EMERGENCY INFORMATION FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts.

Construction

Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo,
but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.
 DCE Memo's 2009
20-09Testing of Elastomeric Bearing Pads for Bridge Structures
19-09Implementation of a Mandatory "Critical Structures Construction Issues - Self Study Course"
18-09Technical Considerations for Flexible Pipe Selection and Substitution
17-09Correction to SP0060100LS - Specification Workbook 2010
16-09Hurricane Impacts to Construction Projects
15-09Correction to Design Standards Index 5205
14-09Mandatory Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations
13-09Qualified Products for Materials for Concrete Repair
12-09Centrifugally Spun Cast Concrete Poles
11-09Specification Changes for Section 330; Hot Bituminous Mixtures - General Construction Requirements
10-09Clarification of Specification 455-16.2 & 455-20(d)
09-09Making Revisions to Contractor Quality Control Plans
08-09Asphalt Recycle Agents
07-09New Requirements for Superpave Gyratory Compactor
06-09Change in Federal Law Regarding Submission of Certified Payrolls
05-09FM 1-T 166 Revisions
04-09Changes to Material IDs for Aggregate Base
03-09Warm Mix Asphalt
02-09Clarification Regarding Requirements for Motor Vehicle Registration & Certification
01-09Specification Change for Coarse Aggregate - Maximum Percent Passing the Minus 200 Sieve