Implemented Modifications to the 2015 Standard Specifications

July 2015 Workbook

for Lettings Effective July - December 2015


Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

 

Supplemental Specifications - Additions or revisions to the Standard Specifications.

 

History of Revisions - To review the History of revisions for this Workbook.

 

Mandatory Revisions - Critical modifications implemented for the Workbook.
Mandatory Revision #5 - To review the implementation letter.
Mandatory Revision #4 - To review the implementation letter.
Mandatory Revision #3 - To review the implementation letter.
Mandatory Revision #2 - To review the implementation letter.
Mandatory Revision #1 - To review the implementation letter.

 

Workbook Document - Final - To review the changes to the Workbook.
Workbook Document - Draft - To review the Workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 200 kb.

SPECIAL PROVISIONSSP0000001Usage Note
PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK.
(REV 2-19-14) (FA 2-20-14) (7-15)

Insert Information Required.
Change(s) to: 2-4.
SP0020400All Jobs (add a phone number or email address)
PREPARATION OF PROPOSALS.
(REV 6-22-04) (FA 7-13-04) (7-15)

Change(s) to: 2-5.1.
SP0020501ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB,SP0080701AB and SP0081300AB.
PREPARATION OF PROPOSALS.
(REV 2-21-05) (FA 3-31-05) (7-15)

Insert Information Required.
Change(s) to: 2-5.1.
SP0020501LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 4-23-13) (FA 5-14-13) (7-15)

Change(s) to: 3-1.
SP0030100Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-15)

Insert Information Required
Change(s) to: 3-1.
SP0030100ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
 
BUDGETARY CONSTRAINTS.
(REV 9-26-06) (FA 10-6-06) (7-15)

Insert Information Required
Change(s) to: 3-1.
SP0030100BCUse at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-15)

Change(s) to: 3-1.
SP0030100LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (7-15)

Change(s) to: 3-1.
SP0030100LSLump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (7-15)

Insert Information Required
Change(s) to: 3-2, 3-6, 3-7.
SP0030200When necessary to change standard “Award and Execution”.
*Contracts Office must approve.
AWARD OF CONTRACTS - A+B BIDDING
(REV 8-22-96) (FA 9-3-96) (7-15)

Insert Information Required
Change(s) to: 3-2.
SP0030203ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB.
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (7-15)

Insert Information Required.
Change(s) to: 4-1.
SP0040100All Jobs, excluding Lump Sum.
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 2-16-15) (FA 2-27-15) (7-15)

Insert Information Required.
Change(s) to: 4-1.
SP0040100ESJobs with electronic submittal of documents, excluding Lump Sum. Use with the approval of the District Construction Engineer.
Do not use with SP0040100.
Mandatory No. 1.
SCOPE OF THE WORK.
(REV 8-24-10) (FA 10-8-10) (7-15)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100LSLump Sum Projects
SCOPE OF THE WORK.
(REV 8-4-15) (FA 8-18-15) (9-15)

Insert Information Required.
Change(s) to: 4-1.
SP0040100LSESLump Sum Projects with electronic submittal of documents. Use with the approval of the District Construction Engineer.
Do not use with SP0040100LS
Mandatory No. 5.
UNFORESEEABLE WORK.
(REV 9-28-98) (7-15)

Change(s) to: 4-4.
SP0040400999-25
CONTROL OF THE WORK.
(REV 3-15-02) (7-15)

Change(s) to: 5-1.1, 5-2, 5-7.6.
SP0050101LSLump Sum Projects
INSPECTION.
(REV 2-10-94) (7-15)


Change(s) to: 5-9.1
SP0050901Long bridge jobs (1500 feet or longer); modify to suit.
CONTROL OF MATERIALS.
(REV 8-17-09) (FA 8-24-09) (7-15)

Change(s) to: 6-1.
SP0060100LSLump Sum Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - COMPLIANCE WITH FHWA 1273.
(REV 1-2-14) (1-16-14) (7-15)
Change(s) to: 7-1.1.
SP0070101All Federal Aid Jobs
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (FA 4-14-05) (7-15)

Change(s) to: 7-2.1.
SP0070201AJobs with permits procured by DOT
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 7-16-09) (FA 7-30-09) (7-15)

Change(s) to: 7-2.2.
SP0070202When SWPPP is used. (One or more acres disturbed.)
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - TOLL FACILITIES.
(REV 7-22-14) (FA 10-15-14) (7-15)

