EMERGENCY INFORMATION FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts.

State Materials Office

Materials / Publications / Materials Bulletins

Materials Bulletins

FDOT: State Materials Office
 

Materials Bulletins are issued primarily by the Director, Office of Materials. This action is taken when immediate implementation is needed, i.e., such as to implement a mandatory legislative change, FHWA directive, judicial court ruling, Department policy, or other sensitive issue. The document has temporary authority and shall expire one year after the date of issuance unless extended or rescinded by the Director, Office of Materials.

 

No. Subject

File Size

Date

16-17 Buy America Requirements - All Producers

PDF-178KB

09-05-17

15-17 America Cement Company Plant (CMT40)

PDF-1.49MB

08-23-17

14-17 Revisions to Specification Section 121 - Flowable Fill

PDF-906KB

08-23-17

13-17 Contractor QC Plans in MAC

PDF-106KB

09-20-17

12-17 CPAM 11.5 - State Construction Engineer (SCE) Approval of Straightedge Deficiencies Left in Place with Pay

PDF-330KB

08-01-17

11-17 Argos USA Corporation, Cement Plan (CMT09)

PDF-54KB

08-01-17

10-17 Changing PG 82-22 (PMA) To High Polymer Binder  

PDF-54KB

07-14-17

09-17 Materials Manual - Chapter 8.4, Vol II

PDF-154KB

06-23-17

07-17 Titan America Cement Company Plant (CMT23)

PDF-106KB

04-24-17

05-17 Soil Classification Acceptance Criteria

PDF-166KB

03-01-17

04-17 Asphalt Roadway Pavement As-Built Data

PDF-169KB

02-17-17

03-17 CTQPs Concrete Field Inspector Level 2 Qualification Requirements

PDF-166KB

02-06-17

01-17 Asphalt Roadway Daily Report of Quality Control Upload to Materials Acceptance and Certification (MAC) Database

PDF-166KB

01-10-17

12-16 Use of Recycled Concrete Aggregate as Backfill with Aluminum and Metalized Pipe

PDF-162KB

12-23-16

11-16 Titan America Cement Company Plant (CMT23)

PDF-169KB

11-15-16

10-16 Materials Acceptance and Certification System (MAC) Soils/Earthwork Information

PDF-197KB

10-11-16

09-16 Materials Acceptance and Certification System (MAC) Full Implementation

PDF-144KB

09-08-16

08-16 Changing PG 76-22 (ARB) to PG 76-22 (PMA)

PDF-600KB

09-07-16

06-16 Buy America Requirements - All Producers

PDF-358KB

07-12-16

05-16 Materials Acceptance and Certification System (MAC) Full Implementation Schedule

PDF-723KB

06-22-16

04-16 Materials Acceptance and Certification System (MAC) Full Implementation Schedule

PDF-386KB

04-13-16

01-16 Revisions to Specification Section 400 - Concrete Structures [Revised]

PDF-245KB

02-19-16

15-15 Materials Acceptance and Certification System (MAC) Company Profile and MAC Access

PDF-824KB

12-16-15

14-15 Implementation of Vacuum Drying for Determination of Roadway Core Density

PDF-364KB

01-08-16

12-15 Materials Acceptance and Certification System (MAC) Implementation and Contractor Quality Control Plans

PDF-71KB

07-16-15

11-15 Monitor Existing Structures

PDF-1.65MB

07-08-15

10-15 Materials Acceptance and Certification System (MAC) Implementation, Company Profile Training

PDF-937KB

05-26-15

08-15 PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA)

PDF-690KB

03-24-15

04-15 Protection of Existing Structures

PDF-1.56MB

02-06-15

10-14 Specification Change for Section 200 Rock Base - Adding Pit Proctor

PDF-1.27MB

08-04-14

15-13 Specification Change for Rip-Rap, Rubble (Bank and Shore)

PDF-352KB

12-05-13

14-13 Conflict of Interest Clarification

PDF-394KB

10-24-13

06-13 End of Asphalt Load Segregation Concerns

PDF-396KB

03-26-13

 

Expired Materials Bulletins | Construction Bulletins | Construction Memorandums