Program Management / Specifications

Web Links in Implemented Specifications

Program Management

WEB LINKS WITHIN IMPLEMENTED SPECIAL PROVISIONS

Spec Book
Section Number
Topic Description
2
Proposal Requirements and Conditions
Qualification of Bidders ARTICLE 2-1 Qualification of Bidders. The Business Development Initiative is performed under the authorization granted to the Department by Section 337.025 Florida Statutes. Bidders must be a small business as defined by the Department. A listing of the small business size standards can be found at http://www.fdot.gov/equalopportunity/sizeStandards.shtm .
Examination of Contract Documents and Site of Work ARTICLE 2-4 Examination of Contract Documents and Site of Work. Direct all questions to the Department by posting them to the Department's website at the following URL address: https://www3b.dot.state.fl.us/BidQuestionsAndAnswers/.
7
Legal Requirements and Responsibilities to the Public
FHWA 1273 SUBARTICLE 7-1.1 The FHWA-1273 Electronic version, dated May 1, 2012 is posted on the Department's website at the following URL address:http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/files/FHWA1273.pdf.
Compliance with Federal Endangered Species Act and other Wildlife Regulations SUBARTICLE 7-1.4 These guidelines are posted at the following URL address: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/files/endangeredwildlifeguidelines.pdf
Permits and Utility Work Schedules SUBARTICLE 7-2.1 General: All Permits procured by the Department are posted on the Department's website at the following URL address: https://ftp.fdot.gov/public/folder/HkSWlK59G0qRNsAJUh3xXg/permitsandorutilityworkschedules.
DEP Permit SUBARTICLE 7-2.2 Work or Structures in Navigable Waters of the U.S., Waters of the U.S., and Waters of the State: The "State of Florida Department of Environmental Protection (DEP) Generic Permit for Stormwater Discharge from Large and Small Construction Activities" applies to this Contract. Obtain a copy of the permit through the Department's website and comply with the requirements of the permit. The URL for obtaining a copy of the permit is http://http://www.dep.state.fl.us/water/stormwater/npdes/permits_forms.htm.
Operations Within Railroad Right-of-Way SUBARTICLE 7-11.4.2: Contractor's Responsibilities: Comply with CSXT Construction Submission Criteria and the Construction sections of the CSXT Pipeline and Wireline Design and Construction Standards found at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Files/CSXspecs.pdf
Permits and Utility Work Schedules SUBARTICLE 7-11.5.3 Utility Adjustments: The utility work which will be accomplished concurrently with the highway construction Contract will involve facilities owned by other agencies. Utility Schedules (Utility Relocation and/or Work Schedules) for these agencies are posted on the Department's website at the following URL address: https://https://ftp.fdot.gov/public/folder/HkSWlK59G0qRNsAJUh3xXg/permitsandorutilityworkschedules.
Florida Gas Transmission Company SUBARTICLE 7-11.5.5.2.2 FGT Encroachment Agreements: In addition to the requirements of 7-11.5.5.2.1, do not enter into the Encroachment Area until the FGT representative is present. Comply with the requirements of the FGT representative to safeguard FGT’s property and operations. Specifically, comply with the Engineering and Construction Specifications in Attachment C of the FDOT/FGT Encroachment Agreement for this project. These documents are available at the following URL: https://ftp.fdot.gov/public/folder/HkSWlK59G0qRNsAJUh3xXg/permitsandorutilityworkschedules.
110
Clearing and Grubbing
Asbestos Containing Materials SUBARTICLE 110-6.6 Asbestos Containing Materials (ACM) Identified Prior to the Work: Certain area(s) within the limits of this project have been identified as containing asbestos and are delineated on the plans. The asbestos type and levels, when known, are in the specifications or in an asbestos abatement plan posted on the Department’s website at the following URL address: https://ftp.fdot.gov/public/folder/HkSWlK59G0qRNsAJUh3xXg/permitsandorutilityworkschedules.
120
Excavation and Embankment
Identified Areas of Contamination SUBARTICLE 120-1.3 Identified Areas of Contamination: Certain area(s) within the limits of this project have been identified as contaminated and are delineated on the plans. The contamination type and levels, when known, are in the specifications or in a contamination assessment report posted on the department’s website at the following URL address: https://ftp.fdot.gov/public/folder/HkSWlK59G0qRNsAJUh3xXg/permitsandorutilityworkschedules.

