EMERGENCY INFORMATION FDOT Emergency Travel Alert:
For information on the current situation, please visit the following page - Alerts.

 

Program Management

Program Management / Estimates

Estimates Bulletins & Current Memos

Program Management

Greg Davis, State Estimates Engineer
Phone: (850) 414-4170
Fax: (850) 414-4199

For 2016 Bulletins, please visit the Program Management Publications page at http://www.fdot.gov/programmanagement/Publications.shtm

 

Note: All memos are in Adobe Acrobat (PDF) format. File Size ranges from 26 kb to 2.8 Mb.
Some of the links in this page may require Adobe PDF. FreeFree Adobe Reader Download download.

Date of Memo Estimates Bulletin Number: Subject Effective Date* Referenced Documents
December 31, 2015 15-08: Initial Contingency Pay Item Immediately, for all projects in which an authorization estimate has not been completed CPAM and Basis of Estimates
December 31, 2015 15-07: Utility Pipe and Related Pay Items July 2017, or earlier Basis of Estimates
August 28, 2015 15-06: Concrete Piling- 100% Dynamic Testing
Note: This is a joint bulletin with Structures Design
July 2015- for specific projects only Basis of Estimates
July 9, 2015 15-05: Reflective Strips
Note: This is a joint bulletin with Traffic Ops
January 2016, or earlier Basis of Estimates, Traffic Engineering Manual (TEM)
July 8, 2015 15-04: Monitor Existing Structures
Note: This is a joint bulletin with Roadway Design, Structures Design, and Materials
January 2016, or earlier Basis of Estimates, Plans Preparation Manual
February 13, 2015 PROGRAM MANAGEMENT MEMORANDUM 15-01: Implementation of Landscape Contracts Immediately  
February 6, 2015 15-03: Protection of Existing Structures
Rescinded; see Estimates Bulletin 15-04.
July 2015 Basis of Estimates, Plans Preparation Manual
January 27, 2015 WEBINAR: Pavement Markings
The webinar, with presentation and audio, is posted on the Design Office's Training- Engineering Academy page at: http://www.fdot.gov/design/Training/EngineeringAcademy/Library.shtm
The presentation (Pavement Markings Jan 2015.pdf)  and Question/Answer (Pavement Marking Q and A .pdf) files are available here.
January 22, 2015 15-02: Rumble Stripe
Note: This is a joint bulletin with Roadway Design Bulletin 15-03.
July 2015 Basis of Estimates, Plans Preparation Manual
January 23, 2015  15-01: Pavement Marking Materials Selection
Note: Refer to Roadway Design Bulletin 15-02 for additional requirements.
July 2015 Basis of Estimates, Plans Preparation Manual
*Estimates Bulletins will remain effective until either: a) an official manual revision is published, or b) the Estimates Bulletin is made void.
Older Bulletins/Basis of Estimates available at: http://www.fdot.gov/programmanagement/Estimates/BasisofEstimates/BOEManual/BOEOnlineARCHIVE.shtm