3009 search results for intersection

PublicHearing_HILLSBOROUGH COUNTY_Summary

/ MANGO RD AT W OLD HILLSBOROUGH AVE Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2025, $3,876,361 448506-1 - PALM RIVER RD AT US 41/50TH ST Type of Work: INTERSECTION IMPROVEMENT, : INTERSECTION IMPROVEMENT Phase Funding Source 2025 2026 2027 2028 2029 Preliminary Engineering Federal, AT PALM RIVER ROAD Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2025 2026 2027 2028 2029

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d7wpph/publichearing_hillsborough-county_summary.pdf?sfvrsn=6175972b_1

District 5 Letting and Project Information

Intersection Improvement E58B9 Marion, Sumter Dynamic Message Sign Deployment 1 E5X44 Marion BDIUnpaved

https://www.fdot.gov/contracts/district-offices/d5/lettings/2023/2023-district-five-letting-and-project-information

D5-03-05-24BSN

to 2.097) intersection in Seminole County. BUSINESS DEVELOPMENT INITIATIVE -- Bidders must be a "Small, MESSAGE SIGN, TEMPORARY ED 606.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 230.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 230.000, , F&I, TYPE P-V EA 5.000 0670- 4- 1 INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY, FURNISH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/mar05/d5-03-05-24bsn.pdf?sfvrsn=fa12c65d_3

D3-05-09-24BSN

0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 960.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 960.000 0102-913- 12 REMOVABLE TAPE, BLACK, 10, 876.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 3.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI 3.000 0635- 2- 11 PULL & SPLICE BOX, F&I, 13" x 24

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/may09/d3-05-09-24bsn.pdf?sfvrsn=c067cf6f_1

fdot-bdv24-977-36-rpt

as the C3C/C3R. The short block consisted of a crosswalk followed by an intersection 500 ft away, the intersection. The differences of the speed reduction for each speed limit are shown in the figures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv24-977-36-rpt.pdf?sfvrsn=ec499fea_5

521-630

details of the intersection of the retaining 9. Finish Sidewalks in accordance with Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/521-630.pdf?sfvrsn=43b14944_1

649-010

" (Min.) 9" ¡ Pole (See Sheet 3) Handhole Intersection not Shown Clamps for Cables at 3 1 649-010

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/649-010.pdf?sfvrsn=16fb9451_1
20 of 3009 results