WEB LINKS WITHIN IMPLEMENTED SPECIFICATIONS

Spec Book
Section Number
Topic Description
2
Proposal Requirements and Conditions
Proposals SUBARTICLE 2-2.2 Department Modifications to Contract Documents. Modifications to any Contract Documents will be posted on the Department's website at the following URL address: http://www.fdot.gov/contracts/Lettings/Letting_Project_Info.shtm
6
Control of Materials
Approved Product List (APL) SUBARTICLE 6-1.3.1 Producer Certification:... Manufacturers may obtain sample APL Certification forms on the Department's website at the following URL: http://www.fdot.gov/materials/administration/resources/library/publications/certifications/ sampleforms.shtm.

SUBARTICLE 6-1.3.1.1 Approved Products List: Manufacturers seeking to have a product evaluated for the APL must submit a product evaluation application, available on the Department’s website at the following URL: http://www.fdot.gov/programmanagement/ProductEvaluation/Default.shtm with supporting documentation as defined and detailed by the applicable Specifications and Design Standards.

SUBARTICLE 6-1.3.1.1 .....Manufacturers must re-qualify APL products for approval on or before the product’s original approval anniversary date. The APL requalification schedule and criteria are available on the Department’s website at the following URL: http://www.fdot.gov/programmanagement/ProductEvaluation/QPL/ProEvalReqOther.shtm. The Department will consider failure to perform these actions as sufficient evidence that the properties of the product have changed, and the Department may remove the product from the APL.
7
Legal Requirements and Responsibilities to the Public
Executive Order 11246 SUBARTICLE 7-1.1 General: ...The Executive Order 11246 Electronic version, dated September 24, 1965 is posted on the Department's website at the following URL address: http://www.fdot.gov/programmanagement/federal/deo11246.pdf.
Endangered Wildlife Guidelines SUBARTICLE 7-1.4 Compliance with Federal Endangered Species Act and other Wildlife Regulations: These guidelines are posted at the following URL address: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/files/endangeredwildlifeguidelines.pdf.
Insecticides and Herbicides SUBARTICLE 7-1.7 Insecticides and Herbicides: Use products found on the following website,
http://state.ceris.purdue.edu//, approved by the Florida Department of Agriculture for in the State of Florida.
9
Measurement and Payment
Fuel Adjustments SUBARTICLE 9-2.1.1 Fuels: Price indexes will be determined by the Department and will be available on the Construction Office website before the 15th of each month, at the following URL: http://www.fdot.gov/construction/fuel&Bit/Fuel&Bit.shtm .
Bituminous Material Adjustments SUBARTICLE 9-2.1.2 Bituminous Material: The API will be available on the State Construction Office website before the 15th of each month at the following URL: http://www.fdot.gov/construction/fuel&Bit/Fuel&Bit.shtm.
102
Maintenance of Traffic
ADA Standards SUBARTICLE 102-6.2 .....Where pedestrian facilities are detoured, blocked or closed during hte work, provide safe alternate accessible routes through or around the work zone meeting the requirements of the ADA Standards for Transportation Facilities which may be viewed at the following URL address: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/ADAStandards.shtm.
104
Prevention, Control, and Abatement of Erosion and Water Pollution
State of Florida Erosion and Sediment Control Designer and Reviewer Manual (E&SC) SUBARTICLE 104-6.2 Incorporation of Erosion and Sediment Control Features: An electronic version of the Erosion and Sediment Control Manual can be found at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/FLErosionSedimentManual.shtm .
105
Contractor Quality Control General Requirements
Flexible Pipe SUBARTICLE 105-3.2 Compliance with the Materials Manual. Producers of Flexible Pipe shall meet the requirements of Section 6.1, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section61V2.shtm .
Precast Concrete Pipe Producers of Precast Concrete Pipe shall meet the requirements of Section 6.2, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section62V2.shtm .
Precast Concrete Drainage Structures Producers of Precast Concrete Drainage Structures shall meet the requirements of Section 6.3, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section63V2.shtm.
Precast/Prestressed Concrete Products Producers of Precast/Prestressed Concrete Products shall meet the requirements of Sections 8.1 and 8.3 of the Department's Materials Manual, which may be viewed at the following URLs: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section81V1.shtm. http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section83V1.shtm.
