3001 search results for ENGINEERING - REQUEST

4150000.comm

: ****************************************************************************** Wendy McLellan (via Deborah Ihsan) Creative Engineering 561-373-0787 Comments: (12-17-15) 415-3.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/4150000.comm.pdf?sfvrsn=675991c8_0

1100000.comm

 1100000 CLEARING AND GRUBBING COMMENTS FROM INTERNAL/INDUSTRY REVIEW Denise J. Broom CADD Support Specialist FDOT Engineering/CADD Systems Office 605 Suwannee Street, Mail Station 69 Tallahassee, FL 32399-0450 Phone: (850) 414-4751 Toll Free: (866) 374-3368 Extension 1600 e-mail: denise.broom@dot.state.fl.us web: http://www.dot.state.fl.us/ecso Comments: (12-9-15) Under 110-11.4 it starts out with a statement regarding the payment of flexible payment. The proposed language

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/1100000.comm.pdf?sfvrsn=500a2f0a_0

9600000.resp2

 No changes were made in response to these comments. 08/06/2015 Industry Review of Specification 960 – ETAG 013 Requirement Edgar Zuniga, DSI Director of Project Engineering, edgar.zuniga@dsiamerica.com 1 Specification: 960‐2.1(5) Anchorage Assembly Comment: I am of the opinion that it would be better to require all testing, including fatigue, to be done by either LRFD or ETAG‐013 specs. That way not only anchorages and couplers tested as per ETAG‐013 that meet LRFD requirements would

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/9600000.resp2.pdf?sfvrsn=529913df_0

6700000.FHWA

of the State Traffic Engineering and Operations Office to consolidate material requirements from the Minimum

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/6700000.fhwa.pdf?sfvrsn=23c793ed_0

0050104-723origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Office: Originator: Specification Section: Telephone: Article/Subarticle: email: Associated Section(s) Revisions: Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/0050104-723origind.pdf?sfvrsn=6d932b5_1

4551604-723FHWA

an engineering analysis. 455-17.6.1.5 Coring and/or Repair of Drilled Shafts: If the Engineer determines, . Drilled shafts with velocity reduction exceeding 30% are not acceptable without an engineering, , are not acceptable without an engineering analysis. 455-17.6.1.5 Coring and/or Repair of Drilled Shafts, without an engineering analysis. 455-17.6.2.3 Coring and/or Repair of Drilled Shafts

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/4551604-723fhwa.pdf?sfvrsn=64c281fb_1
20 of 3001 results
Top