July 2014 Workbook


Implemented Modifications to the 2014 Standard Specifications

July 2014 Workbook

for Lettings Effective July - December 2014


Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

 

Supplemental Specifications - Additions or revisions to the Standard Specifications.

 

History of Revisions - To review the History of revisions for this Workbook.

 

Mandatory Revisions - Critical modifications implemented for the Workbook.
Mandatory Revision #6 - To review the implementation letter.
Mandatory Revision #5 - To review the implementation letter.

REISSUED Mandatory Revision #4 - To review the implementation letter.
Mandatory Revision #4 - To review the implementation letter.
Mandatory Revision #3 - To review the implementation letter.
Mandatory Revision #2 - To review the implementation letter.
Mandatory Revision #1 - To review the implementation letter.

 

Workbook Document - Final - To review the changes to the Workbook.
Workbook Document - Draft - To review the Workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 200 kb.

SPECIAL PROVISIONSSP0000001All Jobs
PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK.
(REV 2-19-14) (FA 2-20-14) (7-14)

Insert Information Required.
Change(s) to: 2-4.
SP0020400All Jobs, (add a phone number or e-mail address)
PREPARATION OF PROPOSALS.
(REV 6-22-04) (FA 7-13-04) (7-14)

Change(s) to: 2-5.1.
SP0020501ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB,SP0080701AB and SP0081300AB
PREPARATION OF PROPOSALS.
(REV 2-21-05) (FA 3-31-05) (7-14)

Insert Information Required.
Change(s) to: 2-5.1.
SP0020501LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR
CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 4-23-13) (FA 5-14-13) (7-14)

Change(s) to: 3-1.
SP0030100Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
Notify Contracts Office on Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-14)

Insert Information Required
Change(s) to: 3-1.
SP0030100ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB
BUDGETARY CONSTRAINTS.
(REV 9-26-06) (FA 10-6-06) (7-14)

Insert Information Required
Change(s) to: 3-1.
SP0030100BCUse at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
Notify the Contracts Administration Office on the Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 12-21-12) (1-10-13) (7-14)

Change(s) to: 3-1, 3-2.2, 3-5.1.
SP0030100DCDistrict Let Construction Contracts less than $250,000 and
all Maintenance Contracts, excluding Lump Sum
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-14)

Change(s) to: 3-1.
SP0030100LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (7-14)

Change(s) to: 3-1.
SP0030100LSLump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (7-14)

Insert Information Required
Change(s) to: 3-2, 3-6, 3-7.
SP0030200When necessary to change standard “Award and Execution”
Contracts Office must approve.
AWARD OF CONTRACTS - A+B BIDDING
(REV 8-22-96) (FA 9-3-96) (7-14)

Insert Information Required
Change(s) to: 3-2.
SP0030203ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (7-14)

Insert Information Required.
Change(s) to: 4-1.
SP0040100All Jobs, excluding Lump Sum.
Do not use with SP0040100SLPQ.
SCOPE OF THE WORK.
(REV 8-24-10) (FA 10-8-10) (7-14)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100LSAll Lump Sum Projects.
Do not use with SP0040100SLLS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 8-24-10) FA 10-8-10) (7-14)

Insert Information Required.
Change(s) to: 4-14-3.1, 4-3.4, 4-3.9.4.
SP0040100SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100LS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 9-16-09) (FA 11-9-09) (7-14)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100.
UNFORESEEABLE WORK.
(REV 9-28-98) (7-14)

Change(s) to: 4-4.
SP0040400999-25
CONTROL OF THE WORK.
(REV 3-15-02) (7-14)

Change(s) to: 5-1.1, 5-2, 5-7.6.
SP0050101LSLump Sum Projects
CONTROL OF THE WORK.
(REV 4-17-14) (7-14)

Change(s) to: 5-1.4.5.7.
SP0050104All Jobs
Mandatory No. 6
INSPECTION.
(REV 2-10-94) (7-14)


Change(s) to: 5-9.1
SP0050901Long bridge jobs (1500 feet or longer); modify to suit
CONTROL OF MATERIALS.
(REV 8-17-09) (FA 8-24-09) (7-14)

Change(s) to: 6-1.
SP0060100LSLump Sum Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - COMPLIANCE WITH FHWA 1273.
(REV 1-2-14) (1-16-14) (7-14)
Change(s) to: 7-1.1.
SP0070101All Federal Aid Jobs
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (FA 4-14-05) (7-14)

