2709 search results for apl
9710104-122resp
be conducted using the bead requirements identified in 710, 711, 709, 713, and 971? The APL approved, to review. Response: 1. Any material currently on the APL will not need to be retested using the NTPEP, ) SUBARTICLE 971-1.4 is deleted and the following substituted: 971-1.4 Approved Product List (APL, Product List (APL). Manufacturers seeking evaluation of their product shall submit an application, may be placed on the APL. When listed, this will be the minimum criteria for application
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/comments-responses/9710104-122resp.pdf?sfvrsn=a731b128_41-BABA Implementation Plan- Construction Academy, May 2024
.) Aggregates and Binders (exempt: Wet Concrete, A sphalt) Te mporary Items (BABA exempt, APL listed per, Specific: field collection of required documentation Mass Produced: APL will begin collecting documentation, as noted APL: Manufacturer supplied information collected by Product Evaluation, prior, (Product Application Tracking and History): A pplication, also known as the APL (Approved Product List, - Overview Everyone uses either the APL or MAC System Engineer •Not responsible for project level
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/1-baba-implementation-plan--construction-academy-may-2024.pdf?sfvrsn=ceb4fb36_10060103.impl
certifications for all products listed on the Approved Product List (APL) and when required by the applicable, not accompanied by a manufacturer certification. Manufacturers may obtain sample APL certification forms, Evaluation Section in the State Specifications and Estimates Office maintains the APL. This list, the Contractor’s use of products and materials that require use of APL items to those listed on the APL, ) will be synonymous with the APL in all Contract Documents. Manufacturers s e e k i n g t o h a v e a p r o d u c t e
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/0060103.impl.pdf?sfvrsn=f4fdc337_00060103.origind
? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, be received prior to the devices and materials being posted to the Approved Products List (APL, : The Product Evaluation Section in the State Specifications and Estimates Office maintains the APL, the Contractor’s use of products and materials that require use of APL items to those listed on the APL effective at the time of placement. References to the Qualified Products List (QPL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/0060103.origind.pdf?sfvrsn=41952c19_05230200int
: VERIFIED Summary: 523-2: Added APL/BABA formatting to materials article. 523-3: Removed certification; all manufacturer's certifications are submitted through the APL. Installation compliance does not need a separate certification. Justification: APL/BABA changes are to help with compliance, , and fostering talent; explain how? APL/BABA formatting changes help to ensure compliance, . How does this change improve efficiency or quality? APL/BABA format changes help Construction
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/5230200int.pdf?sfvrsn=95cda7b1_1InternalCommentResponse9901301
Specification Section 990 Subarticle 990-13 ORIGINATION Date: 6-18-24 Name: Olivia Townsend Email: olivia.townsend@dot.state.fl.us COMMENTARY MUTCD Section 6K.06 Drums does not define the predominate color. This opens the potential for other colored body drums (pink, blue, etc.) to be approved on the APL and used on FDOT projects as long as the sheeting is white and orange. INTERNAL, listed on the APL. Your suggestion to modify the Standard Plans has been forwarded to the Standard
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/internal/comments-responses/internalcommentresponse9901301.pdf?sfvrsn=c601a938_16600100-723resp
that can be used as part of a video detection system and APL approval is based on the requirements, plans to update the APL by removing the product type “Vehicle Detector – Thermal” and moving products
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/6600100-723resp.pdf?sfvrsn=4eb81507_29910102-122resp
) 414-4353 karen.byram@dot.state.fl.us Comments: (5-13-21, Internal) The APL approved manufacturers, to the APL or Product Evaluation. Thank you for the opportunity to review. Response: Thank you
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/comments-responses/9910102-122resp.pdf?sfvrsn=812bab3b_25270100-122comm
listed on the current APL…please confirm that the Department lists a Detectable Warning Surface that can be placed directly on an asphalt surface. Review of the current APL indicates – Install
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/comments-responses/5270100-122comm.pdf?sfvrsn=c05d7dc0_27000102-2.resp
to be deleted for Retroreflective Strips, are/will these strips be included in the APL? Response: (6-11-2018) Retroreflective sheeting is on the APL. No change made
