Welcome

The Florida Department of Transportation (FDOT) has initiated a Project Development and Environment (PD&E) Study along SR 9/I-95 from SW 10th Street to Hillsboro Boulevard. The purpose of the project is to eliminate various existing operational and safety deficiencies along I-95 between and including the interchanges at SW 10th Street and Hillsboro Boulevard, and also on SW 10th Street and Hillsboro Boulevard in the vicinity of I-95.

The primary need for the project is based on capacity/operational and safety issues, with secondary considerations for the needs of evacuation and emergency services, transportation demand, system linkage, modal interrelationships, and social demands and economic development. As part of the state’s Strategic Intermodal System (SIS) and the National Highway System (NHS), I-95 is a critical asset for moving people and goods and provides limited access connectivity to other major arterials such as I-595 and Florida's Turnpike.

Study At-A-Glance

State Road 9 Project Map

District
Four

Start Date
June 2016

Study Estimated Completion Date
Early 2019

Estimated Construction Cost
TBD

Lengths and Limits
From SW 10th Street to Hillsboro Boulevard

Consultant
HNTB

Design Project Manager
Anson Sonnett
954-777-4474
Toll Free 866-336-8435, ext 4474
or email: anson.sonnett@dot.state.fl.us