Change(s) to: 7-2.1.
SP0070201AJobs with permit(s) procured by DOT
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 7-16-09) (FA 7-30-09) (7-14)

Change(s) to: 7-2.2.
SP0070202When SWPPP is used. (One or more acres disturbed.)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 4-18-14) (7-14)

Change(s) to: 7-7.1, 7-13.2, 7-13.3.
SP0070701DCDistrict Let Contracts less than $250,000 and all Maintenance Contracts. Do not use with SP0071302.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 11-5-10) (FA 11-9-10) (7-14)

Change(s) to: 7-11.5.
SP0071104Projects Involving CSX Transportation.
UTILITY WORK.
(REV 2-10-94) (7-14)

Change(s) to: 7-11.5.3.
SP0071153AWhen there are no utility work schedules
UTILITY SCHEDULES.
(REV 8-27-01) (FA 4-14-05) (7-14)

Change(s) to: 7-11.5.3.
SP0071153BWhen there are utility work schedules
LEGAL REQUIREMENTS AND RESPONSIBILITY OT THE PUBLIC.
(REV 4-15-14) (7-14)

Change(s) to: 7-13.
SP0071302All Jobs. Do not use with SP0070701DC.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 12-21-09) (FA 12-28-09) (7-14)

Insert Information Required.
Change(s) to: 7-16.
SP0071600All Federal Aid Jobs
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (7-14)

Change(s) to: Section 7-26.
SP0072600Non-Federal Aid Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (7-14)

Change(s) to: Section 7.
SP0072700Non-Federal Aid Projects - Construction Projects Only
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (7-14)

Change(s) to: Section 7.
SP0072800All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 6-17-11) (7-14)

Change(s) to: Section 7.
SP0072900All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A.
(REV 11-12-13) (FA 11-26-13) (3-14)

Change(s) to: Section 7.
SP0073000All Federally Funded Jobs.
PROSECUTION AND PROGRESS - SUBMISSION OF WORKING SCHEDULE.
(REV 1-11-11) (FA 5-12-11) (7-14)

Change(s) to: 8-3.2.
SP0080302AUse only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC.
PROSECUTION AND PROGRESS.
(REV 6-18-12) (7-14)

Change(s) to: 8-3.2, 8-8, 8-9.1.
SP0080302DCDistrict Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts.
Do not use with SP0080302A.
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 2-15-10) (FA 2-17-10) (7-14)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303AWhen called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
BEGINNING WORK.
(REV 7-10-95) (7-14)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303BWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
BEGINNING WORK.
(REV 10-22-98) (11-5-98) (7-14)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080303CWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
PROSECUTION OF WORK - PARTNERING.
(REV 5-5-12) (FA 5-21-12) (7-14)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080306999-16*
*Contracts Office must be notified
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-14)

Change(s) to: 8-3.
SP0080307DRB999-20 Items
Contracts Office must be notified
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-14)

Change(s) to: 8-3.
SP0080307RDRBJobs without 999-20 Items
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-14)

Change(s) to: 8-3.
SP0080308SDRB334, 337, 350, 570, 580 or 649 Items.
PROSECUTION AND PROGRESS.
(REV 8-1-00) (7-14)

Change(s) to: 8-4.1, 8-7.3.1.
SP0080401LSLump Sum Projects
LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (7-14)

Change(s) to: 8-4.8.
SP0080408Jobs on Limited Access Highways
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-14)

Insert Information Required.
Change(s) to: 8-4.9.
SP0080409Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (7-14)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701AUse with approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (7-14)

Change(s) to: 8-7.1.
SP0080701ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (7-14)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701BUse with the approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (7-14)

Change(s) to: 8-7.1.
SP0080701CUse when requested by the District Construction Engineer.
DAMAGE RECOVERY.
(REV 2-4-04) (7-14)

Insert Information Required.
Change(s) to: Section 8.
SP0081300Use when requested by the District Construction Engineer. (Do not use with Lane Rental)
PROSECUTION AND PROGRESS.
(REV 7-28-97) (7-14)

Change(s) to: Section 8.
SP0081300AAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABBA+B Jobs with Bonus Use with the approval of the District Construction Engineer.
8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BBonus (Date Specific) Use with the approval of the District Construction Engineer.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BCDBonus (Calendar Days) Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDIncentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDLRIncentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LQSLiquidated Savings. Use with the approval of the District Construction Engineer.
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)