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/7000102-2.resp.pdf?sfvrsn=b1924ba6_01020906.origind
involve APL changes? Yes No Product Evaluation staff contacted (name): Will the proposed revision, the NCHRP Report 350 TL-3 criteria or MASH TL-3 criteria and be listed on the APL. Barriers meeting, on the APL will not be accepted as an alternate to barriers meeting the requirements of Design, criteria and be listed on the APL. Trailer mounted barriers listed on the APL may be used at the option of the Contractor. Trailer mounted barriers listed on the APL must have an FHWA eligibility letter
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/internal/1020906.origind.pdf?sfvrsn=91bb73e3_06710000.comm2
listed on the Department’s Approved Product List (APL). Ensure equipment is permanently marked, on the Department’s Approved Product List (APL). Ensure equipment is permanently marked, to the APL Approval Process for Transportation Devices, a product must successfully be tested for compliance with the referenced applicable Supplemental Specifications before it is listed on the APL. This statement is redundant and inconsistent with the manner the Standard Specs addresses APL use
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6710000.comm2.pdf?sfvrsn=6b296174_09920102.comm
9920102 HIGHWAY LIGHTING MATERIALS COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram 414-4353 karen.byram@dot.state.fl.us Comments: (5-31-17, Internal) This change has the potential to affect currently approved APL products. This has not been discussed with Product Evaluation at this time so I d o not know the extent of the affects. Response, luminaries shall be one of the products listed in the Department’s Approved Product List (APL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/9920102.comm.pdf?sfvrsn=4287ae44_04530200.impl
453 EPOXYJOINTINGOFPRECASTSEGMENTS. (REV10-14-15)(FA1-11-16)(7-16) ARTICLE453-2isdeletedandthefollowingsubstituted: 453-2AcceptanceofEpoxyBondingSystem. Useonlyepoxysystems that are on the Department’s Approved Product List (APL). Manufacturers seeking evaluation of their products must submit an application conforming to the requirements of Section 6. Submit to the Engineer, manufactured lot meets the requirements of this Section and is the same as the material listed on the APL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/4530200.impl.pdf?sfvrsn=cd148227_00060103-2.resp
will limit the Contractor’s use of products and materials that require use of APL items to those listed on the APL effective at the time of placement.’ So the removal of the statement is to eliminate, by the Specifications, Design Standards, and APL approved process. Unless defined otherwise, Standards, and APL approved process. Required test reports ……… Response: This is not what, Standards, or APL approval process requirements, The changes were made to incorporate modifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/0060103-2.resp.pdf?sfvrsn=e1951df_06600202 InternalCommentResponse
Specification Section 660 Subarticle 660-2 ORIGINATION Date: 6-18-24 Name: Ronald Meyer Email: Ronald.Meyer@dot.state.fl.us COMMENTARY Need a way to differentiate functional capabilities of certain vehicle detection systems on the APL. Warranty language needs to be updated for consistency with other sections and to remove unnecessary internal cross reference re: final acceptance. INTERNAL COMMENTS AND RESPONSES BLACK = Comment BLUE = Specifications Response GREEN = Change Made
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/internal/comments-responses/6600202-internalcommentresponse.pdf?sfvrsn=30c859bd_11040400-722.D0C1impl
(APL) meeting the requirements of Section 985
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/1040400-722-d0c1impl.pdf?sfvrsn=15e26eb1_29310203-722comm
9310203 Metal Accessory Materials for Concrete Pavement and Concrete Structures COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram Work Phone: 850-414-4353 E-Mail: karen.byram@dot.state.fl.us Comments: (Industry 11-23-21) Section 931-3.1 does not contain the necessary information to submit an application to the APL. I recommend that the second paragraph be deleted and the following language be added in its place: 'Manufacturers seeking evaluation of their product shall submit
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/9310203-722comm.pdf?sfvrsn=65e569b1_26460000-722resp
6460000 ALUMINUM POLES, PEDESTALS, AND POLES COMMENTS FROM INTERNAL/INDUSTRY REVIEW Sarah Smith (850) 414-4776 Sarah.smith@dot.state.fl.us Comments: (12-7-21, Industry) Why didn't the contract language for the Transformer Base stay in Section 646? Section 965 is for Materials and APL information. Response: The Division II language is written to the Contractor. The transformer base materials requirements above are written to the manufacturer; Section 965 (Division III
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/6460000-722resp.pdf?sfvrsn=cb480152_2