3165 search results for intersection

D3-07-11-24BSN

- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 150.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 150.000 0102-115- TYPE III BARRICADE ED 320.000 0102-150, - PROJECT LENGTH MI 5.670 0611- 2- 1 ITSFM LOCATION DOCUMENTATION- INTERSECTION EA 1.000 0630- 2- 12, OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jul11/d3-07-11-24bsn.pdf?sfvrsn=e50fdbe3_1

D4-07-12-24BSN

MESSAGE SIGN, TEMPORARY ED 179.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 1,080.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 1,080.000, LF 2,002.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI, MESSAGE SIGN, TEMPORARY ED 411.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 740.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 740.000 0102-115

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/jul12/d4-07-12-24bsn.pdf?sfvrsn=a981f010_1

PublicHearing_VOLUSIA COUNTY_Summary_2025-2029

AT THE INTERSECTION OF LOCKHART ST Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM Phase Funding Source, 449235-1 - SR 600 / US 17-92 AND ENTERPRISE RD INTERSECTION Type of Work: INTERSECTION IMPROVEMENT Phase, 449235-1 $1,874,244 449469-1 - LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION Type of Work: TRAFFIC, LOCATIONS Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2025 2026 2027 2028 2029

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_volusia-county_summary_2025-2029.pdf?sfvrsn=cbf27b44_1

D1-07-17-25BSN

, TEMPORARY ED 342.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 200.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 200.000 0104- 10- 3 SEDIMENT, LF 217.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1.000, AND MAINTENANCE, INTERSECTION ED 300.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 300.000 0102-115- TYPE III BARRICADE ED 200.000 0102-913- 21 REMOVABLE TAPE, WHITE, SOLID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/jul17/d1-07-17-25bsn.pdf?sfvrsn=e39e6424_1

44728715201-PLANS-03-SIGNALIZATION

) & FRANCISCO ST INTERSECTION Vehicles Watch For START CROSSING If Started Finish Crossing DON'T, 646 647 645 10 40 Feet 0 N SR 25/80 (US 27) & SAN PEDRO ST INTERSECTION 4 4 2 2 6 6 8, A V E SR 25/80 (US 27) & ROYAL PALM AVE INTERSECTION 10 40 Feet 0 N £ SURVEY 6 6 8 8 2, (US 27) & W C OWEN AVE INTERSECTION Vehicles Watch For START CROSSING If Started Finish, LINE C I R C L E D R O L Y M P I A S T SR 25/80 (US 27) & CIRCLE DR INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44728715201-plans-03-signalization5a9325a4-504c-46d8-ace2-5c6944043463.pdf?sfvrsn=d026d9f3_1

Historical Item Averages Market Area 06

0102104 12 $41.09 $739,862.50 18,005.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION, , INTERSECTION 0102112 1 $231.00 $200,970.00 870.000 DA N EXISTING ITS MAINTENANCE 0102115 9 $.28 $15,655.78, 0611 2 1 5 $2,393.52 $21,541.71 9.000 EA N ITSFM LOCATION DOCUMENTATION- INTERSECTION 0611 2 2 2, PI N SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 0632 7 2 1 $12.00 $2,724.00, 8.000 PI N SIGNAL CABLE, REMOVE- INTERSECTION 0633 1121 3 $4.27 $14,831.05 3,470.000 LF N FIBER

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-06.pdf?sfvrsn=cd5bdb12_5

TWO8_SR 856 Lehman Causeway Technical Memorandum 4.1.24_FINAL

, and the intersections allowing access to the causeway. Of the 420 crashes only six were found, on the shoulders or ramps of the causeway, while the other 6 occurred on the auxiliary roads or intersections, the Biscayne Blvd intersection a pedestrian attempted to cross the causeway and walked into the path, occurred on the shoulders or roadway of the causeway, while the other 8 occurred at intersection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/25609/two8_sr-856-lehman-causeway-technical-memorandum-4-1-24_final.pdf?sfvrsn=90fcc398_1

FGB Agenda - April 2023 Meeting Package

intersect FDOT roadways - unless they "exempt" the FDOT intersection, they require their entire project, Chapter 3 - Geometric Design  Better guidance on roundabouts or alternative intersections  Border, Length • Block Perimeter • Intersection Density • Development Form and Intensity • Building

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/fgb-agenda---april-2023-meeting-package.pdf?sfvrsn=b001ef0_1

BCR_South_EA_07-17-2024

at the intersections along the route • In coordination with the City of Hollywood and Broward County Traffic, intersection. Pedestrian connectivity between parking and the station is included as part, existing sidewalk repairs or reconstruction along the route and ADA ramps at the intersections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/bcr_south_ea_07-17-2024.pdf?sfvrsn=d94477b_1

441700-1_COVE_ROAD_NSR

intersections within the project limits are located at Kanner Highway, Atlantic Ridge, Legacy Cove, will be determined, and the addition of roadway lighting will be considered. Intersection, . There are no existing bike lanes or shared-use paths within the project limits. Signalized intersections within, , and the addition of roadway lighting will be considered. Intersection improvements within

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1_cove_road_nsr.pdf?sfvrsn=c6e0dc59_1

9950100-722FHWA

to light impulses generated from a visible or infrared light source. 995-8.5 Intersection Radio, F3125, Grade A325. Enclosures must have a NEMA 4X rating. Pushbutton housings for intersections must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/9950100-722fhwa.pdf?sfvrsn=20bfa2da_2

April Meeting Package

The fourth discussion point was intersection design. There was a request for clarification on ADA, at intersections. Ms. Musselman stated that District 7 has had a manual in draft form related, improvements in intersection treatments in the FDM and suggested incorporating some of those, there is little existing guidance for protected intersections. It’s still a developing area. She offered

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/april-meeting-package.pdf?sfvrsn=d7545289_2

OOM_20250717_MRPHandbook2025

repair, turnout/turn storage installation, intersection upgrade, utility work*) may be surveyed, -line diagram to determine the SLD milepost of the nearest roadway feature (bridge, intersection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/rdw/mrp/oom_20250717_mrphandbook2025.pdf?sfvrsn=8757fe4b_1

9950100-722impl

light source. 995-8.5 Intersection Radio/GPS Modules: Radio/GPS preemption systems must include, , Grade A325. Enclosures must have a NEMA 4X rating. Pushbutton housings for intersections must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/9950100-722impl.pdf?sfvrsn=4ee62e95_2

9950100-722origind

light source. 995-8.5 Intersection Radio/GPS Modules: Radio/GPS preemption systems must include, . Pushbutton housings for intersections must be black. 995-9.7 Environmental: Ensure equipment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/9950100-722origind.pdf?sfvrsn=9ae62014_2

4500100.origind

of welded wire reinforcement covers an area of four intersections of transverse and longitudinal bars, intersection. Either 4500100 All Jobs tie or lace spirals wire in piling at all four corners in the 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/4500100.origind.pdf?sfvrsn=6ec1feb3_0

4500100.impl

reinforcement covers an area of four intersections of transverse and longitudinal bars. Ensure, , at every other intersection. Either tie or lace spirals in piling at all four corners in the 1 inch

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/4500100.impl.pdf?sfvrsn=cd6ef348_0

449122-1 PH IV ERC Comments

Rima 6/9/2025 1 For all intersections where new Traffic Signal Mast Arms are being constructed, or Michael Rima at the DSMO to have a new structure number assigned to the intersection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26121/449122-1-ph-iv-erc-comments.pdf?sfvrsn=db832393_1
20 of 3165 results