Change(s) to: 8-13.
SP0081300LRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LRDR.
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LRDRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LR.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MBMilestone Bonus Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD
8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MIDMilestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID
MEASUREMENT AND PAYMENT.
(REV 4-9-14) (7-14)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.
SP0090103LSLump Sum Projects. Do not use with SP0090103SLLS.
Mandatory No. 4
MEASUREMENT AND PAYMENT.
(REV 10-4-13) (FA 10-15-13) (7-14)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9.
SP0090103SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090103LS.
MEASUREMENT AND PAYMENT.
(REV 10-4-13) (FA 10-15-13) (7-14)

Change(s) to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9, 9-11.
SP0090103SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090501DC.
MEASUREMENT AND PAYMENT.
(REV 4-9-14) (7-14)

Change(s) to: 9-2.1.1.
SP0090201All Jobs.
Do not use with SP0090103LS,
SP0090103SLLS or SP0090103SLPQ.
Mandatory No. 4
MEASUREMENT AND PAYMENT.
(REV 10-29-08) (FA 1-16-09) (7-14)

Change(s) to: 9-5.1, 9-5.4, 9-9.
SP0090501DCDistrict Let Contracts. Excluding Lump Sum Projects. Do not use with SP0090103SLPQ.
MAINTENANCE OF TRAFFIC.
(REV 3-19-14) (7-14)

Change(s) to: 102-9.5.3, 102-11.10, 102-13.10, 102-13.23.
SP1020302All Jobs
Mandatory Nos. 2 and 3
ENGINEER'S FIELD OFFICE.
(REV 5-8-13) (FA 5-16-13) (7-14)

Change(s) to: 109.
SP1090000109-71 Items
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED.
(REV 9-10-07) (FA 2-15-08) (7-14)

Insert Information Required.
Change(s) to: 110-6.1.
SP1100601Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material.
REMOVAL OF EXISTING STRUCTURES.
(REV 1-29-13) (FA 2-15-13) (7-14)

Change(s) to: 110-6.6.
SP1100606Use when areas of Asbestos Abatement are identified in the Plans
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (7-14)

Change(s) to: 110-11.2, 110-12.7.
SP1101102110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-29-13) (FA 2-15-13) (7-14)

Change(s) to: 120-1.
SP1200100AUse when contaminated areas are delineated in the plans
EXCAVATION AND EMBANKMENT - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-14)

Change(s) to: 120-10.3.1.
SP1201003SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
EXCAVATION FOR STRUCTURES AND PIPE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-14)

Change(s) to: 125-9.3.1.
SP1250903SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
STABILIZING - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-14)

Change(s) to: 160-4.2.4.
SP1600402SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
ROCK BASE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-14)

Change(s) to: 200-7.2.2
SP2000702SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
GRADED AGGREGATE BASE.
(REV 8-8-07) (7-14)

Change(s) to: 204.
SP2040000285 Items. Do not use on Interstate Projects.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (7-14)

Insert Information Required.
Change(s) to: 327-1, 327-6.
SP3270100When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (7-14)

Change(s) to: 327-2.
SP3270200Use when requested by districts
PORTLAND CEMENT CONCRETE - ACCEPTANCE SAMPLING FREQUENCY.
(REV 6-25-10) (FA 7-8-10) (7-14)

Change(s) to: 346-9.2.
SP3460902SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
STRUCTURES FOUNDATIONS - DYNAMIC TESTING WITHOUT TEST PILES..
(REV 6-26-12) (7-14)

Change(s) to: 455-1 through 455-12.
SP4550100DTwoTPUse on Projects for 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles.
STRUCTURES FOUNDATIONS - DYNAMIC TESTING WITH TEST PILES.
(REV 6-26-12) (7-14)

Change(s) to: 455-1 through 455-12.
SP4550100DTwTPUse on Projects for 100% Dynamic Testing of Pile Foundations WITH Test Piles.
INTEGRAL PILE JACKETS.
(REV 11-16-11) (FA 12-8-11) (7-14)

Change(s) to: 457.
SP4570000457 Items
538   RESETTING GUARDRAIL.
(REV 3-6-14) (7-14)

Change(s) to: 538.
SP5380000538-1 Items
Mandatory No. 1
LANDSCAPING.
(REV 3-15-13) (7-14)

Change(s) to: 580.
SP5800000Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
LANDSCAPING.
(REV 3-15-13) (7-14)

Change(s) to: 580.
SP5800000FAAll Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
TRAFFIC MONITORING SITE VEHICLE SENSOR - NON-WEIGHT APPLICATIONS.
(REV 1-3-12) (FA 1-27-12) (7-14)