Precast/Prestressed Concrete Products using Self Consolidating Concrete Producers of Precast Prestressed Concrete Products using Self Consolidating Concrete shall meet the requirements of Section 8.4, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section84V2.shtm .
Incidental Precast/Prestressed Concrete Products Producers of Incidental Precast/Prestressed Concrete Products shall meet the requirements of Section 8.2, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section82V2.shtm .
Portland Cement Concrete Producers of Portland Cement Concrete shall meet the requirements of Section 9.2, Volume II of the Department's Materials Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section92V2.shtm .
Structural Steel and Miscellaneous Metal Components Producers of Structural Steel and Miscellaneous Metal Components shall meet the requirements of Sections 11.1, 11.2, 11.3, 11.4, 11.5 and 11.6 of the Department's Materials Manual, which may be viewed at the following URLs: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section111V1.shtm, http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section112V2.shtm, http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section113V2.shtm, http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section114V2.shtm, http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section115V2.shtm, and http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section116V2.shtm.
Fiber Reinforced Polymer Composites Producers of Fiber Reinforced Polymer Composites shall meet the requirements of Sections 12.1, Volume II of the Department's Materials Manual, which may be viewed at the following URLs: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section121V2.shtm.
Worksite Traffic Supervisor SUBARTICLE 105-8.3 Temporary Traffic Control (Maintenance of Traffic) Personnel: Worksite Traffic Supervisors, flaggers, and other personnel responsible for work zone related transportation management and traffic control must obtain training and certification in accordance with the Department’s Temporary Traffic Control (Maintenance of Traffic) Training Handbook located at the following URL address: http://www.fdot.gov/roadway/TTC/Default.shtm. .
Signal Installation Inspector SUBARTICLE 105-8.10 Signal Installation Inspector: The Department's approved inspection report forms are available at the following URL: http://www.fdot.gov/traffic/ .
200
Rock Base
Acceptance Program SUBARTICLE 200-7.2.3 Pit Proctor:... For posting of Mines and Pit Proctors for each calendar quarter, refer to the State Materials Office internet website at which may be view at the following URL: http://www.fdot.gov/materials/ .
288
Cement Treated Permeable Base
Control of Quality SUBARTICLE 288-3.1 General: Meet the provisions of this Section and Chapter 9.2 of the Materials Manual - Concrete Production Facilities Guidelines, which may be view at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section92V2.shtm .
330
Hot Mix Asphalt - General Construction Requirements
Surface Requirements SUBARTICLE 330-9.2 Texture of the Finished Surface of Paving Layers: Produce a finished surface of uniform texture and compaction with no pulled, torn, raveled, crushed or loosened portions and free of segregation, bleeding, flushing, sand streaks, sand spots, or ripples. Some examples of pavement deficiencies are displayed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Pavement.shtm.
334
Superpave Asphalt Concrete
Materials SUBARTICLE 334-3.2.1 General: Warm mix technologies (additives, foaming techniques, etc.) listed on the Department's website may be used in the production of the mix. The URL for obtaining this information, if available, is: http://www.fdot.gov/materials/quality/programs/warmmixasphalt/index.shtm .
337
Asphalt Concrete Friction Courses
Materials SUBARTICLE 337-2.1 General Requirements: Meet the requirements specified in Division III as modified herein. The Engineer will base continuing approval of material sources on field performance. Warm mix technologies (additives, foaming techniques, etc.) listed on the Department's website may be used in the production of the mix. The URL for obtaining this information, if available, is: http://www.fdot.gov/materials/quality/programs/warmmixasphalt/index.shtm .
Aggregates - FC-5 SUBARTICLE 337-3.2.1.1 Aggregates: A list of aggregates approved for use in friction course may be available on the Department's website. The URL for obtaining this information, if available, is: https://ftp.fdot.gov/file/d/FTP/FDOT%LTS/fdot/smo/website/sources/frictioncourse.pdf .
Aggregates - FC-9.5 and FC-12.5 SUBARTICLE 337-3.2.2.1 Aggregates: A list of aggregates approved for use in friction course may be available on the Department's website. The URL for obtaining this information, if available, is: https://ftp.fdot.gov/file/d/FTP/FDOT%LTS/fdot/smo/website/sources/frictioncourse.pdf .
338
Value Added Asphalt Pavement
