January 2015 Workbook


Implemented Modifications to the 2015 Standard Specifications

January 2015 Workbook

for Lettings Effective January - June 2015


Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

 

Supplemental Specifications - Additions or revisions to the Standard Specifications.

 

History of Revisions - To review the History of revisions for this Workbook.

 

Mandatory Revisions - Critical modifications implemented for the Workbook.
Mandatory Revision #3 - To review the implementation letter.
Mandatory Revision #2 - To review the implementation letter.
Mandatory Revision #1 - To review the implementation letter.

 

Workbook Document - Final - To review the changes to the Workbook.
Workbook Document - Draft - To review the Workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 200 kb.

SPECIAL PROVISIONSSP0000001Usage Note
PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK.
(REV 2-19-14) (FA 2-20-14) (1-15)

Insert Information Required.
Change(s) to: 2-4.
SP0020400All Jobs, (add a phone number or e-mail address)
PREPARATION OF PROPOSALS.
(REV 6-22-04) (FA 7-13-04) (1-15)

Change(s) to: 2-5.1.
SP0020501ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB,SP0080701AB and SP0081300AB
PREPARATION OF PROPOSALS.
(REV 2-21-05) (FA 3-31-05) (1-15)

Insert Information Required.
Change(s) to: 2-5.1.
SP0020501LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR
CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 4-23-13) (FA 5-14-13) (1-15)

Change(s) to: 3-1.
SP0030100Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
Notify Contracts Office on Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (1-15)

Insert Information Required
Change(s) to: 3-1.
SP0030100ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB
BUDGETARY CONSTRAINTS.
(REV 9-26-06) (FA 10-6-06) (1-15)

Insert Information Required
Change(s) to: 3-1.
SP0030100BCUse at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
Notify the Contracts Administration Office on the Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 12-21-12) (1-10-13) (1-15)

Change(s) to: 3-1, 3-2.2, 3-5.1.
SP0030100DCDistrict Let Construction Contracts less than $250,000 and
all Maintenance Contracts, excluding Lump Sum
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (1-15)

Change(s) to: 3-1.
SP0030100LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (1-15)

Change(s) to: 3-1.
SP0030100LSLump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (1-15)

Insert Information Required
Change(s) to: 3-2, 3-6, 3-7.
SP0030200When necessary to change standard “Award and Execution”
Contracts Office must approve.
AWARD OF CONTRACTS - A+B BIDDING
(REV 8-22-96) (FA 9-3-96) (1-15)

Insert Information Required
Change(s) to: 3-2.
SP0030203ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-15)

Insert Information Required.
Change(s) to: 4-1.
SP0040100All Jobs, excluding Lump Sum.
Do not use with SP0040100SLPQ.
SCOPE OF THE WORK.
(REV 8-24-10) (FA 10-8-10) (1-15)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100LSAll Lump Sum Projects.
Do not use with SP0040100SLLS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 8-24-10) FA 10-8-10) (1-15)

Insert Information Required.
Change(s) to: 4-14-3.1, 4-3.4, 4-3.9.4.
SP0040100SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100LS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 9-16-09) (FA 11-9-09) (1-15)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100.
UNFORESEEABLE WORK.
(REV 9-28-98) (1-15)

Change(s) to: 4-4.
SP0040400999-25
CONTROL OF THE WORK.
(REV 3-15-02) (1-15)

Change(s) to: 5-1.1, 5-2, 5-7.6.
SP0050101LSLump Sum Projects
INSPECTION.
(REV 2-10-94) (1-15)


Change(s) to: 5-9.1
SP0050901Long bridge jobs (1500 feet or longer); modify to suit
CONTROL OF MATERIALS.
(REV 8-17-09) (FA 8-24-09) (1-15)

Change(s) to: 6-1.
SP0060100LSLump Sum Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - COMPLIANCE WITH FHWA 1273.
(REV 1-2-14) (1-16-14) (1-15)
Change(s) to: 7-1.1.
SP0070101All Federal Aid Jobs
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (FA 4-14-05) (1-15)

Change(s) to: 7-2.1.
SP0070201AJobs with permit(s) procured by DOT
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 7-16-09) (FA 7-30-09) (1-15)

Change(s) to: 7-2.2.
SP0070202When SWPPP is used. (One or more acres disturbed.)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 4-18-14) (1-15)

Change(s) to: 7-7.1, 7-13.2, 7-13.3.
SP0070701DCDistrict Let Contracts less than $250,000 and all Maintenance Contracts.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 11-5-10) (FA 11-9-10) (1-15)

Change(s) to: 7-11.5.
SP0071104Projects Involving CSX Transportation.
UTILITY WORK.
(REV 2-10-94) (1-15)

Change(s) to: 7-11.5.3.
SP0071153AWhen there are no utility work schedules
UTILITY SCHEDULES.
(REV 8-27-01) (FA 4-14-05) (1-15)

