?sfvrsn=3b320a17_1D4 Public Hearing Report 2027 - Martin
for Project 443505-1 $8,349,561 444415-1 - SR-5/US-1 AT BAKER RD Type of Work: INTERSECTION, MARTIN COUNTY Highways 446257-1 - SR-5/US-1 @ SR-76/KANNER HIGHWAY Type of Work: INTERSECTION, 447555-1 - SR-710/SW WARFIELD BOULEVARD AT CR-714/SW MARTIN HIGHWAY Type of Work: INTERSECTION (NEW
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2027---martin.pdf?sfvrsn=905497e0_3TP-01-13-26BSN3
markings, signalization, lighting and ITS communications at the intersection of US 27, SR 19, AND MAINTENANCE, INTERSECTION ED 265.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 265.000 0102-115- TYPE III BARRICADE ED 309.000 0104- 10- 3 SEDIMENT BARRIER LF
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/tp-01-13-26bsn3.pdf?sfvrsn=70bba6de_3FDOT Spotlights Major Infrastructure Projects
of vehicles getting blocked within the intersection, and added new pedestrian camera detection, at Star Avenue intersection in Bay County, which will improve operations and enhance safety by removing a railroad crossing and constructing a roundabout, bridge, and new intersection with a traffic
https://www.fdot.gov/info/co/news/2025/1230202544787815201-PLANS 01-ROADWAY
ON TANGENT PKD = PARKER KALON NAIL AND DISK PK = PARKER KALON NAIL P.I. = POINT OF INTERSECTION P.C., OF INTERSECTION P.C. = POINT OF CURVATURE LS = LAND SURVEYOR LB = LICENSED BUSINESS I.R.C. = IRON ROD & CAP, and Direction from Nearest Intersection: 1.15 MILES WEST ALONG S.R. 80 FROM THE INTERSECTION OF S.R. 80, STREET) Distance and Direction from Nearest Intersection: 1.0 MILES WEST ALONG S.R. 80 FROM THE INTERSECTION OF S.R. 80 AND S.R. 29 (BRIDGE STREET) Section: 8 Township: 43 S Range: 29 E Roadway
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-plans-01-roadway.pdf?sfvrsn=28251b6e_144787815201-PLANS 01-ROADWAY
AND DISK PK = PARKER KALON NAIL P.I. = POINT OF INTERSECTION P.C. = POINT OF CURVATURE LS = LAND, = PARKER KALON NAIL AND DISK PK = PARKER KALON NAIL P.I. = POINT OF INTERSECTION P.C. = POINT, Intersection: 1.15 MILES WEST ALONG S.R. 80 FROM THE INTERSECTION OF S.R. 80 AND S.R. 29 Monument, and Direction from Nearest Intersection: 1.0 MILES WEST ALONG S.R. 80 FROM THE INTERSECTION OF S.R. 80, DATUM: NAVD 1988 Distance and Direction from Nearest Intersection: 0.85 MILES WEST ALONG S.R. 80
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-plans-01-roadway6ca7a2dd-9652-4bbb-90ff-4dcd046fbbbe.pdf?sfvrsn=3c289f9b_1D4-01-05-24BSN
, INTERSECTION ED 397.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 397.000, - 2- 1 ITSFM LOCATION DOCUMENTATION- INTERSECTION EA 2.000 0630- 2- 11 CONDUIT, FURNISH & INSTALL, , BRIDGE MOUNT LF 469.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL, SIGNAL CABLE, REMOVE- INTERSECTION PI 2.000 0633- 1-123 FIBER OPTIC CABLE, F&I, UNDERGROUND,49-96
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/jan05/d4-01-05-24bsn.pdf?sfvrsn=119106e0_2DUVAL COUNTY_TWOP2026-2030 WPPH_BY DESCRIPTION_11-13-2024_SUBJECT TO CHANGE
: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Right of Way Federal $68,246, : INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Federal $6,040,056, for Project 443260-2 $500,000 438928-1 - SR5(US1) @ JTB INTERSECTION Type of Work: RIGHT OF WAY ACTIVITIES, : INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 PD & E Federal $505,000 Total, : INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Federal Earmark
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-description/duval-county_twop2026-2030-wpph_by-description_11-13-2024_subject-to-change.pdf?sfvrsn=ef4b4b33_1DUVAL COUNTY_TWP2026-2030 WPPH_BY ITEM_11-13-2024_SUBJECT TO CHANGE