Change(s) to: 741.
SP7410000741-1 Items
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (7-14)

Change(s) to: 743.
SP7430000743-70 Items
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 10-22-10) (FA 11-22-10) (7-14)

Change(s) to: 744.
SP7440000744-70 Items
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 1-10-13) (FA 1-15-13) (7-14)

Change(s) to: 745.
SP7450000745-70 Items
TRAFFIC MONITORING SITE CABINET.
(REV 5-6-08) (FA 10-14-08) (7-14)

Change(s) to: 746.
SP7460000746-7A-BCD
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (7-14)

Change(s) to: 747.
SP7470000747-70 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (7-14)

Change(s) to: 748.
SP7480000Jobs with Traffic Monitoring Sites
 
Supplemental SpecificationsSS0000001All Jobs
007   LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 12-10-13) (FA 1-23-14) (7-14)

Change(s) to: 7-1.7, 7-7.2, 7-13.
SS0070107All Jobs
008   PROSECUTION AND PROGRESS.
(REV 11-26-13) (FA 2-7-14) (7-14)

Change(s) to: 7-1.7, 7-7.2, 7-13.
SS0080401All Jobs
102   MAINTENANCE OF TRAFFIC.
(REV 1-31-14) (FA 2-7-14) (7-14)

Change(s) to: 102-11.21, 102-13.23.
SS1021121All Jobs
110   CLEARING AND GRUBBING.
(REV 12-11-13) (FA 1-16-14) (7-14)

Change(s) to: 110-11.3.
SS1101103All Jobs
120   EXCAVATION AND EMBANKMENT.
(REV 12-5-13) (FA 12-16-13) (7-14)

Change(s) to: 120.
SS1200000All Jobs
125   EXCAVATION FOR STRUCTURES AND PIPE.
(REV 12-5-13) (FA 1-24-14) (7-14)

Change(s) to: 125-1, 125-9.1, 125-9.2.2, 125-11.
SS1250100All Jobs
160   STABILIZING.
(REV 1-9-14) (FA 1-16-14) (7-14)

Change(s) to: 160-3.1, 160-3.2, 160-4.2.4.
SS1600301All Jobs
200   ROCK BASE.
(REV 11-14-13) (FA 12-3-13) (7-14)

Change(s) to: 200-2, 200-6.1, 200-7.2, 200-11.
SS2000200All Jobs
300   PRIME AND TACK COATS.
(REV 12-17-13) (FA 1-2-14) (7-14)

Change(s) to: 300-2.1, 300-2.3.
SS3000201All Jobs
320   HOT MIX ASPHALT - PLANT METHODS AND EQUIPMENT.
(REV 10-25-13) (FA 1-2-14) (7-14)

Change(s) to: 320-6.3.2.
SS3200603All Jobs
327   MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-29-13) (FA 11-20-13) (7-14)

Change(s) to: 327-3.1.
SS3270301All Jobs
334   SUPERPAVE ASPHALT CONCRETE.
(REV 10-25-13) (FA 1-2-14) (7-14)

Change(s) to: 334-1.4.1, 334-2.1, 334-5.3.
SS3340104All Jobs
336   ASPHALT RUBBER BINDER.
(REV 11-4-13) (FA 1-2-14) (7-14)

Change(s) to: 336-7.
SS3360700All Jobs
337   ASPHALT CONCRETE FRICTION COURSES.
(REV 11-4-13) (FA 1-2-14) (7-14)

Change(s) to: 337-2.1, 337-2.6.
SS3370201All Jobs
350   CEMENT CONCRETE PAVEMENT.
(REV 11-5-13) (FA 1-2-14) (7-14)

Change(s) to: 350-1, 350-7.2, 350-17.2, 350-18.
SS3500100All Jobs
353   CONCRETE PAVEMENT SLAB REPLACEMENT.
(REV 1-13-14) (FA 1-16-14) (7-14)

Change(s) to: 353-2, 353-9.1, 353-11.
SS3530200All Jobs
400   CONCRETE STRUCTURES.
(REV 12-16-13) (FA 1-28-14) (7-14)

Change(s) to: 400-7.10, 400-16.6, 400-21.3, 400-23.3.
SS4000710All Jobs
410   PRECAST CONCRETE BOX CULVERT.
(REV 11-26-13) (FA 12-18-13) (7-14)

Change(s) to: 410-2.
SS4100200All Jobs
413   SEALING CRACKS AND CONCRETET STRUCTURE SURFACES.
(REV 1-22-14) (FA 1-24-14) (7-14)

