Research Projects
| Document Name | Description | Date | ||
| Coastal Engineering | ||||
| DB-545-42 - Final Report | Design Hurricane Storm Surge and wave hindcasting Pilot Study-Sheppard-Slinn-Hagen | 12/31/06 | ||
| Storm Surge Hydrographs | Open Coast Storm Surge Hydrographs for Florida’s Coastline Problem Statement Sheppard | - - | ||
| Wind Generated Currents | Wind Generated Currents in Shallow Water | - - | ||
| Complex Pier Scour | ||||
| Complex Pier Report | Methodology for Estimating Local Scour Depths at Complex Piers Final Report Sheppard | 03/2003 | ||
| DB545-34 - Final Report | Improvements in Design Scour Depth Prediction – Final Report - Sheppard | 12/2006 | ||
| Pier Scour | ||||
| No Reports | - - | - - | ||
| Pipe Research | ||||
| Soil Box DB-530 - Final Report | Load Response Comparison Between Fiber and Steel Reinforced Concrete Pipe – Phase Two Bloomquist / Chen | 02/2009 | ||
| Rock Scour | ||||
| BC354-12 RETA-SERF -FinalReport | Design and Construction of Apparatus for Measuring Rate of Water Erosion of Sediments - Sheppard / Bloomquist | 06/2005 | ||
| BD545-03 - Final Report | Correlation of Erosion Rate-Shear Stress Relationships with Geotechnical Properties of Rock and Cohesive Sediments - Sheppard / Bloomquist / Slagle | 12/2006 | ||
| I10-Chipola River - Final Report | January 2019 Drainage ManualRock Scour Analysis for the I-10 Bridge Crossing of the Chipola River - OEA, Inc. | 12/2001 | ||
| Rate and Properties of Rock Erosion | Research Proposal / Rate of Erosion Properties of Rock and Clay - Sheppard / Bloomquist | 04/2003 | ||
| Rate and Properties of Rock Erosion | Research Proposal / Rate of Erosion Properties of Rock and Clay - Sheppard / Bloomquist | 01/2002 | ||
| Stormwater | ||||
| Highway EMCs in District 1 | Highway EMC Values | 08/2010 | ||
| Rural Roadway EMCs | Event Mean Concentrations of Stormwater Runoff from Rural Roadways in Florida | 09/2016 | ||
| Stormwater Management Academy | University of Central Florida - Environmental Research | - - | ||
| BD521-03 - Final Report | Final Report on Hydraulic Performance Assessment of Pervious Concrete Pavements for Stormwater Management Credit - Wanielista / Chopra | 06/2007 | ||
| 1 of 4 Performance Assessment and Credit | Final Report on Hydraulic Performance Assessment of Pervious Concrete Pavements for Stormwater Management Credit - Wanielista / Chopra | 12/10/15 | ||
| 2 of 4 Construction and Maintenance | Final Report on Construction and Maintenance Assessment of Pervious Concrete Pavements - Wanielista / Chopra | 06/2007 | ||
| 3 of 4 Pervious Concrete Strength | Final Report on Compressive Strength of Pervious Concrete Pavements - Wanielista / Chopra | 06/2007 | ||
| 4 of 4 Field Test of Rest Area Shoulder | Final Report on Performance Assessment of a Pervious Concrete Pavement Used as a Shoulder for an Interstate Rest Area Parking Lot - Wanielista / Chopra | 06/2007 | ||
| WekivaStudy-1-2004.pdf | Wekiva Area Water Budget - Wanielista, et.al | 01/2004 | ||