: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Federal, MERRILL AVE TO 34TH AVE S Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027, INTERSECTION Type of Work: RIGHT OF WAY ACTIVITIES Phase Funding Source 2026 2027 2028 2029 2030 Right, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction, DUVAL COUNTY Highways 447225-1 - SR115(LEM TURNER ROAD) AT ROBENA ROAD Type of Work: INTERSECTION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-type/duval-county_twp2026-2030-wpph_by-item_11-13-2024_subject-to-change.pdf?sfvrsn=b5944dc0_1PublicHearing_HILLSBOROUGH COUNTY_Summary_2026-2030
: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Local $1,667,500 State, AVENUE AT 15TH STREET Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029 2030 Construction Local, 441661-2 - SR 60 AT HORTON ROAD Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027, COUNTY Miscellaneous 456061-1 - FLORIDA AVENUE AT BEARSS AVENUE Type of Work: INTERSECTION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d7wpph/publichearing_hillsborough-county_summary_2026-2030.pdf?sfvrsn=277c7f4e_1D3-12-11-25BSN
SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 1,419.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 1,419.000 0102-115- TYPE III BARRICADE ED 63,288.000 0104- 1, - 2- 1 ITSFM LOCATION DOCUMENTATION- INTERSECTION EA 1.000 0630- 2- 11 CONDUIT, FURNISH & INSTALL, - 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI 1.000 0633- 1-420 FIBER OPTIC CABLE, RELOCATE, UNDERGROUND LF
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/dec11/d3-12-11-25bsn.pdf?sfvrsn=9333c569_2DUVAL COUNTY_TWP2027-2031 WPPH_BY ITEM_10-13-2025_SUBJECT TO CHANGE
: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction Federal $7,808,289, $3,394,220 Total for Project 437651-1 $3,394,220 438928-1 - SR5(US1) @ JTB INTERSECTION Type of Work, ) INTERSECTION Type of Work: TRAFFIC SIGNAL UPDATE Phase Funding Source 2027 2028 2029 2030 2031, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction Federal, Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-item/duval-county_twp2027-2031-wpph_by-item_10-13-2025_subject-to-change.pdf?sfvrsn=ab7be430_1DUVAL COUNTY_TWP2027-2031 WPPH_BY DESCRIPTION_10-13-2025_SUBJECT TO CHANGE
(SOUTHSIDE CONNECTOR) TO UNIVERSITY BLVD Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027, TURNER ROAD) AT ROBENA ROAD Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028, 426964-2 $7,018,324 446121-1 - SR15(US17) @ SR134(TIMUQUANA RD) INTERSECTION Type of Work: TRAFFIC, ) @ JTB INTERSECTION Type of Work: RIGHT OF WAY ACTIVITIES Phase Funding Source 2027 2028 2029 2030, Highways 447124-3 - UNIVERSITY BOULEVARD COMPLETE STREETS PROJECT Type of Work: INTERSECTION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-description/duval-county_twp2027-2031-wpph_by-description_10-13-2025_subject-to-change.pdf?sfvrsn=54ca7dca_1Historical Item Averages Market Area 01
SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 13 $24.76 $504,594.38 20,376.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 23 $.85 $23,037.23 27,182.000 ED N TYPE, 4.000 EA N ITSFM LOCATION DOCUMENTATION- INTERSECTION 0611 2 2 3 $3,857.14 $54,000.00 14.000 EA N, INTERSECTION, FURNISH & INSTALL 0632 7 2 1 $27.00 $10,260.00 380.000 LF N SIGNAL CABLE- REPAIR/REPLACE, $910.13 $5,460.80 6.000 PI N SIGNAL CABLE, REMOVE- INTERSECTION 0633 1121 2 $6.06 $45,534.00
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-01.pdf?sfvrsn=d3643e0d_5