Category 1 Pavement SUBARTICLE 338-5.2 Category 1 Pavement: (8) Raveling, Delamination, Pot holes, Slippage: As defined and determined by the Engineer in accordance with the examples displayed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Pavement.shtm and (9) Bleeding: Bleeding to be determined as defined and determined by the Engineer in accordance with the examples displayed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Pavement.shtm .
430
Pipe Culverts
Final Pipe Inspection SUBARTICLE 430-4.8 Final Pipe Inspection: Laser profiling and measurement technology must be certified by the company performing the work to be in compliance with the calibration criteria posted at: http://www.fdot.gov/construction/contractorissues/laser.shtm . Reports may be submitted in electronic media if approved by the Engineer.
449
Precast Concrete Drainage Products
Rubber Gaskets Used SUBARTICLE 449-5.2 When Rubber Gaskets are Used: Ensure that the pipe joints have been tested at the plant hydrostatically and shown to meet the requirements of Section 6.2 of the Materials Manual, which is available at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section62V2.shtm .
523
Patterned Pavement
Approved Product List SUBARTICLE 523-2.2 Approved Product List (APL): ...6. For products proposed for use as a bike lane application, independent testing verifying that the material can meet the color as identified in the April 15, 2011, Interim Approval for Optional use of Green Colored Pavement for Bike Lanes, Interim Approval (IA-14) Memorandum Valid Under the 2009 MUTCD (http://mutcd.fhwa.dot.gov/resources/interim_approval/ia14/ia14grnpmbiketlanes.pdf.
570
Performance Turf
Turf Establishment ARTICLE 570-4 Turf Establishment. Monitor turf areas and remove all competing vegetation, pest plants, and noxious weeds (as listed by the Florida Exotic Pest Plant Council, Category I "List of Invasive Species", Current Edition, http://www.fleppc.org).
611
Acceptance Procedures for Traffic Control Signals and Devices
As-Built Documentation SUBARTICLE 611-2.3 As-Built Documentation: As a condition precedent to acceptance under 611-2.1 or 611-2.2, submit as-built drawings for all installations, signed and sealed by a Professional Engineer or Professional Surveyor and Mapper registered in the State of Florida, along with supplemental as-built information using Feature Import Templates used for the Department’s ITS Facility Management (ITSFM) System. Feature Import Templates can be found on the Department’s web site: http://www.fdot.gov/traffic/ITS/Projects_Telecom/ITSFM/ITFSM.shtm.
649
Galvanized Steel Strain Poles, Mast Arms and Monotube Assemblies
Inspection Forms SUBARTICLE 649-4.3.2 Responsible Party Warranty: ... This list may be viewed on the Department's website at the following URL: http://www.fdot.gov/construction/.
676
Traffic Cabinets
Type 170 Traffic Signal Controller Cabinets 676-2.3 Type 170 Traffic Signal Controller Cabinets: …Cabinets must comply with figures for traffic control signals and devices available on the Department’s website at the following URL: http://www.fdot.gov/traffic/Traf_Sys/Product-Specifications.shtm
695
Traffic Monitoring Site Equipment and Materials
Functional Requirements SUBARTICLE 695-4.2.4 Functional Requirements:... 4. Classification by lane in vehicle type by axle class in 15 bins (minimum) in accordance with FHWA Classification Scheme “F” in Florida’s Traffic Forecasting Handbook, Chapter 2, Figure 2.2 which can be accessed on the Department’s website at the following URL address: http://www.fdot.gov/planning/statistics/trafficdata/ptf.pdf
700
Highway Signing
Configuration and Management Requirements for Variable Speed Limit ERS SUBARTICLE 700-5.2.8.6 Configuration and Management Requirements for Variable Speed Limit ERS: ... Ensure that the sign controller is addressable through an Ethernet communication network using software that complies with the NTCIP requirements published online by the Florida Department of Transportation Traffic Engineering Research Laboratory at: http://www.fdot.gov/traffic.
916
Bituminous Material
Compliance with the Materials Manual SUBARTICLE 916-2.2 Compliance with the Materials Manual: Producers of Superpave PG binders shall meet the requirements of Section 3.5, Volume II of the Department's Material Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section35V2.shtm.

SUBARTICLE 916-3.1 Compliance with the Materials Manual: Producers of asphalt emulsions shall meet the requirements of Section 3.4, Volume II of the Department's Material Manual, which may be viewed at the following URL: http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section34V2.shtm.
981
Turf Materials
Turf Establishment ARTICLE 981-1 General: All seed, sod and mulch shall be free of noxious weeds and exotic pest plants, plant parts or seed listed in the current Category I "List of Invasive Species" from the Florida Exotic Pest Plant Council (FLEPPC, http://www.fleppc.org).