Change(s) to: 7-11.5.3.
SP0071153BWhen there are utility work schedules
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 12-21-09) (FA 12-28-09) (1-15)

Insert Information Required.
Change(s) to: 7-16.
SP0071600All Federal Aid Jobs
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-15)

Change(s) to: Section 7-26.
SP0072600Non-Federal Aid Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-15)

Change(s) to: Section 7.
SP0072700Non-Federal Aid Projects - Construction Projects Only
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-15)

Change(s) to: Section 7.
SP0072800All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 6-17-11) (1-15)

Change(s) to: Section 7.
SP0072900All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A.
(REV 11-12-13) (FA 11-26-13) (1-15)

Change(s) to: Section 7.
SP0073000All Federally Funded Jobs.
PROSECUTION AND PROGRESS - SUBMISSION OF WORKING SCHEDULE.
(REV 1-11-11) (FA 5-12-11) (1-15)

Change(s) to: 8-3.2.
SP0080302AUse only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC.
PROSECUTION AND PROGRESS.
(REV 6-18-12) (1-15)

Change(s) to: 8-3.2, 8-8, 8-9.1.
SP0080302DCDistrict Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts.
Do not use with SP0080302A.
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 2-15-10) (FA 2-17-10) (1-15)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303AWhen called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
BEGINNING WORK.
(REV 7-10-95) (7-14)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303BWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
BEGINNING WORK.
(REV 10-22-98) (11-5-98) (1-15)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080303CWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
PROSECUTION OF WORK - PARTNERING.
(REV 5-5-12) (FA 5-21-12) (1-15)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080306999-16*
*Contracts Office must be notified
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-15)

Change(s) to: 8-3.
SP0080307DRB999-20 Items
Contracts Office must be notified
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-15)

Change(s) to: 8-3.
SP0080307RDRBJobs without 999-20 Items
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-15)

Change(s) to: 8-3.
SP0080308SDRB334, 337, 350, 570, 580 or 649 Items.
PROSECUTION AND PROGRESS.
(REV 8-1-00) (1-15)

Change(s) to: 8-4.1, 8-7.3.1.
SP0080401LSLump Sum Projects
LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-15)

Change(s) to: 8-4.8.
SP0080408Jobs on Limited Access Highways
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (1-15)

Insert Information Required.
Change(s) to: 8-4.9.
SP0080409Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (1-15)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701AUse with approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (1-15)

Change(s) to: 8-7.1.
SP0080701ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (1-15)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701BUse with the approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (1-15)

Change(s) to: 8-7.1.
SP0080701CUse when requested by the District Construction Engineer.
DAMAGE RECOVERY.
(REV 2-4-04) (1-15)

Insert Information Required.
Change(s) to: Section 8.
SP0081300Use when requested by the District Construction Engineer. (Do not use with Lane Rental)
PROSECUTION AND PROGRESS.
(REV 7-28-97) (1-15)

Change(s) to: Section 8.
SP0081300AAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABBA+B Jobs with Bonus Use with the approval of the District Construction Engineer.
8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BBonus (Date Specific) Use with the approval of the District Construction Engineer.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BCDBonus (Calendar Days) Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDIncentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDLRIncentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LQSLiquidated Savings. Use with the approval of the District Construction Engineer.
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)

Change(s) to: 8-13.
SP0081300LRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LRDR.
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LRDRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LR.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MBMilestone Bonus Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD
8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MIDMilestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID
MEASUREMENT AND PAYMENT.
(REV 4-9-14) (FA 4-29-14) (1-15)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.
SP0090103LSLump Sum Projects. Do not use with SP0090103SLLS.
MEASUREMENT AND PAYMENT.
(REV 2-25-14) (FA 5-6-14) (1-15)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9.
SP0090103SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090103LS.
MEASUREMENT AND PAYMENT.
(REV 2-25-14) (FA 5-6-14) (1-15)

Change(s) to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9, 9-11.
SP0090103SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090501DC.
MEASUREMENT AND PAYMENT.
(REV 10-29-08) (FA 1-16-09) (1-15)

Change(s) to: 9-5.1, 9-5.4, 9-9.
SP0090501DCDistrict Let Contracts. Excluding Lump Sum Projects. Do not use with SP0090103SLPQ.
ENGINEER'S FIELD OFFICE.
(REV 5-8-13) (FA 5-16-13) (1-15)

Change(s) to: 109.
SP1090000109-71 Items
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED.
(REV 9-10-07) (FA 2-15-08) (1-15)

Insert Information Required.
Change(s) to: 110-6.1.
SP1100601Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material.
REMOVAL OF EXISTING STRUCTURES.
(REV 1-29-13) (FA 2-15-13) (1-15)

Change(s) to: 110-6.6.
SP1100606Use when areas of Asbestos Abatement are identified in the Plans
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (1-15)

Change(s) to: 110-11.2, 110-12.7.
SP1101102110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-29-13) (FA 2-15-13) (1-15)

