Design Build Projects
Design Build Ads
Design Build Selections
Planned Project Link
Online Ordering
Design Build Selections
Planned Project Link
Online Ordering
Contract Number | Description | Schedule of Events | Addenda | Other Information |
E21F5 | Drainage | Schedule Of Events | 1, 2 | |
E21A0 | Drainage, Flexible Paving, Grading ,Hot Plant-Mixed Bituminous Courses | Schedule of Events | ||
E200Z | Grading, Flexible Paving, Hot Plant-Mixed Bituminous Courses, Intermediate Bridges | Schedule of Events | 1, 2, 3, 4, 5 | |
E20X8 | Hot Plant-Mixed Bituminous Courses | Schedule of Events | 1, 2 | |
E20X9 | Hot Plant-Mixed Bituminous Courses | Schedule of Events | 1, 2, 3 | |
E200J | SR 26 from Oaks Mall to SE 9th Street | Schedule of Events | 1 | RFP |
E20Y7 Adjusted Score Design-Build | I-95 from SR 152 (Baymeadows Rd) to SR 10 (Atlantic Blvd) | WITHDRAWN | ||
E20U6 Adjusted Score Design-Build | First Coast Expressway (SR 23) from I-95 (SR 9) to East of CR 16A Spur | Schedule of Events | WITHDRAWN | |
E20S3 Low Bid Design-Build | SR 5 (US 1) from SR 152 (Baymeadows Rd.) to CR 116 (Sunbeam Rd.) SR 5 (US 1) from north of Alternate CR 210 to Race Track Rd | Schedule of Events | 1, 2 | |
E20T0 Low Bid Design-Build | SR 26 from Oaks Mall to SE 9th Street | Schedule of Events | WITHDRAWN | |
E20S0 Low Bid Design-Build | SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252 | Schedule of Events | ||
E20S1 Low Bid Design-Build | SR 20 (US 27) from the Alachua County Line to the Suwannee County Line | Schedule of Events | 1, 2 | |
E20S2 Low Bid Design-Build | SR 10 (US 90) from East of Greenville to Madison | Schedule of Events | 1 | |
E20J4 | I-95 from SR 152 (Baymeadows Rd.) to SR 10 (Atlantic Blvd.) | Schedule of Events | WITHDRAWN | |
E20F8 Adjusted Score Design-Build | First Coast Expressway (SR 23) from East of CR 16A Spur to East of CR 209 | Schedule of Events | 1, 2, 3, 4, 5, 6, 7, 8 |
If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.