Change(s) to: 7-11.1, 7-11.2.
SP0071101-TollsUse with the approval of the District Traffic Operations Engineer.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 11-5-10) (FA 11-9-10) (7-15)

Change(s) to: 7-11.4.
SP0071104Projects Involving CSX Transportation.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 2-27-15) (FA 3-13-15) (7-15)

Change(s) to: 7-11.5.
SP0071104FECProjects Involving FEC Transportation.
Mandatory No. 1
UTILITY WORK.
(REV 2-10-94) (7-15)

Change(s) to: 7-11.5.3.
SP0071153AWhen there are no utility work schedules.
UTILITY SCHEDULES.
(REV 8-27-01) (FA 4-14-05) (7-15)

Change(s) to: 7-11.5.3.
SP0071153BWhen there are utility work schedules.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 10-15-14) (FA 10-20-14) (7-15)

Insert Information Required.
Change(s) to: 7-16.
SP0071600All Federal Aid Jobs
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (7-15)

Change(s) to: Section 7-26.
SP0072600Non-Federal Aid Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (7-15)

Change(s) to: Section 7.
SP0072700Non-Federal Aid Projects - Construction Projects Only
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (7-15)

Change(s) to: Section 7.
SP0072800All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 6-17-11) (7-15)

Change(s) to: Section 7.
SP0072900All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A.
(REV 11-12-13) (FA 11-26-13) (7-15)

Change(s) to: Section 7.
SP0073000All Federally Funded Jobs
PROSECUTION AND PROGRESS - SUBMISSION OF WORKING SCHEDULE.
(REV 11-13-14) (FA 1-22-15) (7-15)

Change(s) to: 8-3.2.
SP0080302AUse only when CPM is authorized by District Construction Engineer.
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 2-15-10) (FA 2-17-10) (7-15)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303AWhen called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
BEGINNING WORK.
(REV 7-10-95) (7-15)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303BWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
BEGINNING WORK.
(REV 10-22-98) (11-5-98) (7-15)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080303CWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (7-15)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080306999-16
*Contracts Office must be notified.
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-15)

Change(s) to: 8-3.
SP0080307DRB999-20 Items
*Contracts Office must be notified.
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-15)

Change(s) to: 8-3.
SP0080307RDRBJobs without 999-20 Items
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-15)

Change(s) to: 8-3.
SP0080308SDRB334, 337, 350, 570, 580 or 649 Items
PROSECUTION AND PROGRESS.
(REV 8-1-00) (7-15)

Change(s) to: 8-4.1, 8-7.3.1.
SP0080401LSLump Sum Projects
LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (7-15)

Change(s) to: 8-4.8.
SP0080408Jobs on Limited Access Highways
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-15)

Insert Information Required.
Change(s) to: 8-4.9.
SP0080409Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (7-15)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701AUse with approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (7-15)

Change(s) to: 8-7.1.
SP0080701ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB.
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (7-15)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701BUse with the approval of the Chief Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (7-15)

Change(s) to: 8-7.1.
SP0080701CUse when requested by the District Construction Engineer.
DAMAGE RECOVERY.
(REV 2-4-04) (7-15)

Insert Information Required.
Change(s) to: Section 8.
SP0081300Use when requested by the District Construction Engineer. (Do not use with Lane Rental)
PROSECUTION AND PROGRESS.
(REV 7-28-97) (7-15)

Change(s) to: Section 8.
SP0081300AAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABBA+B Jobs with Bonus Use with the approval of the District Construction Engineer.
8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BBonus (Date Specific) Use with the approval of the District Construction Engineer.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BCDBonus (Calendar Days) Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDIncentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDLRIncentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LQSLiquidated Savings. Use with the approval of the District Construction Engineer.
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)

Change(s) to: 8-13.
SP0081300LRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LRDR.
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LRDRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LR.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MBMilestone Bonus Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MIDMilestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
MEASUREMENT AND PAYMENT.
(REV 11-19-14) (FA 1-22-15) (7-15)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.
SP0090103LSLump Sum Projects
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED.
(REV 9-10-07) (FA 2-15-08) (7-15)

Insert Information Required.
Change(s) to: 110-6.1.
SP1100601Use when requested by the District Construction Engineer. Must have signed Agreement from the Local Agency receiving the material.
REMOVAL OF EXISTING STRUCTURES.
(REV 1-29-13) (FA 2-15-13) (7-15)

Change(s) to: 110-6.6.
SP1100606Use when areas of Asbestos Abatement are identified in the Plans.
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (7-15)