Change(s) to: 120-1.
SP1200100AUse when contaminated areas are delineated in the plans
EXCAVATION AND EMBANKMENT - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (1-15)

Change(s) to: 120-10.3.1.
SP1201003SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
EXCAVATION FOR STRUCTURES AND PIPE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (1-15)

Change(s) to: 125-9.3.1.
SP1250903SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
STABILIZING - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (1-15)

Change(s) to: 160-4.2.4.
SP1600402SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
ROCK BASE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (1-15)

Change(s) to: 200-7.2.2
SP2000702SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
GRADED AGGREGATE BASE.
(REV 8-8-07) (1-15)

Change(s) to: 204.
SP2040000285 Items. Do not use on Interstate Projects.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-15)

Insert Information Required.
Change(s) to: 327-1, 327-6.
SP3270100When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (1-15)

Change(s) to: 327-2.
SP3270200Use when requested by districts
PORTLAND CEMENT CONCRETE - ACCEPTANCE SAMPLING FREQUENCY.
(REV 6-25-10) (FA 7-8-10) (1-15)

Change(s) to: 346-9.2.
SP3460902SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
INTEGRAL PILE JACKETS.
(REV 11-16-11) (FA 12-8-11) (1-15)

Change(s) to: 457.
SP4570000457 Items
LANDSCAPING.
(REV 3-15-13) (1-15)

Change(s) to: 580.
SP5800000Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
LANDSCAPING.
(REV 3-15-13) (1-15)

Change(s) to: 580.
SP5800000FAAll Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
GALVANIZED STEEL POLES, MAST ARMS AND MONOTUBE ASSEMBLIES.
(REV 10-13-14) (1-15)

Change(s) to: 649.
SP6490000All Jobs
Mandatory No. 2
VEHICULAR TRAFFIC SIGNAL ASSEMBLIES.
(REV 10-10-14) (1-15)

Change(s) to: 650.
SP6500000All Jobs
Mandatory No. 2
MAST ARM, SPAN WIRE, AND POLE MOUNTING ASSEMBLIES.
(REV 10-10-14) (1-15)

Change(s) to: 659.
SP6590000All Jobs
Mandatory No. 2
TRAFFIC CONTROL SYSTEM AUXILIARIES.
(REV 11-5-14) (1-15)

Change(s) to: 685.
SP6850000685 Items
Mandatory No. 3
TRAFFIC MONITORING SITE VEHICLE SENSOR - NON-WEIGHT APPLICATIONS.
(REV 1-3-12) (FA 1-27-12) (1-15)

Change(s) to: 741.
SP7410000741-1 Items
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (1-15)

Change(s) to: 743.
SP7430000743-70 Items
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 10-22-10) (FA 11-22-10) (1-15)

Change(s) to: 744.
SP7440000744-70 Items
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 1-10-13) (FA 1-15-13) (1-15)

Change(s) to: 745.
SP7450000745-70 Items
TRAFFIC MONITORING SITE CABINET.
(REV 5-6-08) (FA 10-14-08) (1-15)

Change(s) to: 746.
SP7460000746-7A-BCD
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (1-15)

Change(s) to: 747.
SP7470000747-70 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (1-15)

Change(s) to: 748.
SP7480000Jobs with Traffic Monitoring Sites
   
Supplemental SpecificationsSS0000001Usage Note
102  MAINTENANCE OF TRAFFIC.
(REV 10-28-14) (FA 11-6-14) (1-15)

Change(s) to: 102-3.2, 102-6.2, 102-9.1, 102-9.2, 102-9.5, 102-11.3, 102-11.5, 102-11.8, 102-11.22, 102-11.23.
SS1020302All Jobs
Mandatory No. 1 and Mandatory No. 3
471  FIBER REINFORCED POLYMER FENDER SYSTEMS.
(REV 8-15-14) (FA 9-10-14) (1-15)

Change(s) to: 471.
SS4710000All Jobs
Mandatory No. 1
653  PEDESTRIAN SIGNAL ASSEMBLIES.
(REV 9-4-14) (FA 9-16-14) (1-15)

Change(s) to: 653.
SS6530000All Jobs
Mandatory No. 1
670  TRAFFIC CONTROLLER ASSEMBLIES.
(REV 7-29-14) (FA 9-10-14) (1-15)

Change(s) to: 670.
SS6700000All Jobs
Mandatory No. 1
676  TRAFFIC CABINETS.
(REV 9-5-14) (FA 9-10-14) (1-15)

Change(s) to: 676.
SS6760000All Jobs
Mandatory No. 1
985  GEOSYNTHETIC MATERIALS.
(REV 9-2-14) (FA 9-10-14) (1-15)

Change(s) to: 985.
SS9850000All Jobs
Mandatory No. 1
   
AppendicesXAPENCICJobs with TSPs
TECHNICAL SPECIAL PROVISIONS.

The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.

 

XTSPsJobs with TSPs