Change(s) to: 413.
SS4130000All Jobs
415   REINFORCING STEEL.
(REV 11-5-13) (FA 1-15-14) (7-14)

Change(s) to: 415-2, 415-6, 415-7.
SS4150200All Jobs
430   PIPE CULVERTS.
(REV 11-14-13) (FA 2-18-14) (7-14)

Change(s) to: 130-2.1, 430-9.
SS4300201All Jobs
431   PIPE LINER.
(REV 11-14-13) (FA 2-18-14) (7-14)

Change(s) to: 431-4.2.5.
SS4310402All Jobs
449   PRECAST CONCRETE DRAINAGE PRODUCTS.
(REV 11-26-13) (FA 12-18-13) (7-14)

Change(s) to: 449-2.
SS4490200All Jobs
450   PRECAST PRESTRESSED CONCRETE CONSTRUCTION.
(REV 12-16-13) (FA 1-28-14) (7-14)

Change(s) to: 450-3.1, 450-12.5.3.
SS4500301All Jobs
455   STRUCTURES FOUNDATIONS.
(REV 12-17-13) (FA 1-22-14) (7-14)

Change(s) to: 455.
SS4550000All Jobs
458   BRIDGE DECK JOINTS.
(REV 10-8-13) (FA 12-18-13) (7-14)

Change(s) to: 458-2.2.
SS4580202All Jobs
460   STRUCTURAL STEEL AND MISCELLANEOUS METALS.
(REV 12-11-13) (FA 1-8-14) (7-14)

Change(s) to: 460-5.1, 460-7.1.3.
SS4600501All Jobs
461   MULTIROTATIONAL BEARINGS.
(REV 1-7-14) (FA 1-15-14) (7-14)

Change(s) to: 461.
SS4610000All Jobs
470   TIMBER STRUCTURES.
(REV 2-13-14) (FA 2-24-14) (7-14)

Change(s) to: 470-12.2.
SS4701202All Jobs
520   CONCRETE GUTTER, CURB ELEMENTS, AND TRAFFIC SEPARATOR.
(REV 1-7-14) (FA 1-16-14) (7-14)

Change(s) to: 520-7.3, 520-12.
SS5200700All Jobs
521   CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS.
(REV 12-9-13) (FA 12-18-13) (7-14)

Change(s) to: 521.
SS5210000All Jobs
522   CONCRETE SIDEWALK AND DRIVEWAYS.
(REV 1-7-14) (FA 1-16-14) (7-14)

Change(s) to: 522-7.2.
SS5220702All Jobs
523   PATTERNED PAVEMENT.
(REV 1-8-14) (FA 1-15-14) (7-14)

Change(s) to: 523-1, 523-2.2.
SS5230100All Jobs
534   NOISE AND PERIMETER WALLS.
(REV 1-13-14) (FA 2-18-14) (7-14)

Change(s) to: 534.
SS5340000All Jobs
536   GUARDRAIL.
(REV 12-12-13) (FA 2-7-14) (7-14)

Change(s) to: 536-5.
SS5360500All Jobs
548   RETAINING WALL SYSTEMS.
(REV 1-16-14) (FA 1-22-14) (7-14)

Change(s) to: 548.
SS5480000All Jobs
561   COATING EXISTING STRUCTURAL STEEL.
(REV 12-30-13) (FA 1-8-14) (7-14)

Change(s) to: 561-10.1, 561-12, 561-13.
SS5611001All Jobs
603   GENERAL REQUIREMENTS FOR TRAFFIC CONTROL SIGNALS AND DEVICES.
(REV 1-14-14) (FA 1-22-14) (7-14)

Change(s) to: 603.
SS6030000All Jobs
620   TRAFFIC CONTROL SIGNAL AND DEVICE INSTALLATION GROUNDING.
(REV 1-30-14) (FA 2-4-14) (7-14)

Change(s) to: 620.
SS6200000All Jobs
632   SIGNAL CABLE.
(REV 2-6-14) (FA 2-18-14) (7-14)

Change(s) to: 632-2.
SS6320200All Jobs
633   COMMUNICATIO9N CABLE.
(REV 11-18-13) (FA 2-18-14) (7-14)

Change(s) to: 633-2.3, 633-2.4.
SS6330203All Jobs
634   SPAN WIRE ASSEMBLY.
(REV 11-18-13) (FA 2-18-14) (7-14)