Change(s) to: 110-11.2, 110-12.7.
SP1101102110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-29-13) (FA 2-15-13) (7-15)

Change(s) to: 120-1.
SP1200100AUse when contaminated areas are delineated in the Plans.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (7-15)

Insert Information Required.
Change(s) to: 327-1, 327-6.
SP3270100When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (7-15)

Change(s) to: 327-2.
SP3270200Use when requested by districts.
STRUCTURES FOUNDATIONS.
(REV 8-5-15) (7-15)

Change(s) to: 455-5.2, 455-5.8, 455-5.10.1, 455-5.10.2, 455-5.10.3, 455-5.11.1, 455-5.11.2, 455-5.11.7, 455-5.13, 455-7.2, 455-11.5, 455-12.5.
SP4550502455-34 Items
Mandatory No. 4.
INTEGRAL PILE JACKETS.
(REV 11-16-11) (FA 12-8-11) (7-15)

Change(s) to: 457.
SP4570000457 Items
LANDSCAPING.
(REV 1-7-15) (7-15)

Change(s) to: 580.
SP5800000Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
Mandatory No. 1.
LANDSCAPING.
(REV 1-7-15) (FA 3-13-15) (7-15)

Change(s) to: 580.
SP5800000FAAll Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
Mandatory No. 1.
PEDESTRIAN SIGNAL ASSEMBLIES.
(REV 4-5-15) (7-15)

Change(s) to: 653.
SP6530000All Jobs.
Mandatory No. 2.
TRAFFIC MONITORING SITE VEHICLE SENSOR - NON-WEIGHT APPLICATIONS.
(REV 1-3-12) (FA 1-27-12) (7-15)

Change(s) to: 741.
SP7410000741-1 Items
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (7-15)

Change(s) to: 743.
SP7430000743-70 Items
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 10-22-10) (FA 11-22-10) (7-15)

Change(s) to: 744.
SP7440000744-70 Items
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 1-10-13) (FA 1-15-13) (7-15)

Change(s) to: 745.
SP7450000745-70 Items
TRAFFIC MONITORING SITE CABINET.
(REV 5-6-08) (FA 10-14-08) (7-15)

Change(s) to: 746.
SP7460000746-7A-BCD
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (7-15)

Change(s) to: 747.
SP7470000747-70 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (7-15)

Change(s) to: 748.
SP7480000Jobs with Traffic Monitoring Sites.
 
Supplemental SpecificationsSS0000001Usage Note
530  RIPRAP AND ARTICULATING CONCRETE BLOCK REVETMENT SYSTEMS.
(REV 5-29-15) (FA 6-8-15) (7-15)

Changes to: 530-1.2.
SS5300102All Jobs
Mandatory No. 3
546  RUMBLE STRIPS.
(REV 1-30-15) (FA 3-13-15) (7-15)

Changes to: 546.
SS5460000All Jobs
Mandatory No. 1
700  HIGHWAY SIGNING.
(REV 4-1-15) (FA 4-8-15) (7-15)

Changes to: 700-4.5, 700-4.8.4.
SS7000405All Jobs
Mandatory No. 1
701  PROFILED THERMOPLASTIC PAVEMENT MARKINGS.
(REV 2-24-15) (FA 3-13-15) (7-15)

Changes to: 701.
SS7010000All Jobs
Mandatory No. 1
709  TWO REACTIVE COMPONENTS PAVEMENT MARKINGS.
(REV 2-24-15) (FA 3-13-15) (7-15)

Changes to: 709.
SS7090000All Jobs
Mandatory No. 1
710  PAINTED PAVEMENT MARKINGS.
(REV 2-24-15) (FA 3-13-15) (7-15)

Changes to: 710.
SS7100000All Jobs
Mandatory No. 1
711  THERMOPLASTIC PAVEMENT MARKINGS.
(REV 2-24-15) (FA 3-13-15) (7-15)

Changes to: 711.
SS7110000All Jobs
Mandatory No. 1
713  PERMANENT TAPE PAVEMENT MARKINGS.
(REV 2-24-15) (FA 3-13-15) (7-15)

Changes to: 713.
SS7130000All Jobs
Mandatory No. 1
971  PAVEMENT MARKING MATERIALS.
(REV 3-3-15) (FA 3-19-15) (7-15)

Changes to: 971.
SS9710000All Jobs
Mandatory No. 1
 
AppendicesXAPENDICUsage Note
TECHNICAL SPECIAL PROVISIONS.

The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.

 

XTSPsJobs with TSPs