EMERGENCY INFORMATION FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts.

Construction

Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo, but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.

 DCE Memo's 2015
01-15Separation Technologies - Big Bend, Apollo Beach FLY ASH (FA30)
02-15Revisions To Specification Section 346 - Portland Cement Concrete
03-15Emulsions Now Listed on Approved Products List (*.pdf, 315kb)
05-15Revisions To Specification Section 346 - Portland Cement Concrete
06-15Revisions To Materials Manual Volume II Section 9.2 - Substitutions of Materials - Fly Ash
07-15PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA) (*.pdf, 80kb)
08-15St Johns River Power Park Fly Ash-Jacksonville (FA17) Revised 4/27/15
09-15Mass Concrete
10-15Amendment To The Construction Engineering And Inspection Scope Of Services For Hybrid Contracts
11-15Pile Installation Plan - Test Program and Production Pile Schedule
12-15Windrow Paving - Specification Changes To Section 330 - Hot Mix Asphalt - General Construction Requirements
13-15Materials Acceptance and Certification System Implementation, Company Profile Training (*.pdf, 938kb)
14-15MAC Implementation & Contractor QC Plans (*.pdf, 397kb)
15-15Acceptance Test For Dynamic Message Signs
16-15Removal of the Requirement for Endorsements
18-15Manufacturers' Warranties
19-15Eliminating Arithmetic Mean
20-15Revisions To Specification Section 353 - Concrete Pavement Slab Replacement
21-15W-Beam Guardrail Panels
22-15Implementation of Vacuum Drying for Density of Cores (*.pdf, 370kb)
23-15MAC Company Profile (*.pdf, 825kb)
24-15Design Standard Index 17727