Change(s) to: 634-2.5.
SS6340200All Jobs
635   PULL, SPLICE, AND JUNCTION BOXES.
(REV 11-21-13) (FA 2-4-14) (7-14)

Change(s) to: 635-3.2, .
SS6350302All Jobs
641   PRESTRESSED CONCRETE POLES.
(REV 11-4-13) (FA 1-8-14) (7-14)

Change(s) to: 641-4.2.
SS6410402All Jobs
663   SIGNAL PRIORITY AND PREEMPTION SYSTEMS.
(REV 1-14-14) (FA 2-4-14) (7-14)

Change(s) to: 663.
SS6630000All Jobs
671   TRAFFIC CONTROLLERS.
(REV 11-25-13) (FA 1-22-14) (7-14)

Change(s) to: 671.
SS6710000All Jobs
677   EQUIPMENT SHELTER.
(REV 2-17-14) (FA 2-25-14) (7-14)

Change(s) to: 677.
SS6770000All Jobs
700   HIGHWAY SIGNING.
(REV 1-27-14) (FA 1-28-14) (7-14)

Change(s) to: 700.
SS7000000All Jobs
701   AUDIBLE AND VIBRATORY PAVEMENT MARKINGS.
(REV 9-4-13) (FA 10-23-13) (7-14)

Change(s) to: 701-4.2, 701-7.
SS7010402All Jobs
702   WET WEATHER PAVEMENT MARKINGS.
(REV 9-5-13) (FA 10-23-13) (7-14)

Change(s) to: 702-4.2, 702-7.
SS7020402All Jobs
709   TRAFFIC STRIPES AND MARKINGS - TWO REACTIVE COMPONENTS.
(REV 9-10-13) (FA 10-23-13) (7-14)

Change(s) to: 709-7.
SS7090700All Jobs
711   THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS.
(REV 9-5-13) (FA 10-23-13) (7-14)

Change(s) to: 711-7.
SS7110700All Jobs
713   PERMANENT TAPE TRAFFIC STRIPES AND MARKING.
(REV 9-10-13) (FA 10-23-13) (7-14)

Change(s) to: 713-7.
SS7130700All Jobs
785   INTELLIGENT TRANSPORTATION SYSTEMS - INFRASTRUCTURE.
(REV 2-4-14-13) (FA 2-7-14) (7-14)

Change(s) to: 785.
SS7850000All Jobs
901   COARSE AGGREGATE.
(REV 10-16-13) (FA 11-26-13) (7-14)

Change(s) to: 901-1.2.
SS9010102All Jobs
914   STABILIZATION MATERIALS.
(REV 11-14-13) (FA 11-26-13) (7-14)

Change(s) to: 914.
SS9140000All Jobs
916   BITUMINOUS MATERIALS.
(REV 12-17-13) (FA 1-8-14) (7-14)

Change(s) to: 916.
SS9160000All Jobs
919   GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER.
(REV 10-25-13) (FA 1-2-14) (7-14)

Change(s) to: 919.
SS9190000All Jobs
925   CURING MATERIALS FOR CONCRETE.
(REV 1-10-14) (FA 1-23-14) (7-14)

Change(s) to: 925.
SS9250000All Jobs
926   EPOXY COMPOUNDS.
(REV 1-14-14) (FA 1-24-14) (7-14)

Change(s) to: 926.
SS9260000All Jobs
931   METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES.
(REV 12-9-13) (FA 12-16-13) (7-14)

Change(s) to: 931-1.2, 931-3.6., 931-4
SS9310102All Jobs
932   NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES.
(REV 12-3-13) (FA 1-24-14) (7-14)

Change(s) to: 932-1.3.1, 932-1.3.2, 932-2.3.
SS9320103All Jobs
948   OPTIONAL DRAINAGE PRODUCTS AND LINER REPAIR SYSTEMS.
(REV 1-27-14) (FA 2-18-14) (7-14)

Change(s) to: 948.
SS9480000All Jobs
960   POST-TENSIONING COMPONENTS.
(REV 11-15-13) (FA 1-8-14) (7-14)

Change(s) to: 960-2.1.
SS9600201All Jobs
971   TRAFFIC MARKING MATERIALS.
(REV 1-8-14) (FA 1-15-14) (7-14)

Change(s) to: 971.
SS9710000All Jobs
 
AppendicesXAPENCICJobs with TSPs
TECHNICAL SPECIAL PROVISIONS.

The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.

 

XTSPsJobs with TSPs